CouncilMonitor
194 principal councils 228,996 meetings since 2000 2.8 million official papers archived Straight from each council's own publication system
Arun District Council
Planning Policy Committee, Tuesday 1 June 2021 at 6.00pm

Arun Local Plan Update - Active Travel Study

Decided Planning 2 papers

Planning Policy Committee decided this item on Tuesday 1 June 2021. Below is the council's own wording, with the papers it was decided on.

Item37

Resolved

RESOLVED that 1) the content of the study be acknowledged 2) its use to inform the development of a revised Arun Local Plan be supported 3) the use of the study as a material consideration for development management decisions in the Arun Local Planning Authority area be supported
Word for word from the decision Arun published for this meeting. Source: democracy.arun.gov.uk

Follow this further

Built from Arun's papers

What the report saysPro

Report to Planning Policy Committee

ACTIVE TRAVEL CONNECTIVITY STUDY MEMBERS PRESENTATION 1ST JUNE 2021 INTRODUCTION

2020 Consultancy has been commissioned by Arun District Council to undertake an Active Travel study into provision for Non-Motorised Users (NMUs), which include pedestrians, cyclists, wheelchair users, horse riders, and those on scooters, to determine the current active travel infrastructure across the Arun district and where improvements can be made.

The aim of this study is to assess the active travel network across Arun to identify existing NMU routes and develop new potential routes that creates a safe and attractive provision to promote and increase the number of trips made by walking, cycling, wheeling, and horse riding for everyday journeys.

ARUN ACTIVE TRAVEL CONNECTIVITY STUDY MEMBERS BRIEFING INTRODUCTION

What is Active Travel? Active travel is primarily defined as making journeys by walking, cycling and scooting. It can also include horse-riding. It is an approach to travel and transport that focuses on physical activity as opposed to motorised means.

Active Travel infrastructure includes: • Traffic free paths; • Shared use paths; • Segregated cycle paths; • Bridleways; • Quietways.

ARUN ACTIVE TRAVEL CONNECTIVITY STUDY MEMBERS BRIEFING EXAMPLE OF A TRAFFIC FREE PATH

A traffic free path provides a route for NMUs that is away from traffic and the road network. The main benefit of these paths is the attractive environment with no traffic conflict. The main drawback is often the paths require land to be acquired making delivery challenging and time consuming.

ARUN ACTIVE TRAVEL CONNECTIVITY STUDY MEMBERS BRIEFING EXAMPLE OF SHARED USE PATH

A shared use path is a wide footway that enables pedestrians and cyclists to share the same space. A shared use path should ideally be at least 3.5m wide to provide sufficient space for users.

The main benefit of a shared use path is the universal connectivity it provides. A shared use path can connect into any trip generator if there is sufficient space. The main drawback is the additional width required, which can make it difficult to deliver where limited roadspace is available.

ARUN ACTIVE TRAVEL CONNECTIVITY STUDY MEMBERS BRIEFING EXAMPLE OF SEGREGATED CYCLE PATH

A segregated cycle path is a facility designed specifically for cyclists for locations where there is benefit for segregation. Examples when a segregated path would be beneficial is in urban environments where there is high volumes of pedestrians and cyclists.

The main benefit of these paths is the protection for cyclists from traffic whilst avoiding pedestrians meaning more direct travel. The main drawback is the need to have sufficient room within the public highway to allow a safe facility that has the appropriate segregation.

ARUN ACTIVE TRAVEL CONNECTIVITY STUDY MEMBERS BRIEFING EXISTING ACTIVE TRAVEL PROVISION

The map below demonstrates the existing active travel provision across the Arun District. This doesn’t include any bridleways and public rights of way.

ARUN ACTIVE TRAVEL CONNECTIVITY STUDY MEMBERS BRIEFING TRIP GENERATORS There are a number of trip generators across the Arun District that could be accessed by active travel. These include.

Town centres Open spaces

Tourist attractions Public transport nodes Education establishments

ARUN ACTIVE TRAVEL CONNECTIVITY STUDY MEMBERS BRIEFING TRIP GENERATORS A lot of education establishments are near existing active travel routes, which means small connections will provide a lot better connectivity, increasing the likelihood of achieving modal shift for school / college journeys.

ARUN ACTIVE TRAVEL CONNECTIVITY STUDY MEMBERS BRIEFING TRIP GENERATORS Education Linkage Linkage Linkage Location Existing Active Travel Route Location Existing Active Travel Route Education Establishment Location Existing Active Travel Route Education Establishment Establishment Distance Distance Distance

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
Active Travel Connectivity Study Presentation by 2020 Consultancy to MembersReport 13 MB DownloadRead as text
PDF
Arun Local Plan Update: Active Travel StudyReport 220 KB Download

At this meeting

Whole meeting

Who was there

10 of 16 attended
RB
Councillor Richard BowerChair, present
CH
Councillor Christopher HughesVice-Chair, present
TC
Councillor Terence ChapmanCommittee Member, apologies
JC
Councillor John CharlesCommittee Member, present
HC
Councillor Hugh CosterCommittee Member, present
RE
Councillor Roger ElkinsCommittee Member, present
SG
Councillor Steve GoodheartCommittee Member, present
HJ
Councillor Henry JonesCommittee Member, present
ML
Councillor Martin LuryCommittee Member, present
IT
Councillor Isabel ThurstonCommittee Member, present
GY
Councillor Gill YeatesCommittee Member, present
PB
Councillor Paul BicknellGuest, in attendance

All 16 on the meeting page

On this subject at Arun

Search all
  1. Arun Local Plan Update - Active Travel StudyThis decision
  2. Arun Local Development Scheme (LDS) UpdateApproved
  3. Arun Local Plan Update (2023 - 2041) - Appointment of Lead Consultant following an Open Tender processDeferred
  4. Arundel Town Council Local Walking and Cycling Infrastructure Plan (LCWIP)Decided
  5. Arun Local Community Network UpdateDecided
  6. Arun Local Plan Update - Creating Healthy Places - A Public Health and Sustainability Framework for West SussexApproved

More from Arun Planning Policy Committee

All decisions
MeetingDecisionOutcome
26 Mar 2026 Arun Community Infrastructure Levy - Infrastructure Investment Plan (2024-2026)RESOLVED to approve 1. Moving the Palmer Road Angmering sports hub project from the IIP Baseline longlist to the IIP ... Approved Open
26 Mar 2026 Arun Biodiversity Action PlanRESOLVED to agree to 1. Endorse the (BAP) and approve the document for publication. 2. Delegate authority to the Grou... Agreed Open
2 Feb 2026 Committee Revenue Budget 2026/27RESOLVED to Agree the 2026/27 Revenue Budget as set out in Appendix A and recommends to the Policy and Resources Comm... Agreed Open
2 Feb 2026 Consultation on Draft Conservation Area Character AppraisalsRESOLVED i) The draft conservation area character appraisals for Aldingbourne, Norton, Shripney, and Angmering (three... Agreed Open
26 Nov 2025 Arun Brownfield Land RegisterRESOLVED to: i. Note the 2025 Brownfield Land Register (Part 1); and ii. Keep the Brownfield Land Register under revi... Noted Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies