Noted Executive 1 paper

Cabinet noted this item on Monday 16 November 2020. Below is the council's own wording, with the papers it was decided on.

Item284

Resolved

The Cabinet RESOLVED – That (1) The report be noted; (2) Agreement be given to not pursue Options 1, 2, 3, 6 or 8; and (3) Endorsement be given to further investigate and potential viability of Options 4, 5 and 7 as a means of improving access to the lower beach at Bognor Regis with findings and further recommendations being reported back to the relevant Committee.
Word for word from the decision Arun published for this meeting. Source: democracy.arun.gov.uk

Follow this further

Built from Arun's papers

What the report saysPro

Report to Cabinet

Background

1.1The Issues

1.1.1. There has been a long-held belief, by many local residents of Bognor Regis, that the shingle that has been on the beaches of the central area since the 1980s is detrimental to the enjoyment of the beach and that the ‘sandy beaches’ should be returned.

1.1.2. Latterly, there have been calls for better access, not just for able bodied but also for the disabled, to the lower foreshore.

1.1.3. It should be noted that the predominance of shingle along the majority of the Sussex coast is a natural phenomenon and that the sandy beaches of the earlier years of the 20th Century were in the most part due to a combination of the construction of the original seawall and the lack of groyne maintenance during the wartime period. 1.1.4. Shingle is now widely held as the best mechanism to absorb incident wave energy and to avoid, as far as practicable, flood and erosion damage. The sand is present as a thin veneer (~300mm thick) over the underlying strata; little has changed in this respect, although the thickness of the sand layer does fluctuate naturally.

1.1.5. Many investigations, and a number of trials, have been undertaken in recent decades, with the object of providing a better ‘connection’ to the sea. This has usually resulted in the construction of sections of decking, just off the promenade, onto the shingle. Whilst this enables less able-bodied persons to get closer to the water, it does not achieve the ultimate goals of either returning the sands or providing full access.

1.1.6. Recently, a scheme was put forward to lay temporary, seasonal aluminium decking sections from the promenade, over the shingle crest and down the front slope of the beach onto the sand. This was modified to laying the metal sections only on the flat crest area, as the sloping sections would not be Equalities compliant (see 2.2.4). A number of procedural obstacles became apparent and the scheme was put to one side, in favour of looking at the wider provision options. This report starts that process.

1.2Constraints

1.2.1. The area has a tidal range of ~6.5m and is open to the force of prevailing south- westerly wind and waves.

1.2.2. Under natural conditions, the beach is a shingle:sand mix (shingle upper / sand lower). The natural angle of repose of shingle in this area (beach face slope) is around 1 in 9. The shingle is extremely mobile - both underfoot and under the influence of waves, tides and currents. The beach profile will vary and shingle re- distribute on each tide.

1.2.3. The shingle is naturally occurring and drifts under wave action from west to east – this is unpredictable in terms of precise quantities (estimated annual net volume 3,000 - 10,000m3 pa) and sometimes the drift is reversed when wave conditions dictate.

1.2.4. Any provision would need to be Equalities compliant (max gradient vs slope lengths, handrails, edge/surface treatment etc.). Although not directly applicable, Part M of the Building Regulations relates to access and use of buildings. Guidance is available through good practice guides published by Central Government and this is seen as the best applicable in this situation.

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
Beach Access, Bognor RegisReport 783 KB DownloadRead as text

At this meeting

Whole meeting

Who was there

7 of 26 attended
DJ
Councillor Dr. James Walsh KStJ RDChairman, present
FO
Councillor Francis OpplerVice-Chair, present
HC
Councillor Hugh CosterCommittee Member, present
MP
Councillor Mrs Pauline GregoryCommittee Member, present
ML
Councillor Martin LuryCommittee Member, present
MS
Councillor Matt StanleyCommittee Member, present
MS
Councillor Mrs Samantha StaniforthCommittee Member, apologies
MG
Councillor Mrs Gill YeatesCommittee Member, present
JB
Councillor Jamie BennettCommittee Member, in attendance
PB
Councillor Paul BicknellCommittee Member, in attendance
RB
Councillor Richard BowerCommittee Member, in attendance
JB
Councillor Jim BrooksCommittee Member, in attendance

All 26 on the meeting page

On this subject at Arun

Search all
  1. Beach Access, Bognor RegisThis decision
  2. Beach Access UpdateNoted
  3. Beach Access for All, Bognor Regis - Bognor Regis Beach Access Working PartyNoted
  4. Bognor Regis Beach Access Working Party - 09 May 2022Decided
  5. Bognor Regis Beach Access Working PartyDecided
  6. Bognor Regis Beach Access Options AppraisalDecided

More from Arun Cabinet

All decisions
MeetingDecisionOutcome
22 Mar 2021 Urgent BusinessRESOLVED That a letter be sent to West Sussex County Council urging reconsideration of the proposed speed limit on th... Decided Open
22 Mar 2021 Place St Maur and Esplanade Project, Bognor RegisThe Cabinet RESOLVED The designs presented at the meeting for the Place St Maur and the Esplanade, be approved and th... Approved Open
22 Mar 2021 Arun Improvement Programme - UpdateThe Cabinet RESOLVED To note the activities of the Arun Improvement Programme. Noted Open
22 Mar 2021 Options to Progress Webcast Improvement ProjectThe Cabinet RECOMMEND TO FULL COUNCIL – That (1) That the upgrades to the webcasting system set out in the table with... Approved Open
22 Mar 2021 Customer Services StrategyThe Cabinet RESOLVED To formally adopt the 2021-2026 and approve the process of implementation to embed it into the o... Approved Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies