CouncilMonitor
194 principal councils 228,996 meetings since 2000 2.8 million official papers archived Straight from each council's own publication system
City of York Council
Planning Main, Thursday 20 November 2008 at 4.30pm

Proposed University Campus Lying Between Field Lane, Common Lane, A64 Trunk Road and Hull Road, York (08/01751/REMM)

Approved Planning 3 papers

Planning Main approved this item on Thursday 20 November 2008. Below is the council's own wording, with the papers it was decided on.

Item38d

Resolved

That the application be approved subject to the conditions listed in the report. REASON: In the opinion of the Local Planning Authority the proposal, subject to the conditions listed in the report, would not cause undue harm to interests of acknowledged importance, with particular reference to policies CYGP1, CYGP4A, CYGP9, CYGP15A, CYNE7, CTED9, CYT4 and CDED9 of the City of York Local Plan Deposit Draft.
Word for word from the decision York published for this meeting. Source: democracy.york.gov.uk

Follow this further

Built from York's papers

What the report saysPro

Report to Planning Main

COMMITTEE REPORT

Committee: Main Planning Ward: Heslington Date: 20 November 2008 Parish: Heslington Parish Council

Reference: 08/01751/REMM Application at: Proposed University Campus Lying Between Field Lane Common Lane A64 Trunk Road And Hull Road York For: Reserved matters application for erection of Theatre, Film and Television building following previous approval of outline application 04/01700/OUT By: University Of York Application Type: Major Reserved Matters Application (13w) Target Date: 7 October 2008

Update At their meeting on 2nd October 2008, consideration was given to the determination of this application. It was resolved that the application be deferred to enable details to be submitted to the Local Planning Authority to demonstrate how the development will provide 10% of its total energy demand from on site renewable sources.

Since that time the applicants Agent has been investigating various options which aim to address the Planning Committee concerns and have submitted an Energy Strategy for Heslington East Cluster 1 and this is appended to this report. The University have developed a site-wide strategy and a Cluster 1 strategy. Both involve the use of biomass as a means of meeting the 10% requirement.

Cluster 1 Requirement and Solution The existing Central Energy Centre in Heslington West comprises a gas fired Combined Heat and Power (CHP) equipment and supplementary gas/oil duel fuel boilers. It is proposed that in the next 5 to 10 years, this existing facility will be redeveloped to accommodate centralised renewable fuels such as biomass and biogas.

A utilities corridor between Heslington West and East is the subject of a current application (08/02272) and this demonstrates how the district heating pipe work will be concealed below ground and link the two campuses.

In recognising the above solutions are more medium term in their delivery, the University proposes to apply for planning permission to erect a biomass boiler at the Heslington East site. This would be in the order of 250 kW rated thermal capacity and generate at least 950,000 kWh of renewable energy a year i.e. 10% of the anticipated requirement of energy of all of the buildings in Cluster 1. Potential suppliers of fuel are based in Escrick, North Newbald and Market Weighton i.e. all within a 25 mile radius of the site. To deliver the amount of fuel required to service the 10% requirement of buildings on Cluster 1, one or two fuel deliveries a week will be required (typically in a 12-15 tonne truck). Hot water generated by the biomass boiler will be circulated around the proposed buildings in Cluster 1.

Application Reference Number: 08/01751/REMM Item No: 4d Page 1 of 17 Comments from the Sustainability officer are:

Planning and developing local sustainable energy solutions involves exploring a combination of renewable and low/zero carbon technologies whilst considering what are feasible and financially viable. The university have considered various renewable and low/zero carbon technologies and have submitted a viable renewable energy strategy for Cluster 1 which also articulates the university's longer term site -wide renewable energy strategy.

After discounting stand alone, building by building technologies such as photovoltaic panels due to viability and feasibility issues, the proposed biomass boiler for Cluster 1 provides a suitable carbon neutral solution (i.e. the amount of carbon produced is equal to the amount of carbon absorbed whilst growing it) to meeting the required 10% renewable energy target. It also compliments the longer term aspirations of the university's site-wide renewable energy strategy, whilst making effective use of the existing CHP system, which, once upgraded, will ultimately lead to efficient use of fuel (ideally from biomass) for all heating and electricity requirements on campus (West and East).

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
Proposed University Campus Lying Between Field Lane, Common Lane, A64 Trunk Road and Hull Road, York (08/01751/REMM)Report 110 KB DownloadRead as text
PDF
Renewable Energy Strategy for Heslington East Cluster 1: Issue 2008-11-10Report 3 MB Download
PDF
TFTV Building, planReport 1.5 MB Download

At this meeting

Whole meeting

Who was there

17 of 19 attended
PF
Councillor Paul FirthCommittee Member, present
SC
Councillor Sonja CrispCommittee Member, present
AD
Councillor Andy D'AgorneCommittee Member, present
RW
Councillor Richard WatsonChair, apologies
CF
Councillor Christina FunnellCommittee Member, present
JG
Councillor John GalvinCommittee Member, present
DH
Councillor David HortonCommittee Member, present
BH
Councillor Ben HudsonCommittee Member, present
CJ
Councillor Ceredig Jamieson-BallCommittee Member, present
RM
Councillor Richard MooreCommittee Member, present
RP
Councillor Roger PierceCommittee Member, present
RP
Councillor Ruth PotterCommittee Member, present

All 19 on the meeting page

On this subject at York

Search all
  1. Proposed University Campus Lying Between Field Lane, Common Lane, A64 Trunk Road and Hull Road, York (08/01751/REMM)This decision
  2. Proposed Enhancements to the University Road Pedestrian Crossing and Cycle Route SchemeApproved
  3. Proposed University Road Pedestrian Crossing Improvements and Cycle RouteApproved
  4. Proposed University Campus Lying Between Field Lane and Low Lane, A64 Trunk Road and Hull Road, York (14/00633/REMM)Approved
  5. Proposed University Campus, Lying Between Field Lane and Low Lane A64 Trunk Road And Hull Road, York. (12/03617/REMM)Approved
  6. Proposed University Campus Lying Between Field Lane and Low Lane A64 Trunk Road and Hull Road, York. (12/02306/FULM).Approved

More from York Planning Main

All decisions
MeetingDecisionOutcome
5 May 2022 MinutesThat subject to the addition of Cllrs Melly and Ayre to the list of apologies, the minutes of the last meeting held o... Approved Open
7 Apr 2022 Minutesi. That the minutes of the meeting held on 3 February 2022 be approved and then signed by the chair as a correct reco... Approved Open
3 Mar 2022 MinutesThat the minutes of the last meeting held on 3 February 2022 be approved at the next meeting. Approved Open
3 Mar 2022 Lindum Group Limited, York Road, Elvington, York YO41 4EP [21/01709/REMM]That the application be approved subject to the conditions listed in the report and the addition of an informative in... Approved Open
3 Feb 2022 MinutesThat, subject to the amendment stated above, the minutes of the last meeting held on 6 January 2022 be approved and s... Approved Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies