CouncilMonitor
194 principal councils 228,996 meetings since 2000 2.8 million official papers archived Straight from each council's own publication system
City of York Council
Planning Main, Thursday 16 January 2020 at 4.30pm

Smith And Nephew Plc Research Centre, Innovation Way, Heslington, York YO10 5DF [19/02011/FULM]

Approved Planning 2 papers

Planning Main approved this item on Thursday 16 January 2020. Below is the council's own wording, with the papers it was decided on.

Item38

Resolved

That the application be approved subject to the conditions listed in the report, additional condition relating to planting and amendments to conditions 2 and 4: Additional condition That the planting on the site be retained for perpetuity. Condition 2 (Plans) Amended to remove reference to the landscape proposals and tree removal drawings Condition 4 (Landscaping) Amended to require a revised landscaping scheme to be submitted for approval as ... view the full minutes text for item 38.
Word for word from the decision York published for this meeting. Source: democracy.york.gov.uk

Follow this further

Built from York's papers

What the report saysPro

Report to Planning Main

COMMITTEE REPORT

Date: 16 January 2020 Ward: Hull Road Team: East Area Parish: Heslington Parish Council

Reference: 19/02011/FULM Application at: Smith and Nephew Plc Research Centre Innovation Way Heslington York For: Change of use of former research centre (Use Class B1) to non-residential institution for academic use (Use Class D1) with associated external works By: University of York Application Type: Major Full Application (13 weeks) Target Date: 19 December 2019 Recommendation: Approve

1.0PROPOSAL

1.1The proposal seeks full planning permission to change the use of an existing building of 8,061 sq.m. floorspace, from its last use as a research and development facility (Use Class B1(b)) to use by the University of York for its York Management School and the Department of Electronic Engineering (Use Class D1).

1.2The Management School would occupy the main building providing academic offices, seminar rooms, tutorial facilities and a café, with laboratory space for the Electronic Engineering Department occupying the annex following the insertion of a mezzanine. Some external works are included as part of the application, including insertion of double doors and changes to other entrances, provision of aluminium louvres, insertion of skylights, a glazed link connecting the main building and annex, and changes to the car parking and external space. Changes to existing landscape on site are proposed with removal of 33 trees across the site, particularly on the Church Lane frontage to increase light penetration the building and improve the sense of arrival, with replacement planting at the north-west entrance.

1.3The site lies within Flood Zone 1. There is a woodland to the eastern and southern site boundaries that is protected by Tree Preservation Order 15/1986-W1 and W2. The site’s planning history includes applications approved in 2009 for alterations to the access and car parking (09/01218/FULM) and a small rear extension approved (09/01080/FUL).

2.0POLICY CONTEXT

2.1City of York Draft Local Plan Incorporating the 4th set of changes – Development Control Local Plan. Approved April 2005:

GP1 – Design Application Reference Number: 19/02011/FULM Item No: 4d GP4b – Air Quality GP9 – Landscaping NE1 – Trees, Woodlands and Hedgerows T4 – Cycle Parking Standards E3b – Existing and Proposed Employment Sites

2.2City of York Local Plan – Publication Draft February 2018 (Regulation 19 Consultation):

SS22 – University of York Expansion EC2 – Loss of Employment Land ED1 – University of York D1 – Placemaking D2 – Landscape and Setting GI4 - Trees and Hedgerows T1 – Sustainable Access ENV1 – Air Quality

3.0CONSULTATIONS

Public Protection

3.1Request electric vehicle charging points in line with NPPF and CYC Low Emissions Strategy.

Highway Network Management

3.2No objection to the development, subject to cycle parking provision being appropriate. Request conditions HWAY18 and HWAY19.

4.0REPRESENTATIONS

4.1None received.

5.0APPRAISAL

5.1The key issues are:

- Principle of development - Loss of employment use - Expansion of University provision - Landscaping and trees Application Reference Number: 19/02011/FULM Item No: 4d - Parking and highway safety - Design and visual amenity

POLICY CONTEXT

Development Plan

5.2Section 38(6) of the Planning and Compulsory Purchase Act 2004 requires that determinations be made in accordance with the development plan unless material considerations indicate otherwise. For the purposes of section 38(6) the relevant development plan for York comprises the retained policies in the Yorkshire and Humber Regional Spatial Strategy ("RSS") saved under the Regional Strategy for Yorkshire and Humber (Partial Revocation) Order 2013. None of the adopted Neighbourhood Plans relate to this area.

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
Smith And Nephew Plc Research Centre, Innovation Way, Heslington, York YO10 5DF [19/02011/FULM]Report 259 KB DownloadRead as text
PDF
Smith And Nephew Plc Research Centre, Innovation Way, Heslington, York YO10 5DF [19/02011/FULM] Site PlanPlan 3.8 MB Download

At this meeting

Whole meeting

Who was there

15 of 15 attended
CC
Councillor Chris CullwickChair, present
MP
Councillor Michael PavlovicVice-Chair, present
NA
Councillor Nigel AyreCommittee Member, present
JB
Councillor James BarkerCommittee Member, present
AD
Councillor Andy D'AgorneCommittee Member, present
SD
Councillor Simon DaubeneyCommittee Member, present
PD
Councillor Paul DoughtyCommittee Member, present
CD
Councillor Claire DouglasCommittee Member, present
SF
Councillor Stephen FentonCommittee Member, present
FF
Councillor Fiona FitzpatrickCommittee Member, present
AH
Councillor Andrew HollyerCommittee Member, present
PK
Councillor Peter KilbaneCommittee Member, present

All 15 on the meeting page

More from York Planning Main

All decisions
MeetingDecisionOutcome
5 May 2022 MinutesThat subject to the addition of Cllrs Melly and Ayre to the list of apologies, the minutes of the last meeting held o... Approved Open
7 Apr 2022 Minutesi. That the minutes of the meeting held on 3 February 2022 be approved and then signed by the chair as a correct reco... Approved Open
3 Mar 2022 MinutesThat the minutes of the last meeting held on 3 February 2022 be approved at the next meeting. Approved Open
3 Mar 2022 Lindum Group Limited, York Road, Elvington, York YO41 4EP [21/01709/REMM]That the application be approved subject to the conditions listed in the report and the addition of an informative in... Approved Open
3 Feb 2022 MinutesThat, subject to the amendment stated above, the minutes of the last meeting held on 6 January 2022 be approved and s... Approved Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies