Resolved
Decision The Committee agreed to grant planning permission in principle subject to the satisfactory conclusion of a section 75 agreement, and the following conditions and reasons: Standard Time Limit Condition (as defined by Regulation) Standard Condition on Soil Management During Construction Additional Conditions 1. PPP – Matters Requiring AMSC Submission Plans and particulars of the matters specified in Conditions 3, 4, 5, 7, 8 and 9 below shall be submitted by way of application(s) for Approval of Matters Specified in Conditions in accordance with the timescales and other limitations in Section 59 of the Town and Country Planning (Scotland) Act 1997 as amended. Thereafter the development shall be completed wholly in accordance with the approved details. Reason: In accordance with Section 59 of the Town and Country Planning (Scotland) Act 1997 (as amended). 2. PPP - Approved Details The development shall be implemented in accordance with the details specified on the application form dated 30.09.2022 supporting information and, the approved drawings listed in the table below. Plan Title. Plan Ref. No. Version Date Received Site Plan & Section 2034 02 B 13.10.2022 Site & Location Plans 2034 03 B 13.10.2022 Cross Sections 2034 04 01.12.2022 Site & Location Plans Road Improvements Proposals 2034 07 A 06.02.2024 Junction Site Plan as Proposed 2034 11 06.02.2024 Reason: To accord with Regulation 28 of the Town and Country Planning (Development Management Procedure) (Scotland) Regulations 2013. 3. Timescale to be Agreed for Completion Pursuant to condition 1 - no development shall commence until details of the proposed timescale for completion of the approved development have been submitted to and approved by the Planning Authority. Thereafter, the development shall be implemented in accordance with the duly approved timescale for completion unless an alternative timescale for completion is otherwise agreed in writing with the Planning Authority. Reason: In order to comply with the requirements of NPF4 Policy 16F. 4. Vehicular Access, Parking and Turning Pursuant to Condition 1 – no development shall commence until plans and particulars of the means of vehicular access and parking/turning arrangements to serve the development have been submitted to and approved by the Planning Authority. Such details shall incorporate: i) The upgrade of the existing access at the connection with the public road in accordance with the Council’s Roads Standard Detail Drawing SD08/002a with visibility splays measuring 2.4 metres to point X by 25 metres to point Y; ii) The provision of a parking and turning area in accordance with the requirements of Policy LDP 11 and Supplementary Guidance SG LDP TRAN 6 of the adopted ‘Argyll and Bute Local Development Plan’ 2015; iii) The provision of a footway to be provided over the total length of the private road; iv) A road carriageway with a minimum width of 3 metres; v) The provision of passing places in accordance with Operational Services Drawing 08/003a at locations approximately 50m, 90m and 180m from the junction with the public road; vi) The provision of a turning head in accordance with Figure 18 of The Roads Development Guide to be provided at the location where the private road separates to serve the dwellings leading to ‘ Toriskay ’ and the dwellings leading to ‘High Acres’ / ‘Rowan Hill’, with a bin storage area to the rear of the turning head; vii) The provision of street lighting ducting to be installed from the junction with the public road to the location where the private road separates to serve the dwellings leading to ‘ Toriskay ’ and the dwellings leading to ‘High Acres’ / ‘Rowan Hill’; Prior to work starting on site, the approved scheme of works shall be completed, and the visibility splays shall be cleared of all obstructions such that nothing shall disrupt visibility from a point 0.6m above the road carriageway at point Y and the visibility splays shall be maintained clear of all obstructions thereafter. Reason: In the interests of road safety. Note to applicant: A Road Opening Permit under the Roads (Scotland) Act 1984 must be obtained from the Council’s Roads Engineers prior to the formation/alteration of a junction with the public road. The access shall be constructed and drained to ensure that no surface water is discharged onto the public road. 5. PPP – Availability of Connection to Public Water Supply Pursuant to Condition 1 - no development shall commence on site until authorisation has been given by Scottish Water for connection to the public water supply. Confirmation of authorisation to connect shall be provided in writing to the Planning Authority before commencement of development. Reason: To ensure that the development is adequately served by a public water supply. Note to Applicant: · In the event that a public water supply connection cannot be obtained an alternative private water supply would constitute a material amendment requiring the submission of a further planning application. 6. Sustainable Drainage System Notwithstanding the provisions of Condition 2, the development shall incorporate a surface water drainage system which is consistent with the principles of Sustainable urban Drainage Systems ( SuDS ) compliant with the guidance set out in CIRIA’s SuDS Manual C753. The requisite surface water drainage shall be operational prior to the development being brought into use and shall be maintained as such thereafter. Reason: To ensure the provision of an adequate surface water drainage system and to prevent flooding . Note to Applicant: · Further advice on SuDS can be found in SEPA’s Standing Advice for Small Scale Development – www.sepa.org.uk . 7. Design and ... view the full minutes text for item 6.