Bute and Cowal Area Committee, Tuesday 5 April 2005 at 10.30am

Proposed Works Programmes 2005-06

Noted Committee 1 paper

Bute and Cowal Area Committee noted this item on Tuesday 5 April 2005. Below is the council's own wording, with the papers it was decided on.

Item6b

Resolved

Decision The Committee noted the contents of the report. (Reference; Report by Area Manager, Roads and Amenity Services – submitted)
Word for word from the decision Argyll and Bute published for this meeting. Source: www.argyll-bute.gov.uk

Follow this further

Built from Argyll and Bute's papers

What the report saysPro

Report to Bute and Cowal Area Committee

Background

3.1REVENUE WORKS PROGRAMME

3.1.1 The proposed works programme reflects the needs of the road network with the premise of maintaining the road network in a sustainable manner.

3.1.2 The works are funded from both the revenue and Capital works programmes It is anticipated that the revenue programme will increase by 3.9% and the anticipated Capital programme for Road Reconstruction is £1.931m Bute and Cowal share being £444,015 split into £294,515 for Reconstruction and £149,500 for resurfacing – mainly surface dressing

3.1.3 The surface dressing programme is detailed in Appendix A.

3.1.4 The reconstruction programme is detailed in Appendix B

F:\moderngov\data\published\Intranet\C00000242\M00002021\AI00021952\050405wksprog0.doc 1 of 4 29 March 2005 3.2 CAPITAL LIGHTING

Replacement of defective stock and cabling will continue. Several areas of 5th core cable are causing extensive faults in the supply to extensive areas in both Dunoon and Rothesay. Works in Caledonia Walk have already been accelerated due to cable deterioration requiring urgent action– value £30,000The anticipated lighting budget of £530,000 is allocated from the centre on a needs basis Projects for Bute and Cowal are A815 Shore Road Sandbank, [Ferry Rd – Fir Brae] £35,000 A815 Marine Parade [James St – Burgh bdy] £45,000

4. IMPLICATIONS

Policy None

Finance None

Personnel None

Legal None

Background papers

Appendix A Proposed Surface Dressing Programme 2004-2006 Appendix B Proposed Reconstruction Programme 2004-2006

For further information, please contact Alan Lothian Area Roads and Amenity Services Manager Tel 01369 708600

I:\word\88.03\2003new committee\13-5-03 Works programme 29 March 2005 Appendix A Surface Dressing programme

BUTE & COWAL - PROPOSED SURFACE DRESSING PROGRAMME 2005/6

Route Location Width Length Area s.m. COWAL

East Area A815 Pucks Glen to Uig Rd 6.7 1024 6860 A815 Stratheck Cottages to Inverchapel Lodge 6.5 918 5967 A815 jjct B836 to A880 6.8 1554 10567 A815 Wooden Houses to Island Farm 6.7 2176 14580 B839 Hells Glen various 4 1200 4800 C6 Carrick Cstle Rd Chalet Frontage 3.2 900 2880 C57 Glenbranter Village Middle Road 2.9 80 240 UC18 Cromwell St; John - Mary Streets 5.9 293 1730 UC3 Alexander Street 5.4 524 2830 UC55 Mary St; Victoria Rd -Alexander St 6 375 2250 UC7 Auchamore Rd: Wellington - Alexander St 4.6 380 1748 C9 Ardentinny Village to Deer Farm 4.4 2336 10280 Area Total 64732

West Area B8000 Police Station to Millhouse 5.3 1320 7040 UC22 West Glendaruel - from 2004 to Farm 3.2 2800 8964 UC 19 Couston Road 3.2 3343 10700

Area Total 26704

BUTE #REF! A844 Mount Stuart Glenburn - Leopold Rd 8.7 655 5707 UC24 Crighton Rd Fauldtrees - Albany Road 7.5 934 7005 UC83 Barone Road Meadows 5.8 1010 5915 Area Total 18627

Total area of Surface Dressing 110,063

I:\word\88.03\2003new committee\13-5-03 Works programme 29 March 2005 Appendix B Reconstruction Programme

BUTE & COWAL RECONSTRUCTION WORKS. PROGRAMME 2005-06.

Route Description Estimate

COWAL A885 Argyll St; John St-Hamilton St £45,000 UC16 Lazerretto Ferry Lane £10,000 A815 Creggans - Ardchyline £80,000 A886 Garvie Bridge £15,000 A8003 Tighnabruaich Road viewpoint £40,000 B839 Pole Farm £39,515 £229,515

BUTE UC70 West Princess Street Rothesay £32,000 UC6 Argyle Terrace Rothesay £18,000 UC13 Bridge Street Rothesay £15,000 £65,000

Total Capital Reconstruction £294,515

I:\word\88.03\2003new committee\13-5-03 Works programme 29 March 2005

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
Proposed Works Programmes 2005-06Report 89 KB DownloadRead as text

At this meeting

Whole meeting
3aMinute of Area Committee of 1st March 2005On the agenda 3bMinute of Formal Site Inspection held on 1st march 2005On the agenda 4aArea Strategy submit for formal endorsement of Area CommitteeAgreed 5aEducation and Leisure Development Grant SchemeOn the agenda 6aBute Agricultural Society - Playing FieldAgreed
6bProposed Works Programmes 2005-06This decision
6cProposed Projects for the Strategic Timber Transport Fund for 2005-06Noted 7aPlanning Application Reference No: 04/02089/DET, Mr S Shaw, Erection of 3 dwellinghouses with attached garages and formation of new vehicular access, Lover's Lane, ArdnadamApproved 7bPlanning Application Reference No:04/02455/DET, Alison J McMahon, Erection of timber shed in rear garden for use as a dog grooming salon, Glenfyne Cottage, 66 Queen Street, DunoonApproved 7cPlanning Application Reference No: 05/00295/DET, Scottish Water Solutions, Formation of rock armour sea wall, re-profiling of land to accommodate buried septic tank, chambers and pumping atations, formation of access and ancillary developmeAgreed 7dPlanning Application Reference No:05/00031/VARCON, Carry Farm Ltd, Variation of Condition 1 of Planning Permission 01/01758/DET to Allow the Permanent Residential Occupation of One Lodge (Unit 4), Land South of Carry Farm, Ardlamont by KamesDecided 7ePlanning Application Reference No: 04/02398/DET, I W Joinery and Construction, Demolition of Outbuildings and Erection of Six Dwellings and Formation of Vehicular Access, Land and Former Steading, West of Knockanreoch, Westlands Road, RothesayApproved 7fDelegated DecisionsOn the agenda 7gShort-listing for Bute and Cowal Area Planning Design Award 2004On the agenda 7hPlanning Appeal by Mr W Brown: Bullwood Road, DunoonOn the agenda 9aApplication for Taxi Drivers Licence - Mark Andrew Ellis, 2 Shuna Gardens, KirnDecided 9bApplication for Taxi Drivers Licence - John MacIntyre, 64 Dixon Avenue, DunoonDecided

Who was there

13 of 14 attended
BC
Councillor Brian ChennellChair, present
DC
Councillor Douglas CurrieMember, apologies
GM
Councillor Gordon McKinvenMember, present
PO
Philip O'SullivanOfficer, present
HB
Hugh BlakeOfficer, present
AL
Alan LothianOfficer, present
RM
Councillor Robert MacintyreMember, present
BM
Councillor Bruce MarshallMember, present
JM
Councillor James McQueenMember, present
JR
Jo RainsOfficer, present
LS
Councillor Len ScoullarMember, present
IS
Councillor Isobel StrongMember, present

All 14 on the meeting page

On this subject at Argyll and Bute

Search all
  1. Proposed Works Programmes 2005-06This decision
  2. Chivas brothers ltd: proposal of application notice for proposed whisky distillery together with visitor facilities, water abstraction, long sea outfall, road improvement works and all associated infrastructure: land at gartbreck farm, moss road, bowmore, isle of islay (ref: 24/00796/pan)Noted
  3. Scottish hydro electric transmission plc: construction of approximately 13.3 km of 275kv over head line (ohl) from between a proposed substation at creag dhubh to the existing scottish power energy networks (spen) 275 kv ohl that runs fromAgreed
  4. Scottish water: proposed new wastewater treatment works including vehicular access to site: land west of sewage works, clachan seil, isle of seil (ref: 18/02640/pan)Agreed
  5. Proposed Carriageway Reconstruction Works 2012-13Agreed
  6. Proposed Roads Capital Works ProgrammeApproved

More from Argyll and Bute Bute and Cowal Area Committee

All decisions
MeetingDecisionOutcome
1 Sep 2026 Charts (argyll and the isles)Decision The Bute and Cowal Area Committee considered and noted the information provided in the presentation. (Refere... Noted Open
1 Sep 2026 Area committee quarterly performance reports fq1 2026/27Decision The Bute and Cowal Area Committee noted the performance and supporting commentary as presented. (Reference: ... Noted Open
1 Sep 2026 Supporting Communities Fund 2026/27Decision The Bute and Cowal Area Committee agreed that the 20 applications, marked as ‘Award’ or ‘Partial Award’ with... Agreed Open
1 Sep 2026 Roads and infrastructure services updateDecision The Bute and Cowal Area Committee noted the contents of the report. (Reference: Report by Executive Director... Noted Open
1 Sep 2026 Cruach mhor and clachan flats windfarm trustsDecision The Bute and Cowal Area Committee noted these updates, which are the most recent of the annual updates requi... Noted Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies