Resolved
Decision The Committee agreed to grant planning permission subject to the following conditions and reasons:- Standard Condition 1. The development shall be implemented in accordance with the details specified on the application form dated 27 th November 2019 and the approved drawing reference numbers: Plan Title. Plan Ref. No. Version Date Received Location Plan – Figure 1 1 of 9 - 17/12/19 Location Plan – Figure 2 2 of 9 - 17/12/19 Net Plan – Title: 120m x 10m + 1.3m DEEP 24 VERTICALS, 12 SEGMENT BASE 2.1 mm SSP MBX NETTING 3 of 9 - 17/12/19 Cage Layout & Waterline Plan Title: Ardyne T4502D120/48 c/w Bird Net Poles 4 of9 - 17/12/19 Cage Ring Elevation/Bird Net Poles Title: T450 2 Ring 120m Pen 48 U/R cw 5m Bird Net Poles 5 of 9 - 17/12/19 Mooring Plan Title: 14 x 120m cages, in 16 pen 2 x 8 pen 75m x 75m grid’ 6 of 9 - 17/12/19 Net Plan Title: 120m TOP NET UTILISING RABBEN KONSULT 6m POLE SYSTEM 7 of 9 - 17/12/19 Admiralty Chart Extract Proposed – Figure 3 8 of 9 - 17/12/19 Site Plan/Grid Co-ordinates Title: Site Plan Proposed, Figure 4 9 of 9 - 17/12/19 unless the prior written approval of the planning authority is obtained for other materials/finishes/for an amendment to the approved details under Section 64 of the Town and Country Planning (Scotland) Act 1997. Reason: For the purpose of clarity, to ensure that the development is implemented in accordance with the approved details. Removal of Redundant Equipment 2. In the event that the development or any associated equipment approved by this permission ceases to be in operational use for a period exceeding three years, the equipment shall be wholly removed from the site thereafter, unless otherwise agreed in writing by the Planning Authority. Reason: In the interest of visual amenity and to ensure that redundant development does not sterilise capacity for future development within the same water body. Redundant Equipment/Equipment Failure 3. In the event of equipment falling into disrepair or becoming damaged, adrift, stranded, abandoned or sunk in such a manner as to cause an obstruction or danger to navigation, the developer shall carry out or make suitable arrangements for the carrying out of all measures necessary for lighting, buoying, raising, repairing, moving or destroying, as appropriate, the whole or any part of the equipment. Reason: In the interest of visual amenity. Lighting 4. All lighting above the water surface and not required for safe navigation purposes should be directed downwards by shielding and be extinguished when not required for the purpose for which it is installed on the site. Reason: In the interest of visual amenity. Equipment Colour 5. The finished surfaces of all equipment above the water surface including surface floats and buoys associated with the development hereby permitted (excluding those required to comply with navigational requirements) shall be non-reflective and finished in a dark muted colour unless otherwise agreed in advance with the Planning Authority. Reason: In the interest of visual amenity. Environmental Management Plan 6. All prescriptions, as detailed within The Scottish Salmon Company’s amended Environmental Management Plan, dated December 2020 must be implemented by the Applicant in the manner and timings specified and any subsequent approved variation thereof. The EMP should be reviewed and updated if required following the adoption by Scottish Government of any new policy framework relevant to wild salmonid interactions. Any proposed amendments to the EMP shall be submitted to and approved in writing by the planning authority prior to the changes being implemented. Reason: In the interests of nature conservation. Drift nets, vertical static nets or gill nets 7. There shall be no use of drift nets, vertical static nets or gill nets to recapture escaped fish. Reason: In order to avoid putting marine birds, including guillemots, shags, divers and others at risk. Nuisance during Construction 8. Identification and assessment of all potential sources of nuisance, including noise vibration, dust, and any temporary lighting provided, which may cause disturbance to nearby residents during the construction should be undertaken by the applicant. This should include consideration of intended hours of operation, movement of vehicles, use of plant and storage of equipment and materials on site. For all potential sources of nuisance, the applicant will be required to provide a management plan with details of suitable control measures to be put in place so as to ensure that construction does not cause loss of amenity to local residents and/or statutory nuisance. Reason: In order to avoid sources of nuisance in the interest of amenity. Operating Hours during Construction ... view the full minutes text for item 5.