Members considered the following options: Option One – implement the proposals as shown in Annex A of the report; Option Two – make any changes to the proposals that Members consider necessary; Option Three – no cycle improvement measures to be implemented. Advice of the Advisory Panel (i) That the Executive Member for City Strategy be advised to approve Option One, to implement the proposals as detailed in Annex A of the report; (ii) That Officers undertake a separate examination of the problems reported in relation to traffic leaving the city wishing to turn left into Water End, turning left at the traffic lights rather than using the slip road onto Water End thereby causing additional congestion. Decision of the Executive Member for City Strategy
Word for word from the decision York published for this meeting.Source: democracy.york.gov.uk
Meeting of Executive Members for City 20 October 2008 Strategy and Advisory Panel
Report of the Director of City Strategy
WATER END – PROPOSED IMPROVEMENTS FOR CYCLISTS
Summary 1. This report advises Members about the results of consultation on proposals to introduce cycle facilities on Water End from the Clifton Green traffic signals to the junction with Salisbury Road. Members are asked to consider the contents of the report and approve the recommended option for implementation.
Background 2. Encouraging more people to cycle has been a long-standing priority for the Council, and this work has recently been given a huge boost by our successful bid to become a ‘Cycling City’.
3. As part of our action plan to address existing gaps in connections and routes, we are seeking to create an ‘orbital cycle route’ to help people to get around the city. This will be located in-between the inner and outer ring roads, and should provide safer and more convenient cycling links to many employment sites, schools, leisure facilities, healthcare and retail sites.
4. The proposed cycle improvements for Water End would form an important part of this orbital route, and would immediately link up with existing cycle facilities west of the Salisbury Road junction with other cycle routes starting in the Clifton area. This would improve cycle connections for many people covering a wide area. The proposed route would also connect with the existing on-road cycle lanes along Clifton Road and Bootham.
5. There are a limited number of river crossings in the city, especially north of the city centre. Providing improved cycle facilities over Clifton Bridge along Water End has huge potential to encourage more people to cycle. For example, it not only forms a very important route for commuter journeys, but also for people travelling to and from school and for accessing leisure facilities. The route also forms a link between the major retail areas of Acomb and Clifton Moor.
6. At present, this section of Water End is not very attractive for cyclists to use. The main problem is the relatively narrow carriageway width (7.3m) which cyclists have to share with heavy traffic flows. The route is usually congested at peak periods, and often has fast moving traffic during the off-peak periods. As a result, many cyclists currently choose to ride on the footways, which causes some conflict with pedestrians. This is particularly apparent when crossing Clifton Bridge, where the lighting columns at the back of the kerb line effectively create a narrow footway space, bounded by the bridge parapets. Another problem is the lack of any facilities to help people to cross Water End to access the riverside cycle/pedestrian route which passes under Clifton Bridge. Given the traffic conditions referred to above, this can be a difficult crossing movement to make whether on foot or on a bicycle. In addition, cyclists often have difficulty in riding past the queue of vehicles approaching the Clifton Green traffic signals, particularly at the ‘pinch point’ adjacent to property number 17 Clifton Green, and regularly resort to riding along the narrow footway to bypass vehicles in order to reach the stop line. The proposals have been developed to address these problems.
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.