Resolved
Decision The Committee agreed to grant planning permission as a minor departure to Development Plan Policy, subject to the following conditions and reasons and the advisory notes appended to the report of handling: Standard Time Limit Condition (as defined by Regulation) Standard Condition on Soil Management During Construction Additional Conditions 1. Approved Details Unless otherwise directed by any of the conditions below, the development shall be implemented in accordance with the details specified in the application form dated 4 th February 2025; the supporting information; and the approved drawings listed in the table below unless the prior written approval of the planning authority is obtained for an amendment to the approved details under Section 64 of the Town and Country Planning (Scotland) Act 1997. Plan Title. Plan Ref. No. Version Date Received General Arrangement – Site Location Plan Drawing No. HG A3 L(9-)P901 - 05/02/2025 General Arrangement – Site Location Plan Drawing No. HG A3 L(9-)P901A - 07/02/2025 General Arrangements – Site Layout Drawing No. HG GA L (--) P002C C 12/06/2025 General Arrangements – Ground & 1 st Floor Plans Drawing No. GN GA L (--) P003B B 12/06/2025 General Arrangements – Ground Floor Plan Drawing No. HG GA L (--) P004B B 12/06/2025 General Arrangements – First and Mezzanine Floor Plans Drawing No. HG GA L (--) P005B B 12/06/2025 General Arrangements – Sections Drawing No. GN GA L (--) P006B B 12/06/2025 General Arrangements – Proposed Elevations Drawing No. HG GA L (--) P008B B 12/06/2025 General Arrangements – Proposed Elevations Drawing No. GN GA L (--) P009C C 12/06/2025 Reason: For the purpose of clarity, to ensure that the development is implemented in accordance with the approved details. 2. Contaminated Land Assessment Unless otherwise agreed in writing and in advance by the Planning Authority, prior to any development commencing on the site, a scheme will be submitted by the Developer (at their expense) to identify and assess potential contamination on the site. No work on the site shall commence until the scheme has been submitted to, and approved, by the Planning Authority, and is thereafter implemented in accordance with the scheme so approved. The scheme shall be undertaken by a competent person or persons in accordance with relevant authoritative guidance including Planning Advice Note (PAN) 33 (2000) and BS10175:2011 or, in the event of these being superseded or supplemented, the most up-to-date version(s) of any subsequent revision(s) of, and/or supplement(s) to, these documents. This scheme should contain details of proposals to investigate and remediate potential contamination to the satisfaction of the Planning Authority, and must include: a) A desk study and development of a conceptual site model/preliminary risk assessment, including a ground investigation strategy for any phases of ground investigation proposed to be undertaken (exploratory, main or supplementary). The desk study and the scope and method of recommended investigations shall be agreed with the Council prior to addressing parts b, c, and d of this condition. Should the desk study show the need for further assessment, this will be undertaken in the following sequence: a) A detailed investigation of the nature and extent of contamination on site, and assessment of the risks such contamination presents. b) Development and agreement of a remedial strategy (if required) to treat/ remove contamination ensuring the site is made suitable for its proposed use (this shall include a method statement, programme of works and proposed verification plan). c) Submission of a verification report for any agreed remedial actions detailing and evidencing the completion of these works. Written confirmation from the Planning Authority that the scheme has been implemented and completed shall be required by the Developer before any development hereby approved commences. Where remedial measures are required as part of the development construction detail, commencement must be agreed in writing with the Planning Authority. Reason: In order to ensure that the potential risks to human health, the water environment, property, and ecological systems arising from any identified land contamination have been adequately addressed. 3. Short Term Holiday Accommodation The ... view the full minutes text for item 5.