That the application be approved, subject to the conditions as outlined above. Reason: It is considered the social, economic and environmental benefits arising from the provision of a modern, net zero carbon in operation and up to date school would outweigh the harm identified through the loss of the non-designated heritage asset. The principle of development is therefore considered acceptable. The proposal includes the provision of a playing field and improved outdoor spaces which is a significant ... view the full minutes text for item 22.
Word for word from the decision York published for this meeting.Source: democracy.york.gov.uk
Date: 26 September 2024 Ward: Heworth Team: East Area Parish: Heworth Planning Panel
Reference: 24/00857/FULM Application at: Tang Hall Cp School Sixth Avenue York YO31 0UT For: Demolition of existing school building. Retention of Childrens Centre. Erection of single storey school building (use class F1) with associated parking, access, play space, playing field and landscaping. By: ISG Construction Ltd, On Behalf Of Dept For Education Application Type: Major Full Application Target Date: 3 October 2024 Recommendation: Approve
1.0PROPOSAL
1.1Tang Hall Primary School is located on Sixth Avenue and occupies 1.16 hectares. The site currently hosts the Primary School, the Avenue Children’s Centre, a playground, a car park (approx. 38 spaces) and a multi-use games area (MUGA). There are currently no grassed areas or playing fields. The site occupies a rectangular plot with the buildings sited in the centre of the site, in a ‘H’ shape. Residential dwellings surround the site on all sides and allotments lie to the west. Pedestrians and vehicular access to the site is currently via Sixth Avenue or Fourth Avenue. The school was constructed in the 1920’s and the Childrens Centre was added in the 2000’s. The School is considered a non-designated heritage asset as listed within ‘Character Area 56: Tang Hall Estate’ character area statement. The site lies within Flood Zone 1.
1.2Planning permission is sought for the demolition of the existing school buildings which sits centrally within the site in a H plan footprint. The existing wings on the northern and southern boundary generally host classrooms with the school hall in the centre of the site, to the east of the Childrens Centre. The Children’s Centre located in the centre of the site would be retained. This is operated independently of the school.
1.3It is proposed to erect a new single storey school building in the North-West quadrant of the site. The new building will have an L-shaped footprint and will host classrooms, staff rooms, a nursery, library, offices, kitchen, hall, W.C facilities and store rooms. Although single storey, some elements will be 1.5 storey to allow an increased height for the hall, PE and dining. It is to be constructed in brick,
Application Reference Number: 24/00857/FULM Item No: 4c aluminium cladding with a bio-solar green roof. The school floorspace will be reduced from 3,749m2 to 1,378m2. The eastern half of the site will include new play space (hard and soft), a new playing field, as well as a pupil habitat area. The existing MUGA will be retained.
1.4Three areas around the site are proposed for cycle parking (which will host 40no. cycles and 30no. scooters). A new 41no. space car park is proposed in the south west quadrant of the site, alongside a new vehicular and pedestrian access from Sixth Avenue. 3no. (7.3%) active EV charging spaces are proposed. 11no. trees are required for removal as a result of the development and 7no. trees are to be removed due to their condition. The scheme involves a significant landscaping scheme (including grassed areas, tree planting and infilling of fencing). Biodiversity Net Gain of 10% is required and is achieved on site.
1.5The school has secured funding from the Department of Education for the upgrading of the existing school facilities as part of the School Rebuild Programme. The location of the new build will enable the construction to take place whilst ensuring the school is operational and as such would be a phased development. The school will be one form entry. Pupil capacity (210no. places) and staff numbers (22.5 FTE) are not altering as a result of this development. Nursery provision will remain (36no. places). The Applicant has carried out local community consultation and pre-application advice was sought.
1.6The following planning history is relevant:
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.