Resolved
Decision The Committee agreed to grant planning permission subject to the following conditions and reasons: Standard Time Limit Condition (as defined by Regulation) Standard Condition on Soil Management During Construction Additional Conditions 1. PP - Approved Details & Standard Notes – Non EIA Development The development shall be implemented in accordance with the details specified on the application form dated 05.08.2023; , supporting information and, the approved drawings listed in the table below unless the prior written approval of the planning authority is obtained for an amendment to the approved details under Section 64 of the Town and Country Planning (Scotland) Act 1997. Plan Title. Plan Ref. No. Version Date Received Location Plan 1 of 15 A 22.08.2023 Existing Site Plan 2 of 15 A 22.08.2023 Existing Site Cross Section and Photos - Sheet 1 of 2 3 of 15 - 01.08.2023 Existing Site Cross Section and Photos - Sheet 2 of 2 4 of 15 - 01.08.2023 Proposed Site Plan 5 of 15 B 29.02.2024 Proposed Site Cross Sections 6 of 15 - 01.08.2023 Proposed Site Cross Section, Access Wall Elevation and Layout Plan 7 of 15 A 23.08.2023 Proposed Sightline Plan 8 of 15 D 22.08.2023 Proposed Elevations and Sections 9 of 15 - 01.08.2023 Proposed Floor/Roof Plans 10 of 15 - 01.08.2023 Planning Design and Access Statement 11 of 15 - 01.08.2023 Tree Survey Report 12 of 15 A 28.02.2024 Bat Scoping Survey Report 13 of 15 - 28.02.2024 Sustainability checklist 14 of 15 - 12.03.2024 Sustainable buildings checklist 15 of 15 - 12.03.2024 Reason : For the purpose of clarity, to ensure that the development is implemented in accordance with the approved details. 2. Sustainable Urban Drainage – Notwithstanding Condition 1, details of a sustainable urban drainage system compliant with the guidance set out in CIRIA’s SuDS Manual C753 must be submitted to and approved in writing by the planning authority prior to construction. The surface water drainage shall be operational prior to the development being brought into use and shall be maintained as such thereafter. Reason : To ensure adequate surface water drainage is implemented to prevent flooding elsewhere. 3. Landscape and Biodiversity Enhancement - Notwithstanding Condition 1, No development shall take place until full details of both hard and soft landscape works to be carried out at the site have been submitted to and approved in writing by the local planning authority. The approved hard landscaping works shall be carried out prior to first occupation of the development and the soft landscaping works within the first planting season following first occupation of the development. The details submitted shall include: - proposed finished site levels or contours; - hard surfacing materials; - details of the number, size and location of the trees, shrubs and plants to be retained and planted together with a planting specification – these shall include compensatory planting for the trees already identified as to be removed as part of the development; - details of measures to enhance biodiversity within the site; - location and design, including materials, of walls, fences and gates; - programme for completion and subsequent on-going maintenance. Any trees or shrubs dying, removed, being severely damaged or becoming seriously diseased within five years of planting shall be replaced with trees or shrubs of such size and species as may be agreed with the Local Planning Authority. Reason : In the interests of biodiversity and the natural environment. 4. External Materials - Notwithstanding Condition 1, Prior to work starting on site samples of the proposed materials to be used for the external finishes of the development hereby granted consent shall be submitted to and approved in writing by the Planning Authority prior to any work starting on site. Reason: In the interests of visual amenity and in order to integrate the proposal with its surroundings. 5. Sustainable Design – Notwithstanding Condition 1, Prior to the commencement of development, details of the on-site micro renewable energy to provide heat or electricity to the property and details of the use of the final materials – including details of any re-cycled materials or local sourced materials and their embodied energy for each materials, shall first be submitted and approved in writing by the Local Planning Authority. Thereafter the approved micro renewables and materials must be used in the development hereby approved. Reason: In order to ensure compliance with LDP2 Policy 09 and to ensure the building is being as energy efficient as possible in order to respond to climate change. 6. Electric Vehicle Charging – Notwithstanding Condition 1, Prior to the commencement of development, details of the provision of electric vehicle charge points shall first be submitted and approved in writing by the Local Planning Authority. Thereafter the electric vehicle charge points must be available for use in the development hereby approved. Reason: In order to ensure compliance with LDP2 Policy 34. 7. Quality homes – Notwithstanding Condition ... view the full minutes text for item 9.