Resolved
That the application be approved subject to the conditions listed in the report and subject to the following additional and amended conditions. 1 Condition 10 – Development shall not begin until details of foul and surface water drainage works have been submitted and approved in writing by the Local Planning Authority, and carried out in accordance with these approved details. Reason – So that the Local Planning Authority may be satisfied with these details for the proper drainage of the site. Condition 11 – Peak surface water run-off from the development shall be attenuated to 70% of the existing rate, in accordance with a scheme to reduce run off to be submitted to and agreed in writing by the Local Planning Authority (based on 140 I/s/ha of connected impermeable areas). The scheme submitted shall include storage volume calculations, using computer modelling, allowing for a 1:30 year storm with no surface flooding along with no internal flooding of buildings or surface run-off from the site in a 1:100 year storm. Proposed areas within the model shall also include an additional 20% allowance for climate change. The modelling shall use a range of storm durations, with both summer and winter profiles, to find the worst case volume required. Details of run off rates including calculations of both the existing and proposed rates shall also be submitted to and approved in writing by the Local Planning Authority prior to the commencement of the development. Reason – In the interests of sustainable drainage and to comply with guidance contained within Planning Policy Statement 25 (Development and Flood Risk). Condition 12 – The first reserved matters application submitted in pursuance of this outline planning permission shall be accompanied by an initial Code for Sustainable Homes (CSH) Design Stage assessment for the development. This shall indicate that at least a CSH level 3 star rating shall be achieved. This shall be followed by the submission of a Code for Sustainable Homes Final Certificate (issued at post construction stage) which shall be submitted to the Local Planning Authority after completion and before first occupation of the building, and shall confirm that at ... view the full minutes text for item 55b