West & City Centre Area Planning Sub-Committee approved this item on Tuesday 27 May 2008. Below is the council's own wording, with the papers it was decided on.
That the application be approved subject to the conditions detailed in the report and the following additional condition. 1 ยท Notwithstanding the information contained on the approved plans, the height of the approved development shall not exceed 7.3 metres, as measured from existing ground level. Before any works commence on the site, a means of identifying the existing ground level on the site shall be agreed in writing, and any works required on site to mark that ground level accurately during construction works shall be implemented prior to any disturbance of the existing ground level. Any such physical works or marker shall be retained at all times during the construction period. Reason: To establish existing ground level and therefore to avoid confusion in measuring the height of the approved development, and to ensure that the approved development does not have an adverse impact on the character of the surrounding area. REASON:That the proposals, subject to the conditions detailed in the report and above, would not cause undue harm to interests of acknowledged importance, with particular reference to the residential amenity of the neighbours, the visual amenity of the units and the locality and highway safety. As such, the proposal complies with policies SP6, SP7a, SP10, GP1, GP6 and GP15a of the City of York Development Control Local Plan (2005).
Word for word from the decision York published for this meeting.Source: democracy.york.gov.uk
Report to West & City Centre Area Planning Sub-Committee
COMMITTEE REPORT
Committee: West/Centre Area Ward: Guildhall Date: 27 May 2008 Parish: Guildhall Planning Panel
Reference: 08/00475/FULM Application at: 7 Hazel Court York YO10 3DS For: Erection of 7no. units for business, light industrial and storage distribution (B1, B2, and B8) uses with associated parking, service yard and landscaping (1190SQM) (Resubmission) By: Yorvale Properties Ltd Application Type: Major Full Application (13 weeks) Target Date: 29 May 2008
1.0PROPOSAL
1.1The application is for the erection of 7 no. units for business, light industrial and storage distribution (B1, B2, and B8) uses with associated parking, service yard and landscaping (1190sqm) (resubmission).
1.2The site is presently an open piece of land; the surrounding area is predominantly industrial units although there is residential to the north of the site approx 130 metres away. The Tang Hall Beck runs to north of the site (classified as open space).
2.0POLICY CONTEXT
2.1Development Plan Allocation:
City Boundary York City Boundary 0001
DC Area Teams Central Area 0002
Floodzone 2 Flood Zone 2 CONF
Floodzone 3 Flood Zone 3
2.2Policies:
CYE4 Employment devt on unallocated land
CYSP6 Location strategy
CYSP7A
Application Reference Number: 08/00475/FULM Item No: 4b Page 1 of 17 The sequential approach to development
HIGHWAY NETWORK MANAGEMENT - Cycle storage is to be one per unit. This is adequate for B8 use only; the recommended minimum numbers for B1 and B2 range from 2 to 4 depending upon the size of the units - On-site car parking levels equate to approximately only 2 spaces per unit. The recommended maximum levels per individual unit range from one to five spaces depending upon the units size and use class - No specific end users are identified at this time. It seems logical therefore to cater for all contingencies including staff, visitors and customers then, despite minimum standards being met it must be assumed that there is a possibility of associated vehicles being parked outside of the site and within Hazel Court. - There is already a tendency for vehicles associated with other users in Hazel Court to park outside of their respective sites, therefore to ensure that the entrance to this site is maintained clear particularly for use by commercial vehicles then it is our intention to introduce Traffic Regulations measures to restrict on street parking in the vicinity of the site. - Traffic Regulation measures will be sought as a direct consequence of the approval of this proposed development then it is proper that contributions from the applicant should be sought towards the costs of introducing such measures
Application Reference Number: 08/00475/FULM Item No: 4b Page 2 of 17 - There are no associated staffing numbers. It is thought probable that the staff numbers will be sufficient to warrant a Travel Plan being submitted in support of the application. The development is not large enough to warrant a transport assessment.
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
Follow West & City Centre Area Planning Sub-Committee at York and we tell you when its next papers are published, before the meeting rather than after it.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.