Resolved
i. Approved the project outlines including the extension of the Acomb Road scheme to include the section from Beckfield Lane to Hebden Rise, with a number of individual changes to the documents detailed in the minutes. To delegate to the Director of Environment, Transport and Planning in consultation with the Executive Member further amendments to the outlines of the projects. Reason: To enable officers to progress projects effectively within the Active Travel Programme. ii. Agreed to delegate to the Director of Environment, Transport and Planning in consultation with Director of Governance and Chief Finance Officer the procurement of design resource for the ‘A19 Cycle Scheme’ and the A1237 section over the River Ouse’ scheme. Reason: To support progress of the identified projects. iii. Confirmed and approved the proposed prioritisation of projects within the programme. Reason: To support the creation of more accurate programme timescales and allow more effective assignment of resource. iv. Confirmed and approved the budget allocation follows the above prioritisation in decision iii. This approach being one that assigns funding to projects as and when the necessary feasibility information becomes available, rather than waiting for information on all projects within the programme. Reason: To ensure an appropriate balance is reached between obtaining value for money and the expeditious delivery of schemes. i. Approved the project outlines including the extension of the Acomb Road scheme to include the section from Beckfield Lane to Hebden Rise, with a number of individual changes to the documents detailed below to the : Annex 2 - A19 Cycle Scheme the objectives be revised to state: “Improve junctions for cyclists (without detriment to pedestrians) – Make changes to the junctions of Clifton Green / Water End and Rawcliffe Lane / Shipton Road to improve the amenity for cycling (and where possible for walking) ”. That the scope be revised to state “Consideration of solutions to enable safe pedestrian access to, and use of, existing bus stops (including meeting needs of disabled passengers). ” Annex 3 – Acomb Road Cycle Scheme the geographical scope of the project be amended and now reaches “between Beckfield Lane and the Fox junction”. It was confirmed that design work for the scheme could commence on the entire geographical scope, however, construction work west of Hebden Rise may occur in a later phase than the other elements, dependent upon consultation outcome and interactions with the Acomb Regeneration scheme. Annex 6 - A1237 Section over the River Ouse it was decided that a reduction in speed limit can be considered to achieve the project objectives. This can include consideration of a reduction in speed limits in the adjacent location of Great North Way. It was noted that the scoping document would not require changes to project outline required, consideration of speed limit reduction was already identified within the document. Annex 7 - City Centre North South Cycle Route that the project description be revised to state: “ Create a clear, legible, attractive alternative route for cyclists instead of the footstreets or the inner ring road .” Also that the scope be revised to: “Consideration of LTN 1/20. Green scoring solutions are preferred, however non green scoring solutions can be considered if they achieve the stated objectives. This includes the location of Ogleforth / Aldwalk junction ” Annex 8 – City Centre Bridges that the scope revised to state “Consideration of solutions that require changes to traffic regulation orders, including lower speed limits .” Also to revise the scope ... view the full minutes text for item 48.