Resolved
Decision Agreed to approve the application subject to the following conditions and reasons:- 1. That the permission is granted in terms of Section 59 of the undernoted Act and Regulation 10 of the Town and Country Planning (Development Management Procedure) (Scotland) Regulations 2008 on the basis of an application (or applications) for planning permission in principle that further approval of Argyll and Bute Council or of Scottish Minister on appeal shall be required, such application must be made before whichever is the later of the following:- a) the expiration of a period of 3 years from the date of this permission. b) the expiration of a period of 6 months from the date on which an earlier application for the requisite approval was refused. c) the expiration of a period of 6 months from the date on which an appeal against such refusal is dismissed. And in the case of b and c above only one such application can be made after the expiration of the period of 3 years from the original planning permission in principle. Reason: In accordance with Section 59 (1) of the Town and Country Planning (Scotland) Act 1997 2. The development shall be implemented in accordance with the details specified on the application form dated 21 st May 2010 and the approved drawing reference numbers 1/3 to 3/3. Reason: For the purpose of clarity, to ensure that the development is implemented in accordance with the approved details. 3. No development shall commence until details of the siting, design and finishes of the dwellinghouse hereby approved have been submitted to and approved by the Planning Authority. Thereafter the development shall be implemented in accordance with the duly approved details. Such details shall show a dwellinghouse which incorporates the following elements: i) The dwelling shall be single storey in height; ii) The dwelling shall be sited within the south western corner of the application site and shall have a maximum external footprint of 120sqm; iii) The window openings shall have a strong vertical emphasis. iv) The walls shall be finished in a recessive wet dash render / smooth coursed cement render / natural stone / timber cladding. v) The roof shall be symmetrically pitched to at least 37 degrees and be finished in natural slate or a good quality substitute slate. vi) The building shall be of a general rectangular shape and gable ended; vii) Any porches (which are encouraged in the design) shall have traditional "peaked" roofs. viii) Details of the proposed finished floor level of the dwelling relative to an identifiable fixed datum located outwith the application site. Reason: In the interest of visual amenity, in order to integrate the proposed dwellinghouse with its surrounds and, no such details having been submitted. 4. No development shall commence until details of the proposed boundary treatment, including details of location, height and materials of any walls/fences/gates, have been submitted to and approved by the Planning Authority. Thereafter the development shall be implemented in accordance with the duly approved details prior to the first occupation of the dwellinghouse hereby approved in principle. Reason: In the interest of visual amenity, in order to integrate the proposed dwellinghouse with its surrounds and, no such details having been submitted. 5. No development shall commence until details of the proposed access arrangements from the public highway and onsite parking turning provision have been submitted to and approved by the Planning Authority. Such details shall show: i) Connection to the public road as per drawing SD 08/004 Rev. A, access width to be a minimum of 5.5m; ii) Visibility splays of 53.0m x 2.4m in both directions from the centreline of the proposed access within which there will be no obstruction of 1.05m in height above the level of the adjoining carriageway; iii) Details showing the means of permanently closing the existing access to Ugadale Cottage, this should include for the soiling and seeding of the first 5.0m from the edge of the public highway; iv) Provision of onsite parking and turning to comply with the requirements of LP TRAN 6 and Appendix C of the Argyll and Bute Local Plan 2009; v) Provision of a refuse collection point adjacent to the public highway. The duly approved details in respect of i) and ii) above shall be implemented prior to any work commencing on site; the provisions of iii), iv) and v) shall be fully implemented prior to the first occupation of the dwellinghouse hereby approved in principle. Reason: In the interest of road safety and, no such details having been submitted. 6. No development shall commence until details of the proposed foul drainage arrangements to serve the development have been submitted to and approved by the Planning Authority. Thereafter the duly approved details shall be implemented prior to the first occupation of the dwellinghouse hereby approved in principle. Reason: In the interest of public health, to ensure that the development is served by an appropriate means of foul drainage commensurate to the scale of the development and, no such details having been submitted. 7. Prior to the development commencing a full appraisal to demonstrate the wholesomeness and sufficiency of the private water supply to serve the ... view the full minutes text for item 6.