That Cabinet agree to: i) Note the results of the consultation relating to Phase 1 of the A19 south Pinch Point Scheme, as shown at Annex A of the report; ii) Approve the proposed design for Phase 1, as shown at Annex D of the report, and direct Officers to proceed to implementation; iii) Delegate authority to the Director of City and Environmental Services to make any required alterations to the scheme as a result of the Road Safety Audit recommendations, in consultation with the Cabinet Member for Transport, Planning and Economic Development . Reason: In order comply with the Department for Transport funding submission, to tackle congestion through capacity improvements for highway works in connection with the planned Germany Beck development. That Cabinet agree to: i) Note the results of the consultation relating to Phase 1 of the A19 south Pinch Point Scheme, as shown at Annex A of the report; ii) Approve the proposed design for Phase 1, as shown at Annex D of the report, and direct Officers to proceed to implementation; iii) Delegate authority to the Director of City and Environmental Services to make any required alterations to the scheme as a result of the Road Safety Audit recommendations, in consultation with the Cabinet Member for Transport, Planning and Economic Development . 1. Reason: In order to tackle congestion through capacity improvements for the A19 and comply with the DfT funding submission.
Word for word from the decision York published for this meeting.Source: democracy.york.gov.uk
Report of Cabinet Member for Transport, Planning & Economic Development
Pinch Point Scheme, A19 south Transport Corridor – Phase 1
Summary 1. This report presents a design proposal for the first phase of the Pinch Point Scheme concerning the A19 south transport corridor, and asks for approval from Cabinet to implement the proposed engineering works to the A64/A19 interchange, following recent consultation. Recommendation 2. That Cabinet:
i) Notes the results of the consultation relating to Phase 1 of the A19 south Pinch Point Scheme, as shown at ANNEX A;
ii) Approves the proposed design for Phase 1, as shown at ANNEX D, and directs Officers to proceed to implementation. iii) Delegate’s authority to the Director of City and Environmental Services to make any required alterations to the scheme as a result of the Road Safety Audit recommendations, in consultation with the Cabinet Member for Transport, Planning and Economic Development.
Background 3. City of York Council (CYC) submitted a bid to the Department for Transport (DfT) in February 2013 for local transport pinch-point funding for works on the A19 south, between the Designer Outlet and Fulford village. The principal aim of the DfT’s pinch-point fund was to tackle congestion through capacity improvements; and support growth.
4. In October 2013, it was announced that CYC had been successful and were to receive £1.93million towards the scheme. This was a contribution towards an overall package of works totalling £4.716million, the majority of this cost being concentrated on highway works associated with the planned Germany Beck development and borne by the private sector (i.e. Persimmon plc).
5. CYC’s stated objectives for the funding included providing an access to the proposed Germany Beck development; improving the resilience of the highway network during floods; improving access to the Designer Outlet Park & Ride site; and reducing public transport journey times on the A19. In addition, it is appreciated that the now proposed scheme for Phase 1 will also help to ease congestion / a recognised bottleneck and ‘future-proof’ somewhat for any future growth.
6. However, since CYC were awarded the funding, further feasibility work has since ruled out certain elements of the originally-bid-for scheme. In addition, existing on-site observations, traffic-surveys, and results from modelling work has led Officers to revise the scope of the scheme and fully explore all feasible options to try to make the best use of the available funding and provide the greatest benefit to highway users.
7. Being a major capital scheme, covering approximately 1.2km of the A19 road between just south of the Designer Outlet to the suburban village of Fulford, Officers considered it logical to divide this large scheme into separate manageable phases – the intention being that each phase could be approached and progressed independently, albeit holistically to the overall scheme and linking into the proposed works being undertaken as part of the Germany Beck development. A plan of proposed phases for the full Pinch Point Scheme is shown at ANNEX B. Phase 1 Proposal 8. This first phase comprises proposed improvements to the A19 northbound approach to its interchange with the grade-separated A64 bypass. Works also include proposed improvements made through the interchange itself (inbound). The existing layout is shown at ANNEX C, and the proposed layout design for Phase 1 is shown at ANNEX D.
9. These are largely capacity improvements for all northbound traffic originating from the Selby direction, but will also improve journey times through the interchange for inbound public transport:-
o Carriageway widening of the A19 inbound approach to the southern roundabout (A64/A19/Designer Outlet), increasing the number of traffic lanes from two to three. Subsequent increased stacking space for traffic and increased capacity;
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.