Item XX - Appendix 1 SUMMARY OF PROPOSED 2022/23 LOCAL TRANSPORT PLAN [LTP] CAPITAL PROGRAMME NEW ALLOCATIONS
Project/ Description 2022/23 Programme (see Footnotes below for explanation of symbols) Proposed New Allocation (£’000s) CAPITAL RENEWAL/MAINTENANCE Maintaining links and routes to improve…………. Surfaces Roads # 400 Pavement/Footways 350 Drainage Replacement of failed gullies/soakaways 175 Street Lighting Replacement of connections and columns @ 300 Bridges & Structures Retaining Walls 175 Seafront Highway Arches Renewal Programme Phases 3 & 4 design - King’s Road 250 Arch 181 180 Duke’s Mound Arches 300 Highway Asset Management Surveys/update inventory/strategy evidence 50 CAPITAL RENEWAL/MAINTENANCE SUB-TOTAL 2,180
INTEGRATED/SUSTAINABLE TRANSPORT Connecting people with………. Education, Training & Learning School Streets 150 School Travel Plan Measures * 10 SUB-TOTAL 160 Workplaces & job opportunities Business Travel Plan Measures * 20 Personalised Travel Planning * 10 SUB-TOTAL 30 Parks, open spaces & the National Park Rights of Way Improvement Programme 50 SUB-TOTAL 50 Interchanges Cycle parking 10 Motorcycle parking 10 Accessible bus-stops 50 SUB-TOTAL 70 Improving neighbourhoods with………. Road Safety measures Collision/casualty/speed reduction sites 150 SUB-TOTAL 150 Air Quality measures Electric vehicle charging points 50 SUB-TOTAL continued……………./ 50
67 Project/ Description 2022/23 Programme (see Footnotes below for explanation of symbols) Proposed New Allocation (£’000s) Active travel measures Pedestrian crossings – freestanding sites 225 Walking network – incl. dropped kerbs and handrails 100 Cycle network/Active Travel Fund Tranche 1 & 2 works 900 SUB-TOTAL 1,225 Managing links and routes with………. Technology & Travel Information ‘Intelligent/smart’ Traffic Signals 300 SUB-TOTAL 300 Connecting people and neighbourhoods with, and improving, the .............. City Centre & Seafront Valley Gardens:Phases 1 & 2 – completion 50 Valley Gardens:Phase 3 – detailed design and construction ** 0 Bus Network Infrastructure 200 SUB-TOTAL 250 General allocations ‘Section 106’ Various sites + 50 works Minor works Scheme completion & scoping/Monitoring 23 SUB-TOTAL 73 INTEGRATED/SUSTAINABLE TRANSPORT SUB-TOTAL 2,358 TOTAL LTP ALLOCATIONS 4,538 Overall funding and budgetary sources/decisions for allocations:- Government Funding LTP Integrated Transport Block Grant Allocation 3,083 LTP Maintenance Block Grant Allocation 1,455 Highway Maintenance Incentive Fund (based on Band 3 assessment) 364 Pothole funding 1,455 SUB-TOTAL 6,357 Council Funding Street lighting ‘Invest to Save’ 2,000 Seafront heritage lighting renewal programme 250 Brighton Bikeshare Replacement Programme 704 Strategic Transport Model 500 SUB-TOTAL 3,454 Local Enterprise Partnership [LEP] Local Growth Fund – Valley Gardens Phase 3 1,455 SUB-TOTAL 1,455 GRAND TOTAL 11,266
Footnotes # - sum will be increased through addition of Government Incentive Funding allocation (£364,000
based on Band 3 self-assessment ranking) and Pothole funding (£1.455m).
@ - committed contribution to ‘Invest to Save’ project (PR&G Committee – 8/2/16).
68 + - to enable design and delivery of works associated with approved development.
* - local contribution to support DfT-funded Capability Fund projects, subject to confirmation of funds
** - local contribution not required in 2022/23 - funded by LEP Local Growth Fund.
NOTES – In many cases, costs indicated within the proposed programme are preliminary estimates. Expenditure on schemes may need to be increased, reduced or deferred during a financial year as information becomes available, such as survey results, tender returns or unforeseen engineering difficulties. The timing of construction works may be subject to network co-ordination with other council projects, development, utility companies, contractor availability and weather conditions.
69 70
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
PDF |
Local Transport Plan 2022/23 Capital Programme APX. n 1Report | 418 KB | DownloadRead as text |
PDF |
Local Transport Plan 2022/23 Capital ProgrammeReport | 313 KB | Download |
PDF |
View as HTML (84./2) 67 KBReport | 67 KB | Copy on its way |
PDF |
View item 84. as HTML 113 KBReport | 113 KB | Copy on its way |
Follow Environment, Transport & Sustainability Committee at Brighton and Hove and we tell you when its next papers are published, before the meeting rather than after it.
| Meeting | Decision | Outcome | |
|---|---|---|---|
| 14 Mar 2023 | Official Feed and Food Controls Service Delivery Plan 1 April 2023 - 31 March 2024View the decision text for item 86. | Decided | Open |
| 14 Mar 2023 | Public Toilet UpdateView the decision text for item 87. | Decided | Open |
| 14 Mar 2023 | City Environment Improvement Programme UpdateView the decision text for item 88. | Decided | Open |
| 14 Mar 2023 | Local Transport Plan 2023/24 Capital ProgrammeView the decision text for item 89. | Decided | Open |
| 14 Mar 2023 | Mini Holland feasibility study - Wish & WestbourneView the decision text for item 90. | Decided | Open |
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Keeps you signed in and runs your free-paper allowance. Always on.
Counts visits and which pages are used. First-party only, no advertising, never shared.