CouncilMonitor
194 principal councils 228,996 meetings since 2000 2.8 million official papers archived Straight from each council's own publication system
Argyll and Bute Council
Planning, Protective Services and Licensing Committee, Wednesday 19 January 2011 at 10.30am

SCOTTISH WATER: APPLICATION FOR FORMATION OF LAYBY: ARDBEG ROAD, ARDBEG, BUTE (REF: 10/01777/PP)

Agreed Planning 3 papers

Planning, Protective Services and Licensing Committee agreed this item on Wednesday 19 January 2011. Below is the council's own wording, with the papers it was decided on.

Item8

Resolved

Decision Agreed to grant Planning Permission subject to the following conditions and reasons:- 1. That the development to which this permission relates must be begun within three years from the date of this permission. Reason: In accordance with Section 58 of the Town and Country Planning (Scotland) Act 1997. 2. The development shall be implemented in accordance with the details specified on the application form and the approved drawing reference numbers: Drawing No. 400114-0000-20-DRG-9940; Drawing No. 400114-0000-20-DRG-9941; and Drawing No. 400114-0000-20-DRG-9942 unless the prior written approval of the planning authority is obtained for other materials/finishes/for an amendment to the approved details under Section 64 of the Town and Country Planning (Scotland) Act 1997. Reason: For the purpose of clarity, to ensure that the development is implemented in accordance with the approved details. 3. Notwithstanding the provisions of Article 3 and Class 43A of the Town and Country Planning (General Permitted Development) (Scotland) Order 1992, no works shall be carried out within the development site in respect of the erection of the control kiosk until its details have been submitted to and approved in writing by the Planning Authority. Such details shall show the erection of a kiosk that shall be clad in stone and be no higher than 2.0 metres above the level of the carriageway as it adjoins the frontage of the site. The kiosk shall be erected in accordance with such details as may be approved, unless the prior written consent of the Planning Authority is obtained for variation. Reason: In order to safeguard the visual amenity of the Rothesay Conservation Area from the unsympathetic siting and design of sewerage infrastructure normally carried out without Planning Permission under Article 3 of the Town and Country Planning (General Permitted Development) (Scotland) Order 1992. 4. The lay-by shall be formed with visibility splays of 42 metres in both directions measured from a distance of 2.4 metres back from the edge of the carriageway at the centre point of the access. Thereafter, no obstructions to visibility above a height of 1 metre from the level of the carriageway shall be permitted within the requisite splays unless the prior written consent of the Planning Authority is obtained for variation. Reason: In the interests of road safety. 5. Prior to the first use of the lay-by hereby approved, it shall have a 10 mm upstand at the existing channel and 100 mm kerb face at the rear of the bay. Reason: In the interests of road safety. (Ref: Report by Head of Planning and Regulatory Services dated 30 December 2010, submitted and Report by Head of Planning and Regulatory Services dated 18 January 2011, tabled)
Word for word from the decision Argyll and Bute published for this meeting. Source: www.argyll-bute.gov.uk

Follow this further

Built from Argyll and Bute's papers

What the report saysPro

Report to Planning, Protective Services and Licensing Committee

Shingle 22

18a

19 18

G O

D R T 1a

A Th

A

O N e Ardbe g

R S Terr Roseba nk

M R 2

A O a Pavi li on Cot tag e

2 H A ce 10 ovely L

D D

N Qua r y Co t tage

WY 8 1

4 20 (di sused ) 95

2 14 1

a 5

o

12 t 91

1 4

6 3 7.3m

10 9

8 to

2 1 2

5 85 1

4 1 a 85 PO

3 83

3 1 a 83 1

1a

1 a to 8 76

1 .5 Out f al l

Roc TCB 9

urn to

0 1 1

k WA 6

1 LB T

B 81 S Issu es 17

4 O t N o

ENS 79 74 P 2 a 4

nd L A 25 2 1 C

MA ou RD E to

se 3

aygr 2

R IN GA

u Gl enfi el d

Pl

9 39.3 m

t ho

E RE Cot tag e El S ub St a

PLA in

74 CL A

Po

CE UNT

1 n

74 Wa ter f al l

a

a Dr ai

to 75 MO

f

0 7 a 73

d 73

72 5

0 7 68 c 73 Roc k

3 7

6 8

9 6 1 Roc k

62 1 3 1

60 A Rull e che ddan

60 B 5 1

5 58 A Shel t er

58 B 5 6 22.3 m

N e v is Gl e n Co t t

18 20

3 6 7 6 2 e

17a g C o t ta The Kna pdal e

8 5 9 5 Char eni sta E

4 2 A BR Ardmory Hous e LE

1 TT NE

56 Hotel 7.6m ra Roc k 51.2 m Gl eno

7 5 26

7 1 1

2 UR T 3.7m h 3 CO

5 N Pat M PL E

19.2m CA

Gl en

4 5 1 Mar ee

8 2

AD

2 b

2 a Thom so n

5 2 5

3 5 RO Foun ta in

0 3

2 3

RY Shel t er

Ardbeg

MO ARD

9 4 0 5 1 5

8 4 6 4

er Spr i ngs in gs g le 7 a

7 4 4

er S pr h in D

S OA

s & The Cot tag e

Mea n Low Wat Hi gh Wat r R 5 4 4

l de BEG

Bo u ARD 2 4

Mea n 17b

3 4 Ro thesay Bay

8 5 0 6 Rull e c he ddan Holdings

e i n gl 2 6

Sh urn

s & B

4 6

l d er 7 3 5 6 u se

B ou n t ho Drai n Out f al l

Po i

5 3 71.9 m

4 Sand & Ar dbeg Far m Shi ngl e Hu n t e r s V ie w Cot tag e

Ar dlu i 1

Ardbe g 2

4 3 1

LB

2 3

3 Rosem oun t

1 3

R oc k 8 2 9 2 Sl ipw ay

73.5m

Spr ing bank Cot t age 4.6m

3 2 GRE ENH IL LB RAE Inver beg C ott age El S ub

Shi ngl e St a

0 2

1 2 2

8 a 1

8 1 9 1 7 a 1 7 b 1 Tigh na

7 1 Dr ai n Tigh na Mar a Cot ta ge

4 1 Roc k

3 a

3 1 1 Mara Cottage

n g le Palm yr a

Shi Roc k

4 Shel t er

4 A8 0 a 1 Gl enr osa

0 a Roc k

1 Cot t

0 1 Tr ack

a 8 9 s a r o

e a 6

Gl e n

P la c

a 6

8 a 6 7

MS Bou ld er s

a 6 6 and Shi ngl e

4 5

D OA R LB

BEG

SM ARD 3

Roc k Roc k 2 1 FB

Roc k

Mea n Hi gh 5.8m

Wat er S pr m) h (u

in gs Pat 14 Issu es Roc k

Pat h (u m ) m)

Bou ld er s Pat h (u Roc k

Pat h Pat h (u m )

(u m ) Skeo ch Woo d Bat hi ng Pl ace Ro thesay Bay

Bou ld er s and Shi ngl e Cl ub Sk e oc h Wood

ARG YLE PL ACE Roc k

Roc k Issu es

Jet ty

8 2 5 to 7 Rock Roc k

1 to 4 West w ood

6 2

Mea n Low Wat Roc k Haw tho rn Par k

er Spr i ngs Application Site

3 2 3 4

1 2 Sur ge ry TCB

9 1 El S ub St a N L AN E HAW TH OR

8 a 1

7 1 8 1 6 1 Roc k

7 3 7 3

ARG

3 1 1 4 3 a 1 YLE TE RRA

2 1 2 .5 1 Issu es

1:24,000

2 a CE

1 1 a 1 3

0 1 9 17.1 m 6 E RA SB B'

8 A CN

7 2

9 2 MA

5 2

7 Bou ld er s and

3 2

6 . 5 5 Shi ngl e

Pat h

5 (u m )

7 1

Sand . 5 4

4 3 3 1 9 1 13a 13

e l Shing

Palmyra

Rock 11

4 A 84

Shelter 10a

Glenrosa 10a

Cott Rock 10 8a 9 Tra

a Glenros 6a ck

Place

6a 8 6a 7

MS

Boulders 6a 6

and Shingle 4 5

D G R OA

LB ARDBE

SM 3

Reproduced from the Ordnance Survey map with the permission of the Controller of Her Majesty's Stationery Office (C) Crown Copyright 2009. Unauthorised reproduction infringes Crown Copyright and Ro c k

may lead to prosecution or Civil Proceedings. OS License No.100023368, 2009.

° Location Plan relative to Application Ref: 10/01777/PP Date: 19.01.2011 Scale: 1:1,250

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
01777_Supplementary Report of Handling Layby Land Opp 11 and 12 Ardbeg RdSupplementary 87 KB Download
PDF
1001777PPReport 334 KB DownloadRead as text
PDF
SCOTTISH WATER: APPLICATION FOR FORMATION OF LAYBY: ARDBEG ROAD, ARDBEG, BUTE (REF: 10/01777/PP)Report 114 KB Download

At this meeting

Whole meeting
2MINUTESOn the agenda 3CIVIC GOVERNMENT (SCOTLAND) ACT 1982: TAXI FARE SCALE REVIEWAgreed 4MR D CLARK: FORMATION OF VEHICULAR ACCESS AND ERECTION OF GATES (RETROSPECTIVE): ARDOCH COACH HOUSE, ARDOCH (REF: 09/00574/DET)Agreed 5MR D CLARK: FORMATION OF VEHICULAR ACCESS AND ERECTION OF GATES (RETROSPECTIVE): ARDOCH COACH HOUSE, ARDOCH (REF: 09/00575/LIB)Agreed 6MR JONATHON HOOPER: SITE FOR ERECTION OF A DWELLINGHOUSE: LOW UGADALE COTTAGE, PENINVER, CAMPBELTOWN (REF: 10/01169/PPP)Agreed 7MR AND MRS P CAIRNS: ERECTION OF DWELLINGHOUSES AND ASSOCIATED WORKS: GROUND TO THE NORTH OF DEAN HOUSE, EAST ABERCROMBY STREET, HELENSBURGH (REF: 10/01302/PP)Agreed
8SCOTTISH WATER: APPLICATION FOR FORMATION OF LAYBY: ARDBEG ROAD, ARDBEG, BUTE (REF: 10/01777/PP)This decision
9SCOTTISH WATER: RE-PROFILING OF GROUND AND RE-ALIGNMENT OF HANDRAIL TO ACCOMMODATE BURIED PUMPING STATION CHAMBERS, FORMATION OF LAY-BY AND INSTALLATION OF ROCK ARMOURING AND RETAINING WALL: LAND OPPOSITE 8 MARINE PLACE, ARDBEG, ROTHESAY, ISLE OF BUTE (REF: 10/01977/PP)Agreed 10SCOTTISH WATER: ERECTION OF ACCESS GATES, WIDENING OF EXISTING ACCESS, FORMATION OF ACCESS TRACK AND HARDSTANDING AREA: LAND WEST OF PUBLIC CONVENIENCE, MARINE ROAD, PORT BANNATYNE, ISLE OF BUTE (REF: 10/01806/PP)Agreed 11MACAULAY CAMANACHD ASSOCIATION: TEMPORARY SITING OF PORTACABIN AND STORAGE UNIT FOR 3 YEARS: MOSSFIELD PARK, GLENCRUITTEN, OBAN (REF: 10/01969/PP)Agreed 12MULL AND IONA COMMUNITY TRUST: ADDITIONAL PLANT ROOM, AMENDING SITING, AMENDED FENESTRATION ON THE SOUTH EAST AND SOUTH WEST ELEVATIONS, UPGRADING OF ROOF COVERING TO NATURAL SLATE, ADDITION OF 7 SUNPIPES, DELETION OF SOLAR PANELS AND INSTAAgreed 15The Committee resolved inOn the agenda 13ENFORCEMENT REPORT - 09/00102/ENFLBPrivate

Who was there

13 of 14 attended
RC
Councillor Rory ColvilleMember, present
RC
Councillor Robin CurrieMember, present
VD
Councillor Vivien DanceMember, present
MD
Councillor Mary-Jean DevonMember, present
DK
Councillor Daniel KellyMember, present
DK
Councillor David KinniburghMember, present
NM
Councillor Neil MackayMember, present
DM
Councillor Donald MacMillan BEMMember, present
BM
Councillor Bruce MarshallMember, present
AM
Councillor Alister McAlisterMember, present
RM
Councillor Roderick McCuishMember, present
AM
Councillor Alex McNaughtonMember, present

All 14 on the meeting page

On this subject at Argyll and Bute

Search all
  1. SCOTTISH WATER: APPLICATION FOR FORMATION OF LAYBY: ARDBEG ROAD, ARDBEG, BUTE (REF: 10/01777/PP)This decision
  2. Scottish water updateNoted
  3. Scottish water updateNoted
  4. Scottish water - annual updateNoted
  5. Scottish water annual updateAgreed
  6. Scottish Water Annual UpdateNoted

More from Argyll and Bute Planning, Protective Services and Licensing Committee

All decisions
MeetingDecisionOutcome
15 Sep 2026 Beaufort wind limited: erection of 7 turbines (up to 149.9m to tip) and ancillary development and decommissioning of existing beinn ghlas wind farm: existing beinn ghlas wind farm, taynuilt (ref: 25/01240/pp)Decision The Committee agreed to grant planning permission subject to the following conditions and reasons: 1. PP - A... Agreed Open
15 Sep 2026 Mr tony coogan: alterations to guesthouse to facilitate lawful use of existing roof space as ancillary guest house owner's accommodation: greencourt, benvoullin road, oban (26/00434/pp)Decision The Committee agreed to grant planning permission subject to the following conditions and reasons: Standard ... Agreed Open
15 Sep 2026 Mrs faulkes: proposed alterations and erection of extension: 30 the green, craobh haven (ref: 26/01009/pp)Decision The Committee agreed to grant planning permission subject to the following conditions and reasons: Standard ... Agreed Open
15 Sep 2026 Scottish power renewables/machair wind limited: scottish government's marine directorate section 36 consultation on proposed machair offshore wind farm: site 15 km north west of isle of islay and 12.4 km west of isle of colonsay (ref: 26/01100/s36)Decision The Committee agreed that the Scottish Government’s Marine Directorate should be notified that Argyll and Bu... Agreed Open
15 Sep 2026 Development management performance update - fq1 2026/27Decision The Committee reviewed and agreed the content of the report. (Reference: Report by Executive Director with r... Agreed Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies