Playing Field, Millfield Lane, Nether Poppleton, York (09/01940/FUL)
ApprovedPlanning2 papers
West & City Centre Area Planning Sub-Committee approved this item on Thursday 18 March 2010. Below is the council's own wording, with the papers it was decided on.
That the application be approved subject to the conditions listed in the report. REASON: The proposal, subject to the conditions listed in the report, would not cause undue harm to interests of acknowledged importance, with particular reference the residential amenity of the neighbours, the visual amenity of the locality and the greenbelt. As such, the proposal complies with Policies GP1, GB1, and GP5 of the City of York Council Development Control Local Plan (2005); national planning guidance contained in Planning Policy Guidance 2 "Green Belts", Planning Policy Statement 22 "Renewable Energy" and "Planning for Renewable Energy - A Companion Guide to PPS22".
Word for word from the decision York published for this meeting.Source: democracy.york.gov.uk
Report to West & City Centre Area Planning Sub-Committee
COMMITTEE REPORT
Committee: West/Centre Area Ward: Rural West York Date: 18 March 2010 Parish: Nether Poppleton Parish Council
Reference: 09/01940/FUL Application at: Playing Field Millfield Lane Nether Poppleton York For: Erection of 1no. wind turbine with 18.3m mast By: [name removed], Poppleton Junior Football Club Application Type: Full Application Target Date: 6 January 2010 Recommendation: Approve
1.0PROPOSAL
1.1The application is for the erection of 1 no. wind turbine. The turbine would be sited in the northeast corner of the site. The site is within the green belt.
1.2The specification of the turbine was revised at the request of the agent/applicant based on funding issues. The 11kw proposed two rotor blade turbine would be 18.3 metres to the hub, and 24.8 metres in height to the tip of the rotor blade. The turbine is to provide energy for the clubhouse that gained permission (09/00474/FUL) at sub-committee on 16 July 2009. The proposed turbine would be sited 185 metres from the club house and 175 metres from the nearest dwellings (in Nursery Court).
2.0POLICY CONTEXT
2.1Development Plan Allocation:
City Boundary GMS Constraints: York City Boundary 0001
DC Area Teams GMS Constraints: West Area 0004
2.2Policies:
CYSP2 The York Green Belt
CYSP3 Safeguarding the Historic Character and Setting of York
3.2The revised application shows that at a distance of 163m, the approximate distance to the nearest residential dwellings at Nursery Court, the expected noise level from the turbine varies from 31dB(A) to 37dB(A) depending on wind speed.
3.3Whilst during the daytime these noise levels are less likely to be a problem, due to the noise produced by the York outer ring road (A1237) located approximately 350m from the site and 500m + from the nearest residential dwelling to the proposed turbine, have concerns about the noise level adversely affecting the amenity of residents during the quieter hours of the day and night. Currently no details have been submitted on the background noise levels are the site during the quietest times of the day and night.
3.4In order to assess the potential effect that the turbine could have on these dwellings details on the background noise levels of the site would request that information be provided on the background noise levels at the site during the quietest time of the day and at night. In view of this I would request that the applicant undertakes a 24 hour noise monitoring exercise between 11pm on a Saturday evening and 11pm on a Sunday evening to determine the background noise environment. Such monitoring should be taken as near to the closest residential property at Nursery Court as possible. Details of the Leq and L90 for the monitoring period should be provided in 1 hour time periods. These results should then be compared with the predicted levels of noise from the wind turbine at the nearest residential dwellings.
CITY DEVELOPMENT
3.5Adopted Regional Spatial Strategy sets out sub-regional energy targets to 2010 and 2021 and states that all development strategies, plans and decisions will maximise renewable energy capacity be delivering at least these targets. The CYC target for installed renewable energy is 11mw to 2010 and 31mw to 2021.
3.6Wind turbines are not an appropriate use within the green belt so a very special circumstances argument would need to be assessed.
3.7The proposed wind turbine would be located within an area preventing coalescence and is therefore within one of the areas defined as important to preserving the historic character and setting of York, as set out in "The approach to the Green Belt Appraisal" (2003). However it is noted that the site is already developed for sports and recreation use and the wind turbine would be ancillary use to it.
LANDSCAPE ARCHITECT
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
Follow West & City Centre Area Planning Sub-Committee at York and we tell you when its next papers are published, before the meeting rather than after it.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.