Resolved
Decision To note the contents of the report. (Ref: Report by Director of Transportation & Property Services dated 3 September 2002, submitted).
Strategic Policy Committee noted this item on Thursday 12 September 2002. Below is the council's own wording, with the papers it was decided on.
Resolved
Decision To note the contents of the report. (Ref: Report by Director of Transportation & Property Services dated 3 September 2002, submitted).
This report informs members of the additional costs relating to the recent work carried out to the bow ramp and an update on the operational restraints placed on the ferry.
Members are asked to note the contents of this report.
The initial estimates submitted for the substantial alterations to the bow ramp indicated a cost of £157,284 and the final submitted costs are £174,338.44. This represents an increase of £17,054.44.
The works were carried out during the annual re-fit between 16 March 2002 and 28 April 2002 and comprised the re-fit and the replacement of the forward ramp with an articulated ramp including fundamental alterations to the decking and hydraulics system and provision of additional buoyancy chambers.
Lloyds Register of Shipping approved the design and implementation of the works. When the initial estimate was prepared for this work the design and of course the work had not been approved therefore a flexible approach to the design and build was necessary. It is worth noting that although account was taken of previous designs and solutions to similar sized vessel the ramp type was a novel approach in this vessel. While some components were off the shelf the desire to improve the vessels carrying capacity while fitting a heavier ramp presented major challenges.
The main reasons for costs overrun were: -
1. Re-design of the clevis arms on the ramp; 2. Hydraulic systems, installation of an external hydraulic oil tank; 3. Change to electrically operated bow ramp; 4. Inclusion of a spare ram for the bow ramp; 5. Additional stool for the bow ramp.
F:\moderngov\data\published\Intranet\C00000188\M00000858\AI00005037\EileanDhiuraFerryBowRampAlterations0.doc 1 of 2 05 September 2002 As originally planned the vessel was re-measured using a reduced freeboard after a short trial period in service. The vessel now has a carrying capacity of 40 tonnes. Discussions are ongoing with the Maritime Coastguard Agency (MCA) regarding relaxation of the weather limitations placed on the vessel after the bow ramp failure of December 2000. Our arguments are helped by the trouble free introduction back into service after such a heavy modification. A formal request has been made to MCA that the following guidance is given to the Masters of the vessel:
1. With deck loads below 35 tonnes the vessel will be permitted to sail in “favourable” weather and sea conditions, subject to the 1.5M mean wave height restriction common to such vessels. The Master’s discretion will apply in such cases.
(The advice received from the ferry operators is that the new bow ramp provides a sufficiently increased margin of safety, which should result in fewer weather related cancellations in future).
2. The existing restrictions which are currently applied to all sailings will in future only apply to deck loads over 35 tonnes i.e. in addition to the criteria stipulated above the following would apply:-
• That in darkness with northerly winds or in darkness one hour before and one hour after the turn of the tide in winds from the south, the vessel should not sail;
The MCA have indicated that they are considering these proposals and will respond in due course.
4. IMPLICATIONS
4.1Policy – The improvements to the existing ferry service will ensure better access to and from Jura.
4.2Financial – Additional cost financed from slippage on the Port Askaig Project, within the Roads Capital Budget.
4.3Personnel – None.
4.4Equal Opportunities – None.
4.5Legal – None.
For further information, please contact D McLeod, Area Manager Mid Argyll, Kintyre and Islay (01546 604671)
Alistair Gow Director of Transportation & Property
3 September 2002
F:\moderngov\data\published\Intranet\C00000188\M00000858\AI00005037\EileanDhiuraFerryBowRampAlterations0.doc 2 of 2 05 September 2002
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
PDF |
EILEAN DHIURA FERRY: BOW RAMP ALTERATIONSReport | 63 KB | DownloadRead as text |
Follow Strategic Policy Committee at Argyll and Bute and we tell you when its next papers are published, before the meeting rather than after it.
| Meeting | Decision | Outcome | |
|---|---|---|---|
| 19 Apr 2007 | Leader's reportDecision To note the contents of the report for the period 14 March to 10 April 2007. (Reference: Report by Leader of... | Noted | Open |
| 19 Apr 2007 | North of scotland local authorities - revenues and benefits projectDecision Agreed that delegated authority be given to the Head of ICT and Financial Services to sign a Memorandum of U... | Agreed | Open |
| 19 Apr 2007 | Development and environment issuesDecision To note the contents of the report. (Reference: Report by Spokesperson for Development and Environment Issue... | Noted | Open |
| 19 Apr 2007 | Argyll and bute design awards scheme and sustainable design forumAgreed to have a single Council wide Planning Award Scheme to be administered centrally by the Design Forum and; 3. T... | Agreed | Open |
| 19 Apr 2007 | Refuse collections on private roadsDecision The Motion was carried by 5 votes to 3 and the Committee resolved accordingly. (Reference: Extract of Minute... | Decided | Open |
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Keeps you signed in and runs your free-paper allowance. Always on.
Counts visits and which pages are used. First-party only, no advertising, never shared.