i. That Option 3: Improved Signage Only, be approved. Eight additional repeater signs to be provided along the full length of New Lane to support the existing signage. Reason: Following consultation with residents of the street there was no clear desire for the introduction of vertical traffic calming, despite the previous petition request. The measures do not offer value for money and when considered alongside the potential detrimental effects of such features on residents’ quality of life the negative effects were considered to outweigh the positive impact in this case. i. That Option 3: Improved Signage Only, be approved. Eight additional repeater signs to be provided along the full length of New Lane to support the existing signage. Reason: Following consultation with residents of the street there was no clear desire for the introduction of vertical traffic calming, despite the previous petition request. The measures do not offer value for money and when considered alongside the potential detrimental effects of such features on residents’ quality of life the negative effects were considered to outweigh the positive impact in this case.
Word for word from the decision York published for this meeting.Source: democracy.york.gov.uk
Report to Decision Session - Executive Member for Transport, 13 pages
Summary
1. The report details the results of a consultation exercise with regard speed management proposals for New Lane, Acomb following on from the completion of a feasibility study and the receipt of a 124-signature petition.
2. The Executive Member is asked to decide how to proceed with speed management features on New Lane, Acomb.
Recommendations
3. The Executive Member is asked to: i. Approve Option 3: Improved Signage Only. Eight additional repeater signs to be provided along the full length of New Lane to support the existing signage. Reason: Following consultation with residents of the street there is no clear desire for the introduction of vertical traffic calming, despite the previous petition request. The measures do not offer value for money and when considered alongside the potential detrimental effects of such features on residents’ quality of life the negative effects are considered to outweigh the positive impact in this case.
Background
4. A speeding complaint made by a local resident in 2019 led to New Lane being fed into the 95 Alive Speed Management process for investigation. The initial 95 Alive review highlighted that speeds in New Lane were higher for southbound traffic, particularly the 85th percentile figure, and as such the recommended action was to consider an engineering solution to reduce traffic speeds.
5. The 2020/21 Speed Management Scheme programme identified New Lane, Acomb for a feasibility study.
6. The report looked at existing traffic speeds on New Lane, and proposed measures to improve compliance with the signed 20mph speed limit.
7. The report also considered opportunities a speed management scheme might present for improving facilities for pedestrians wanting to cross New Lane near the entrance to West Bank Park.
8. The feasibility report is attached as Annex 1. The report recommended that additional speed limit repeater signs were installed. The report was considered at Transport Board in July 2022 and approval was given to progress to design stage for the recommended option.
9. However, a petition requesting “speed calming measures” on New Lane had been submitted at the full council meeting in April 2022. As this was within the scope of the portfolio of the Executive Member of Transport it was formally acknowledged in a report to an Executive Member decision session meeting on 28 September 2022. Given the strength of feeling expressed in the petition, it was agreed that, as the work progresses through design (including consultation), a number of options would be presented to residents for comment. The results of the consultation would then be brought back to Executive Member Decision Session for decision.
Associated projects
10. Work is ongoing for the following associated projects in the area:
A full review of the Our Lady Queen of Martyrs school safety zone including consideration of a request to join the two 20mph Zones which are currently in place on Hamilton Drive. A speed limit review of Acomb Road in the vicinity of crossing points used to access Acomb Primary School and West Bank Park. A feasibility study of crossing improvements on Acomb Road. A review of road markings on West Bank as part of the 23/24 annual review of parking restrictions. Options
11. Three options were presented for consideration at consultation stage:
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
Follow Decision Session - Executive Member for Transport at York and we tell you when its next papers are published, before the meeting rather than after it.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.