Resolved
Decision The Committee agreed to grant planning permission in principle subject to the following conditions and reasons: Standard Time Limit Condition (as defined by Regulation) Standard Condition on Soil Management During Construction Additional Conditions 1 PPP - Approved Details & Standard Notes – Non EIA Development Plans and particulars of the matters specified in conditions 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16 and 17 below shall be submitted by way of application(s) for Approval of Matters Specified in Conditions in accordance with the timescales and other limitations in Section 59 of the Town and Country Planning (Scotland) Act 1997 as amended. Thereafter the development shall be completed wholly in accordance with the approved details. Reason: To accord with Section 59 of the Town and Country Planning (Scotland) Act 1997 as amended. 2. PPP - Approved Details & Standard Notes – Non EIA Development The development shall be implemented in accordance with the details specified on the application form dated 12.05.2021, supporting information and, the approved drawings listed in the table below unless the prior written approval of the planning authority is obtained for an amendment to the approved details under Section 64 of the Town and Country Planning (Scotland) Act 1997. Plan Title. Plan Ref. No. Version Date Received Location maps and croft plan 599/01 04.10.2023 Site Survey Plan 599/03 29.09.2023 Revised floor levels houses 9 and 10 1 of 2 19.01.2024 Reason: For the purpose of clarity, to ensure that the development is implemented in accordance with the approved details. 3 PPP - Provision of Adoptable Standard Service Road Pursuant to Condition 1. – no development shall commence until details of the proposed service road and connection with the existing public road have been submitted to and approved by the Planning Authority. Such details shall incorporate: i) A vehicular access layout providing a Road over which the public has a right of access in terms of the Roads (Scotland) Act 1984; ii) A junction with the existing public road formed with visibility splays of 2.40 metres to point X by 75 metres to point Y formed from the centre line of the junction; iii) A bus bay to be incorporated into the junction design with hardstanding on constructed opposite the junction to provide for a bus drop off point; iv) The junction of adoptable standard development road is to be sited no closer than 25 metres from the nearest existing junction; v) The development road is to have either 2.00 metre wide footways or 2.00 metre wide service strips; vi) The development road is to be no less than 5.50 metres wide; vii) A turning head for the public service vehicle at the end of the adoptable standard road; viii) Roads design to incorporate Sustainable Urban Drainage ( SuDS ); ix) Hardstanding for the provision of two grit bins; x) Details for the provision of two village gateway signs to erected on the public road; xi) Details for the provision of pedestrian on road signage to be provided and erected between the development site; xii) Details for the provision of the existing public road verge to be widened out to provide safe step offs for pedestrians between the development and Craighouse School; xiii) Details for the provision of road name signs. Prior to work starting on site, the junction with the existing public road shall be fully formed and surfaced and the visibility splays shall be cleared of all obstructions such that nothing shall disrupt visibility from a point 1.05 metres above the junction at point X to a point 0.6 metres above the public road carriageway at point Y. The visibility splays shall be maintained clear of all obstructions thereafter. All access roads, footways and step offs granted consent shall be constructed to at least base course level prior to any work starting on the erection of the buildings which they are intended to serve and the final wearing surface of the roads, footways and step offs shall be applied concurrently with the construction of the final building. Reason: In the interests of road safety and to ensure the timely provision of a service road commensurate to the scale of the overall development and having regard to the status of the proposed access as a residential service road. Note to Applicant: Road Construction Consent under the Roads (Scotland) Act 1984 must be obtained from the Council’s Roads Engineers and a Road Bond provided prior to the formation of the access within the development site. 4. PPP – Access/Parking/Turning for Multiple Buildings served by an Adoptable Road Pursuant to Condition 1 – no development shall be commenced in respect of any individual building until plans and particulars of the means of vehicular access and parking/turning arrangements to serve that building have been submitted to and approved by the Planning Authority. Such details shall incorporate: i) Means of vehicular access to that building from the service road shall be formed with junctions of 90 degrees with visibility splays of 2.40 metres to point X by 25 metres to point Y formed from the centre line of the junction or provision of 2.5m by 5m parking bays located behind any footway/service strip; ii) The provision of parking and turning in accordance with the requirements of policy LP TRAN 6 and Appendix C of the Argyll and Bute Local Development Plan 2015. The approved means of vehicular access to the building shall be implemented in full prior to the commencement of construction of the development which the access is ... view the full minutes text for item 5.