Elvington Water Treatment Works, Kexby Lane, Elvington, York [19/02522/FUL]

Approved Planning 2 papers

Planning Main approved this item on Tuesday 11 February 2020. Below is the council's own wording, with the papers it was decided on.

Item42d

Resolved

That the application be Approved subject to the planning conditions listed in the report, w ith the addition of the following condition: 1. Notwithstanding the information contained on the application form, details of the position, nature and timing of artificial lighting proposed for the external staircase shall be submitted to and approved in writing prior to its use. Reasons: (i) The use and scale of the proposed silos is such that they are inappropriate development in the Green Belt. They would have a moderately harmful impact on the visual character and amenity of the landscape. Green Belt policy states that the application should be refused unless any harm resulting from the proposal is clearly outweighed by other considerations. (ii) In assessing whether very special circumstances exist, regard should be given to the existing unimplemented consent for plant buildings for the same purpose. Very special circumstances were considered to exist to justify the 2018 consent. The existing scheme would be on the same location in the site and both cannot be implemented together. The current scheme would have a slightly lesser impact on openness. (iii) The treatment works is located wholly in the Green Belt. The proposed essential structures cannot be located outside the Green Belt. It is considered that the pressing need for the structures to sustain and improve the fresh water supply for a large area of Yorkshire would outweigh the modest harm to the Green Belt. (iv) To ensure that lighting is not intrusive within the countryside location.
Word for word from the decision York published for this meeting. Source: democracy.york.gov.uk

Follow this further

Built from York's papers

What the report saysPro

Report to Planning Main

COMMITTEE REPORT

Date: 11 February 2020 Ward: Wheldrake Team: East Area Parish: Elvington Parish Council Reference: 19/02522/FUL Application at: Elvington Water Treatment Works Kexby Lane Elvington York For: Replacement plant building with 2no. external storage silos, access staircase and hardstanding area for the preparation of calcium hydroxide (part retrospective) (revised scheme) By: [name removed] Type: Full Application Target Date: 23 January 2020 Recommendation: Approve

1.0PROPOSAL 1.1 The application site is Elvington Water Treatment Works located north-east of Elvington village. It contains a mixture of functional buildings, hard standing, grassed areas and water storage. It is located next to the River Derwent for the purposes of river abstraction for raw water. The entrance to the site is accessed from Dauby Lane close to the entrance to the village primary school. The nearest house is around 360 metres from the fenced enclosure of the site. There is also landscaped buffer land outside the fence that is within the ownership of the applicant. 1.2 It is proposed to erect two 17.7 metre silos and an associated 9.6 metre high building related to the preparation of calcium hydroxide. They would be grey in colour. The chemical is used in the process of the treatment of drinking water. The building is proposed on grass scrubland at the south western part of the enclosed area. It is of a functional design. It would be located around 440m from the nearest home. There are existing 20m silos within the site that serve a similar role. These will become redundant if the new development takes place. They are not proposed to be removed in the foreseeable future. This is because they are adjoining buildings that contain plant and equipment for other chemical dosing processes. The removal of the silos would require the treatment works to be shut down for a considerable time. It cannot be shut for more than 4 hours given the importance of its role. The application should be judged on the basis that the existing silos will remain once redundant. RELEVANT HISTORY 1.3 In November 2018 Planning Committee approved a similar scheme that was proposed to serve the same purpose and was located in the same position as the structures proposed in the current application. The 2018 permission has not been Application Reference Number: 19/02522/FUL Item No: 4d implemented. The current scheme is an alternative design and it is not possible to implement both schemes together. The main difference between the two schemes is that the previous one housed the large silos in a large rectangular building. The current scheme has the silos open to the elements. They would be 2.5 metres lower in height than the height of the building approved in 2018. 1.4 There have been a number of other planning permissions over the past 20 years for plant and buildings related to the treatment of water on site. 1.5 In 2016 (15/02639/FULM) planning permission was granted for the Installation of a solar photovoltaic array with associated infrastructure including kiosks, security fencing, CCTV and internal access track on land within the ownership of Yorkshire Water but outside the fenced enclosure of the works. This has not been implemented and the permission expired in April 2019. 1.6 The application site lies within the Green Belt as contained within the Development Plan. 2.0 POLICY CONTEXT Yorkshire and Humber Regional Spatial Strategy (RSS)

2.1The Yorkshire and Humber RSS was revoked in 2013 with the exception of the policies relevant to the York Green Belt. Policy Y1(c) states that plans, strategies, investment decisions and programmes for the York sub area should in the City of York LDF. It states that the LDF should define the detailed boundaries of the sections of the outer boundary of the York Green Belt about 6 miles from York city centre.

National Planning Policy Framework

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
Elvington Water Treatment Works, Kexby Lane, Elvington, York Site PlanPlan 2.5 MB Download
PDF
Elvington Water Treatment Works, Kexby Lane, Elvington, York [19/02522/FUL]Report 329 KB DownloadRead as text

At this meeting

Whole meeting

Who was there

17 of 17 attended
CC
Councillor Chris CullwickChair, present
MP
Councillor Michael PavlovicVice-Chair, present
NA
Councillor Nigel AyreCommittee Member, present
JB
Councillor James BarkerCommittee Member, present
AD
Councillor Andy D'AgorneCommittee Member, present
SD
Councillor Simon DaubeneyCommittee Member, present
PD
Councillor Paul DoughtyCommittee Member, apologies, sent representative
CD
Councillor Claire DouglasCommittee Member, present
SF
Councillor Stephen FentonCommittee Member, present
FF
Councillor Fiona FitzpatrickCommittee Member, apologies, sent representative
AH
Councillor Andrew HollyerCommittee Member, present
PK
Councillor Peter KilbaneCommittee Member, present

All 17 on the meeting page

On this subject at York

Search all
  1. Elvington Water Treatment Works, Kexby Lane, Elvington, York [19/02522/FUL]This decision
  2. Elvington Water Treatment Works, Kexby Lane, Elvington, York [24/01238/FULM] (7.06pm)Approved
  3. Elvington Water Treatment Works [18/01786/FUL]Approved
  4. Elvington Water Treatment Works, Kexby Lane, Elvington, York (15/02639/FULM)Approved
  5. Elvington Water Treatment Works, Kexby Lane, Elvington, York (07/02915/FUL)Approved

More from York Planning Main

All decisions
MeetingDecisionOutcome
5 May 2022 MinutesThat subject to the addition of Cllrs Melly and Ayre to the list of apologies, the minutes of the last meeting held o... Approved Open
7 Apr 2022 Minutesi. That the minutes of the meeting held on 3 February 2022 be approved and then signed by the chair as a correct reco... Approved Open
3 Mar 2022 MinutesThat the minutes of the last meeting held on 3 February 2022 be approved at the next meeting. Approved Open
3 Mar 2022 Lindum Group Limited, York Road, Elvington, York YO41 4EP [21/01709/REMM]That the application be approved subject to the conditions listed in the report and the addition of an informative in... Approved Open
3 Feb 2022 MinutesThat, subject to the amendment stated above, the minutes of the last meeting held on 6 January 2022 be approved and s... Approved Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies