Resolved
Decision The Committee agreed to grant planning permission subject to the following conditions and reasons: Standard Time Limit Condition (as defined by Regulation) Standard Condition on Soil Management During Construction Additional Conditions 1. PP - Approved Details & Standard Notes – Non EIA Development The development shall be implemented in accordance with the details specified on the application form dated 15/12/23, supporting information and, the approved drawings listed in the table below unless the prior written approval of the planning authority is obtained for an amendment to the approved details under Section 64 of the Town and Country Planning (Scotland) Act 1997. Plan Title. Plan Ref. No. Version Date Received Pre-Development Surface Water Run Off Layout 0460-C-0004 P01 08/04/24 Post-Development Surface Water Run Off Layout 0460-C-0005 P01 08/04/24 Proposed Below Ground Drainage Layout 0460-C-0032 P03 08/05/24 Location Plan 5021-02-301 B 19/12/23 Site Plan 5021-02-302 B 19/12/23 GF Plan HT01 5021-03-301 B 19/12/23 GF Plan HT01H 5021-03-301H B 19/12/23 FF Plan HT01 5021-03-302 B 19/12/23 FF Plan HT01 Handed 5021-03-302H B 19/12/23 GF Plan HT03 5021-03-305 B 19/12/23 GF Plan HT03 Handed 5021-03-305H B 19/12/23 FF Plan HT03 5021-03-306 B 19/12/23 FF Plan HT03 Handed 5021-03-306H B 19/12/23 Elevations HT01 5021-04-301 B 19/12/23 Elevations HT01 Handed 5021-04-301H B 19/12/23 Colour Options HT01 5021-04-302 B 19/12/23 Elevations HT03 5021-04-305 B 19/12/23 Elevations HT03 Handed 5021-04-305H B 19/12/23 Colour Options HT03 5021-04-306 B 19/12/23 Site Sections 01 5021-05-301 B 19/12/23 Site Sections 02 5021-05-302 B 19/12/23 Drainage, SUDS and Surface Water Management Plan – 49 Pages 21/03/24 Flood Risk Assessment – 39 Pages 12/02/24 Greenfield Run Off 08/04/24 Percolation Tests – 4 Pages 08/05/24 Supporting Statement – 15 Pages 18/12/23 Surface Water Network (Land Drainage) – 13 Pages 08/04/24 Surface Water Network (Soakaway) – 5 Pages 08/04/24 TN06 – Sustainability Checklist – 7 Pages 18/12/23 TN07 – Sustainable Buildings Checklist – 4 Pages 18/12/23 Reason: For the purpose of clarity, to ensure that the development is implemented in accordance with the approved details. Note to Applicant Regard should be had to Scottish Water and the Oban and District Access Panel comments in relation to the proposed development, details of which are available to view via the Public Access section of the Council’s website. 2. PP – Vehicular Access No development shall commence until plans and particulars of the means of vehicular access to serve the development have been submitted to and approved by the Planning Authority in consultation with the Roads Authority. Such details shall incorporate: i. Upgrade of the existing access at its junction with the B845 comprising a kerb radius of 6 metres and provision of a 2 metre footway at the north west side of the access road; ii. Visibility splays measuring 2.4 metres to point X by 75 metres to point Y from the centre line of the junction; iii. Details of speed calming measures (speed cushions) within the development road at locations to be agreed with the Roads Authority; iv. Details of a passing place approximately midway on the private access road serving Plots 3-04, 3-05 and 3-06; v. Details of a 2 metre level service strip for pedestrian refuge along the extent of the new private access roads; vi. Details of a turning head to Figure 18 of The National Development Guide at the end of the private access road serving Plots 3-04, 3-05 and 3-06; vii. Details of a bin storage area at a point next to the private access road serving Plots 3-01 and 3-02. Prior to work starting on site, the approved scheme of works in respect of junction upgrade shall be formed to at least base course standard and the visibility splays shall be cleared of all obstructions such that nothing shall disrupt visibility from a point 1.05 metres above the junction at point X to a point 0.6 metres above the public road carriageway at point Y. The final wearing surface on the access shall be completed prior to the development first being brought into use and the visibility splays shall be maintained clear of all obstructions thereafter. The approved speed calming measures, passing place, service strips, turning head and bin storage area shall be implemented in full prior to the development first being occupied to the satisfaction of the Roads Authority. Reason: In the interests of road safety. Note to Applicant · A Road Opening Permit under the Roads (Scotland) Act 1984 must be obtained from the Council’s Roads Engineers prior to the formation/alteration of a junction with the public road. · The access shall be constructed and drained to ensure that no surface water is discharged onto the public road. · No walls, fences, hedges etc. will be permitted within 2 metres from the channel line of the public road. 3. PP - Sustainable Drainage System The surface water drainage system for the development shall be undertaken in accordance with the Drainage, Suds and Surface Water Management Plan dated March 2024 and the associated drawings set out in Condition 1 above and shall be operational before the first occupation of the first dwellinghouse to be completed. Note to Applicant: Regard should be had to ... view the full minutes text for item 7.