That the application be approved subject to the following amendment to condition 2: Condition 2 Add the following drawing numbers: 1. 2350005 – Development Boundary 2. ARBTECH TPP01 Rev A – Tree Protection Plan Reason: i. Naburn Lock is located on the River Ouse in a rural location to the south of Naburn village. The construction of the locks (in 1757 and 1888) has created an island upon which is located the workshops, stores and offices associated with the operation and maintenance of the lock. Directly to the east lies the Naburn Banqueting House, a Grade II listed building, together with the lock keeper's house. The locks themselves are separately listed at Grade II. Planning permission is sought for construction of a hydroelectric generating plant together with associated infrastructure on the western bank of the island. ii. The proposal would constitute inappropriate development in the Green Belt which is by definition harmful to the Green Belt and should not be approved other than in very special circumstances. However, it is considered that the impact of the proposal on the openness of the Green Belt would be mitigated by the characteristics of the locality and its setting adjacent to Naburn Lock. Whilst the proposal represents a relatively small scale project, Central Government guidance in the NPFF makes it clear that local planning authorities should recognise that even small-scale projects provide a valuable contribution to cutting greenhouse gas emissions, and approve the application if its impacts are (or can be made) acceptable. With this in mind, and bearing in mind the nature of the location and characteristics of the application site, it is considered that very special circumstances exist that clearly outweigh the harm to the Green Belt. No other harms have been identified arising from the proposal. iii. In terms of the previously identified significant concerns relating to harm to local habitat and biodiversity the proposal ... view the full minutes text for item 36.
Word for word from the decision York published for this meeting.Source: democracy.york.gov.uk
Date: 16 January 2020 Ward: Wheldrake Team: Major and Parish: Naburn Parish Council Commercial Team
Reference: 18/02552/FUL Application at: Naburn Locks York Road Naburn York For: Hydroelectric generation plant and associated infrastructure including turbine house, hydraulic channels, intake screen, crane pad and electrical substation By: Ewan Campbell-Lendrum Application Type: Full Application Target Date: 1 October 2019 Recommendation: Approve
1.0PROPOSAL
1.1Naburn Lock is located on the River Ouse in a rural location to the south of Naburn village. The construction of the locks took place in 1757 and 1888 and has created an island upon which is located the workshops, stores and offices associated with the operation and maintenance of the lock. There was formerly a water mill on the island (constructed between 1813 and 1817) which fell out of use around 1955 and was demolished in 1958. The locks themselves are listed at Grade II (“Old and New Lock”). Directly to the east lies the Naburn Banqueting House, a vacant Grade II listed building, together with the lock keeper's house. Access to the site is along a single track road from Naburn Lane, which also serves the Naburn Lock caravan park, located to the east. Naburn Lock is accessible to members of the public and there is a car park and information board at the end of the access road.
1.2Planning permission is sought for construction of a hydro electric generating plant together with associated infrastructure including a reconstructed weir on the western side of the island. The site forms a habitat for the ocean and river lamprey, both of which species are identified as being critically endangered species and forms a principal feeder area for the Humber Estuary Special Area of Conservation (SAC), Special Protection Area and RAMSAR site. Since submission the proposal has been amended in respect of the design of the proposed fish pass and the operation of the plant in order to address ecological concerns.
1.3The proposal comprises two Archimedes screw turbines, a multi-species fish pass, a turbine house building, hydraulic channels, trash screening and access improvements. The scheme is expected to generate a peak power output of less than 500kW and an average annual energy production of 1.2 GWh. The applicant states that this is sufficient to power around 310 homes and provides an effective CO2e saving of around 620 tonnes per year. The intake would be situated within the island Application Reference Number: 18/02552/FUL Item No: 4b bank just upstream of the weir, with water passing through coarse trash screening before arriving at the sluice gates and turbine house. The screw turbines would discharge into an outfall channel that re-joins the main river just downstream of the weir. A new fish pass will be constructed along the left-hand side of the hydropower scheme.
1.4Above ground, a powerhouse and substation would be erected with intake and outlet channels formed below ground level. The turbine house will consist of a building measuring 11 x 8.1 x 5.2 (maximum height) metres above bank level. A grid connection would be formed by a new length of buried cable from the turbine house to the nearest suitable connection pole. The cable will be buried in order to minimise visual impact. The applicant estimates that the hydro-electric generating station with the turbine and associated infrastructure, would have a minimum life of 40 years.
2.0POLICY CONTEXT
2.1Development Plan Allocation:
City Boundary GMS Constraints: York City Boundary 0001
DC Area Teams GMS Constraints: East Area (1) 0003
Floodzone 2 GMS Constraints: Floodzone 2 Listed Buildings GMS Constraints: Grade 2; Old And New Lock, Naburn
2.2Publication Draft Local Plan (2018):
CGP15A Development and Flood Risk
CYGB1 Development within the Green Belt
CYHE4 Listed Buildings
CYNE6 Species protected by law
3.0CONSULTATIONS
INTERNAL:-
PUBLIC PROTECTION
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.