Resolved
Cabinet RESOLVED to approve £538,280.36 from the Council’s Basic Need Allocation to deliver the kitchen and £189,300.64 s106 funding, as detailed within sections 4.5 and 4.6 of the report.
Cabinet approved this item on Tuesday 6 April 2021. Below is the council's own wording, with the papers it was decided on.
Resolved
Cabinet RESOLVED to approve £538,280.36 from the Council’s Basic Need Allocation to deliver the kitchen and £189,300.64 s106 funding, as detailed within sections 4.5 and 4.6 of the report.
1.1The report concerns an extension to kitchen facilities at Roe Green Infant School. This report requests approval to assign capital funding to deliver a kitchen extension project at Roe Green Infant School.
2.0Recommendation(s)
Cabinet is requested to:
2.1Approve £538,280.36 from the Council’s Basic Need Allocation to deliver the kitchen and £189,300.64 s106 funding, as per paragraphs 4.5 and 4.6. 3.0 Background
3.1Section 106, part 5 of the Children and Families Act 2014 requires school to provide free school meals for all pupils in Reception, Year 1 and Year 2. It came into effect from September 2014 and applies to maintained schools, academies, free schools and pupil referral units.
3.2Roe Green Infant School has four forms of entry, with classes of 30 children in each reception, year 1 and year 2 class, totalling 360 children across the infant school alone. At present, infant school meals are prepared at the Roe Green Strathcona School and then transported over to Roe Green Infant School.
3.3The current provision at Roe Green Infant School includes a kitchen servery, which is 25.2m² in size and below the minimum recommended area according to Building Bulletin 103 (BB103), which sets out the area guidelines for mainstream schools.
3.4The proposed costs for this project are in fact delayed costs. Had the catering provision at Roe Green Strathcona not been in place, it would have been necessary to make provision for kitchen catering facilities at Roe Green Infant School much earlier to ensure universal infant fee school meals could be provided. Given the planned closure of the Roe Green Strathcona School, it will now be necessary to make such alternative arrangements for the provision of infant free school meals.
3.5Officers from the Council appointed technical consultants to produce a feasibility study at RIBA Stage 1 to determine feasible options of providing catering facilities at Roe Green Infant school. The feasibility study consisted of:
1. A survey of the site to understand the working arrangements between the school and opportunities for locating the new kitchen
2. Undertaking a BB103 analysis to establish the area requirements and align with the proposed capacity need of the kitchen
3. Producing design options for a new kitchen facility
4. Production of a cost estimate. This will be used by contractors to review whether the project can be delivered for this cost envelope before contracts are awarded
5. Producing a project programme
3.6Officers of the Council, the technical consultants and the School’s Senior Leadership Team worked to define the facilities required. Based on this the project will provide the school with:
1. An extension of servery – this will include provision of an extended kitchen with the required catering equipment
2. Building Fabric Condition Improvement Works – these include repairs, refurbishment and decoration to parts of the building showing signs of wear and tear, and investigation into ongoing roof leak issue, which may have an impact on the proposed kitchen extension
3. Mechanical and Electrical Condition Improvement Works – these include further analysis of mechanical and electrical condition, fire and security alarm extension, recommissioning of the heating system and reinstating hot and cold water systems in order to facilitate the kitchen extension
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
PDF |
Roe Green Infant School Kitchen & Improvement Works: Approval of Capital FundingReport | 273 KB | DownloadRead as text |
Follow Cabinet at Brent and we tell you when its next papers are published, before the meeting rather than after it.
| Meeting | Decision | Outcome | |
|---|---|---|---|
| 9 Nov 2026 | Apologies for AbsenceApologies for absence were received from Thomas Cattermole (Corporate Director Resident & Housing Services) with Spen... | Decided | Open |
| 9 Nov 2026 | Declarations of InterestCouncillor Grahl declared a personal interest in relation to Agenda Item 10 (Rent Setting Policy Statement) and Agend... | Decided | Open |
| 9 Nov 2026 | Minutes of the Previous MeetingCabinet RESOLVED that the minutes of the previous meeting held on Monday 12 October 2026 be approved as a correct rec... | Approved | Open |
| 9 Nov 2026 | Matters Arising (if any)None identified. | Decided | Open |
| 9 Nov 2026 | Petitions (if any)There were no petitions presented at the meeting. | Decided | Open |
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Keeps you signed in and runs your free-paper allowance. Always on.
Counts visits and which pages are used. First-party only, no advertising, never shared.