Resolved
Decision Agreed to grant Planning Permission subject to the following conditions and reasons:- 1. That the development to which this permission relates must be begun within three years from the date of this permission. Reason: In accordance with Section 58 of the Town and Country Planning (Scotland) Act 1997. 2. The development shall be implemented in accordance with the details specified on the application form and the approved drawing reference numbers: Drawing No. 400114-0000-20-DRG-9940; Drawing No. 400114-0000-20-DRG-9941; and Drawing No. 400114-0000-20-DRG-9942 unless the prior written approval of the planning authority is obtained for other materials/finishes/for an amendment to the approved details under Section 64 of the Town and Country Planning (Scotland) Act 1997. Reason: For the purpose of clarity, to ensure that the development is implemented in accordance with the approved details. 3. Notwithstanding the provisions of Article 3 and Class 43A of the Town and Country Planning (General Permitted Development) (Scotland) Order 1992, no works shall be carried out within the development site in respect of the erection of the control kiosk until its details have been submitted to and approved in writing by the Planning Authority. Such details shall show the erection of a kiosk that shall be clad in stone and be no higher than 2.0 metres above the level of the carriageway as it adjoins the frontage of the site. The kiosk shall be erected in accordance with such details as may be approved, unless the prior written consent of the Planning Authority is obtained for variation. Reason: In order to safeguard the visual amenity of the Rothesay Conservation Area from the unsympathetic siting and design of sewerage infrastructure normally carried out without Planning Permission under Article 3 of the Town and Country Planning (General Permitted Development) (Scotland) Order 1992. 4. The lay-by shall be formed with visibility splays of 42 metres in both directions measured from a distance of 2.4 metres back from the edge of the carriageway at the centre point of the access. Thereafter, no obstructions to visibility above a height of 1 metre from the level of the carriageway shall be permitted within the requisite splays unless the prior written consent of the Planning Authority is obtained for variation. Reason: In the interests of road safety. 5. Prior to the first use of the lay-by hereby approved, it shall have a 10 mm upstand at the existing channel and 100 mm kerb face at the rear of the bay. Reason: In the interests of road safety. (Ref: Report by Head of Planning and Regulatory Services dated 30 December 2010, submitted and Report by Head of Planning and Regulatory Services dated 18 January 2011, tabled)