TSAR Traffic Signal Refurbishment – Junction of Malton Road / New Lane
ApprovedExecutive10 papers
Decision Session - Executive Member for Transport - Expired approved this item on Tuesday 13 December 2022. Below is the council's own wording, with the papers it was decided on.
i. Approved progression of the scheme to detailed design and construction, based on Option C ‘Renewal of Traffic Signal Equipment with additional Toucan Crossing Introduction’. Reason: In order to progress the design and construction of the TSAR scheme at Malton Road / New Lane. i. Approved progression of the scheme to detailed design and construction, based on Option C ‘Renewal of Traffic Signal Equipment with additional Toucan Crossing Introduction’. Reason: In order to progress the design and construction of the TSAR scheme at Malton Road / New Lane.
Word for word from the decision York published for this meeting.Source: democracy.york.gov.uk
Report to Decision Session - Executive Member for Transport - Expired, 28 pages
Summary
1. The traffic signalling equipment at this site is life expired, has become difficult and costly to maintain and needs to be replaced.
2. The TSAR (Traffic Signal Asset Renewal) programme is the means by which life expired traffic signal assets across the city are refurbished.
3. Although the programme is primarily about asset renewal, there is scope to take advantage of ‘easy wins’ whilst refurbishing the equipment. To that end, design proposals aimed at improvements for pedestrians and cyclists moving through the junction and providing links to existing cycle infrastructure to the northwest of the junction in accordance with the Travel Hierarchy of Transport Users adopted by CYC as part of Local Transport Plan 3 are being put forward.
4. An initial proposed design which included the reallocation of carriageway space on New Lane to provide a mandatory northbound cycle lane to link with an existing on carriageway cycle lane as well as kerbline changes aimed at reducing cyclist/[pedestrian conflict in the North Western corner of the junction was developed and shared for consultation with local ward councillors and external stakeholders representing active travel mode users and equalities groups.
5. Ward councillors responded to indicate that the carriageway changes proposed in this initial design were a cause for concern and did not address local issues which are proposed to be more pressing at the junction. Safety issues for cyclists entering the carriageway of New Lane without traffic signal control whilst motor vehicle traffic also enters the road as part of the proposed layout changes was a key focus, alongside a desire for the introduction of a third signal controlled crossing at the junction providing a more direct route between the Southern foot/cycle way of Malton Road and New Lane.
6. Based on this response, a further three design proposals were compiled which reflected the suggestions proposed during consultation as well as informing slight revisions to the original design proposal to provide light segregation of the new northbound cycle lane and an increase in the size of the foot/cycle way areas around the proposed Toucan crossing waiting areas.
7. The Four Design Proposals include:
Design Proposal A – Renewal of Traffic Signal Equipment and minor civils works Design Proposal B – Renewal of Traffic Signal Equipment and reallocation of New Lane Carriageway space to Active Travel Modes Design Proposal C – Renewal of Traffic Signal Equipment with additional Toucan Crossing Introduction Design Proposal D – Renewal of Traffic Signal Equipment, Reallocation of New Lane Carriageway space to Active Travel Modes and additional Toucan Crossing Installation
8. A second round of consultation was undertaken on these four design proposals with responses indicating that ward councillors would favour the introduction of Design Proposal C whereas Stakeholders representing Active Travel users would prefer Design Proposal D.
9. A decision is required to approve which of the proposed schemes should be taken forward to detailed design and construction.
Recommendations
10. The Executive Member is asked to:
Approve progression of the scheme to detailed design and construction, based on one of the scheme proposals described within this report.
Reason:
In order to progress the design and construction of the TSAR scheme at Malton Road / New Lane. Background
11. The TSAR (Traffic Signal Asset Renewal) programme has been in place since 2015 and is responsible for the replacement of life expired traffic signal assets around York.
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
Follow Decision Session - Executive Member for Transport - Expired at York and we tell you when its next papers are published, before the meeting rather than after it.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.