That the application be approved subject to the conditions listed in the report and a Section 106 Agreement. Reason: Giving significant weight to Government priorities in this respect, there are no policy grounds to resist the change of use of the majority of the building and overall the external works will improve the setting. There would be no harm to designated heritage assets. A Section 106 agreement would secure contributions towards car club membership and drive time, which would be offered to residents of the host building, and towards local education provision at Scarcroft School and pre-school facilities in the catchment area.
Word for word from the decision York published for this meeting.Source: democracy.york.gov.uk
Date: 21.4.2016 Ward: Micklegate Team: Major and Parish: Micklegate Planning Commercial Team Panel
Reference: 15/01256/FULM Application at: Hudson House Toft Green York YO1 6JT For: Conversion of first, second and third floors of wings A and B and all floors of wing C from offices to 82no. flats (use class C3) and external alterations By: Signal Property Investments LLP Application Type: Major Full Application (13 weeks) Target Date: 6 May 2016 Recommendation: Approve subject to Section 106 Agreement
1.0PROPOSAL
APPLICATION SITE
1.1The application relates to the office block known as Hudson House. The building was completed in 1968 and was intended to be the new headquarters for British Rail, Eastern Region. It was designed by Laings (chief architect Sydney Greenwood).
1.2The building is concrete framed, and in the Brutalist style. It has 4 wings and is referred to as being pin-wheel in plan. The two blocks nearest Toft Green are 6 storeys in height; the two nearer the City Wall are 4 storeys. The building’s scale is relative to the City Walls and buildings fronting Micklegate.
1.3The building is positioned between a late C20 office block - George Stephenson house and the C21 Hilton Hotel. The City Walls are to the west. On the opposite side of Toft Green are a mix of commercial buildings, including offices and the York Brewery.
1.4The site is within the Central Historic Core Conservation Area and is prominent from the grade I listed City Walls.
PROPOSALS
1.5The building has not been fully occupied for sometime. At the time the application was submitted, it was 50% full and occupied by numerous companies, most on short-term leases.
Application Reference Number: 15/01256/FULM Item No: 4e 1.6 Proposed is a change of use of part of the building to 82 residential units (29 1- bed, 53 2-bed). The remaining office space; 4,794 sq m gross/3,510 sq m net, would be refurbished to 'grade A' standard. The applicants are not proposing any affordable housing. The development has been subject to an independent viability assessment and this position has been accepted.
1.7The building would be used as follows -
- Office - at ground floor in 3 of the 4 wings and on the upper floor of the wing facing Toft Green - Residential - on the upper floors of the remaining 3 wings and the ground floor wing on the George Stephenson House side would be used as ancillary space for the residents (access/storage/gym)
1.8External changes are also proposed and these would be as follows -
- Entrance canopies removed and associated works to improve the prominence and visual quality of the entrances - Windows replaced, including use of spandrel panels to give privacy where required to residential areas. Spandrel panels would be in metalized colours (gold, silver, bronze and copper) with an additional texture/pattern; a subtle appearance which will allow the concrete structure to remain prominent. - New lift for residential aspect of the scheme, located on the SW side of the building. - Roof-lights to ground floor space, which is adjacent to, and set below, Toft Green. - Replacement soffit (with a glazed metal finish).
1.9Landscaping alterations are proposed also, including reconfiguration of the car parking area (with less spaces overall and tree planting) between the host building and West Offices.
Planning history
1.10A prior notification application (15/02965/ORC) has been made to change the use of the building to residential. As such the change of use from offices to residential aspect of the scheme can occur as permitted development under Schedule 2 Part 3 Class O of the 2015 General Permitted Development Order.
2.0POLICY CONTEXT
2.1Legislation and National Policy
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.