Resolved
Decision The Committee agreed to grant planning permission subject to the following conditions and reasons: 1. The development shall be implemented in accordance with the details specified on the application form dated 14.12.22; the Environmental Appraisal (December 2022), supporting information and, the approved drawings listed in the table below unless the prior written approval of the planning authority is obtained for an amendment to the approved details under Section 64 of the Town and Country Planning (Scotland) Act 1997. Plan Title. Plan Ref. No. Version Date Received Site Location Plan 1:75000 A01 A01 19.12.22 Site Location Plan 1:25000 A01 A01 19.12.22 Site Layout Plan 4534b-DR-P-0017 Rev.7 26.05.23 Substation Compound Layout and Electrical Section Locations 4534b-DR-P-0004 Rev.3 16.01.23 Proposed Site Access Profiles 4534b-DR-P-0021 - 19.12.22 Proposed Site Profiles 4534b-DR-P-0018 Rev.2 19.12.22 Site Access Details 4534b-DR-P-0008 Rev.1 19.12.22 Typical Access Track Sections – Sheet 1 4534b-DR-P-0007 Rev.2 19.12.22 Typical Access Track Sections – Sheet 2 4534b-DR-P-0012 Rev.2 19.12.22 2.5m High Security Palisade Fencing Details CE/34/2015 Rev. E 19.12.22 Electrical Layout Elevations 01 4534b-DR-P-0011 Rev.1 19.12.22 Electrical layout Elevations 02 4534b-DR-P-0014 Rev.2 19.12.22 Electrical Layout Elevations 03 4534b-DR-P-0015 Rev.1 19.12.22 Generator Building Elevations 4534b-DR-P-0009 Rev.2 19.12.22 Substation Building Elevations 4534b-DR-P-0006 Rev.2 19.12.22 Substation Building Layout 4534b-DR-P-0005 Rev.1 19.12.22 Transformer Building Elevations 4534b-DR-P-0019 - 19.12.22 Transformer Building Layout 4534b-DR-P-0020 - 19.12.22 Switch Room Elevations 4534b-DR-P-0013 19.12.22 Switch Room Floor Plans 4534b-DR-P-0010 Rev.1 19.12.22 Septic Tank and Private Water Supply Location (15.12.22) A01 A01 08.02.23 Reason: For the purpose of clarity, to ensure that the development is implemented in accordance with the approved details. 2. No construction works shall be commenced until a Finalised Construction Environmental Management Plan [CEMP] has been submitted to and approved in writing by the Planning Authority, in consultation with SEPA and other consultees, as appropriate. The development shall then proceed in accordance with the approved CEMP unless otherwise agreed in writing by the Planning Authority. The CEMP shall include: a) An updated Schedule of Mitigation (SM) highlighting mitigation set out within each chapter of the Environmental Appraisal (EA), and the conditions of this consent; b) Processes to control/ action changes from the agreed SM; c) Construction Environmental Management Plans (CEMPs) for the construction phase covering: i) Habitat and species protection, including ECoW Details, surveys and species protection plans; ii) Landscape and Mitigation Restoration Plan including compensatory planting (refer to Condition 9); iii) Pollution prevention and control; iv) Dust management, including construction activity and vehicle movements; v) Construction noise and vibration vi) Temporary site lighting; vii) Watercourse crossings; viii) Site waste management ix) Surface and ground water management, including: drainage and sediment management measures from all construction areas including access tracks, mechanisms to ensure that construction will not take place during periods of high flow or high rainfall; and a programme of water quality monitoring; x) Mapping of borrow pits and associated habitats identified for restoration; xi) Invasive Non-Native Species Management Plan xii) Emergency Response Plans; xiii) Timetable for post construction restoration/ reinstatement of the temporary working areas and construction compound; and xiv) Other relevant environmental management as may be relevant to the development d) A statement of responsibility to ‘stop the job/ activity’ if a breach or potential breach of mitigation or legislation occurs; and e) Methods of monitoring, auditing, reporting and the communication of environmental management on site and with client, Planning Authority, and other relevant parties. Reason: To ensure protection of surrounding environmental interests and general amenity. 3. No development shall commence until a Construction Traffic Management Plan (CTMP) and Phased Delivery Plan have been prepared and approved in writing by the Planning Authority and Transport Scotland as the trunk roads Authority. The Plan shall include details of: a) Approved access routes, b) Agreed operational practises (including avoidance of convoy movements, specifying conduct in use of passing places, identification of turning areas, information of wheel cleansing facilities, signage to be installed on the A83 warning of construction traffic, signage or temporary traffic control measures to include for larger or abnormal loads, reporting of verge damage); c) The provision of an appropriate Code of Practice to drivers of construction and delivery vehicles. d) Abnormal load route surveys and finalised plan (including any accommodation measures required including the removal of street furniture, junction widening, traffic management). The development shall be implemented in accordance with the duly approved Traffic Management Plan Reason: To minimise the interference with the safety and free flow of traffic on the trunk road and to ensure that the transportation of abnormal loads will not have any detrimental effect on the trunk road network. 4. No development or ground breaking works shall commence until a programme of archaeological works in ... view the full minutes text for item 8.