A23 Active Travel Scheme - Phase 1

Decided Committee 9 papers

Environment, Transport & Sustainability Committee decided this item on Tuesday 15 March 2022. Below is the council's own wording, with the papers it was decided on.

Item89

Resolved

View the decision text for item 89.
Word for word from the decision Brighton and Hove published for this meeting. Source: democracy.brighton-hove.gov.uk

Follow this further

Built from Brighton and Hove's papers

What the report saysPro

Report to Environment, Transport & Sustainability Committee

Notes

1. Preliminary design has been developed using topographical survey information but presented with OS mapping background to provide further context. As such minor discrepancies between proposals and mapping background may be present.

2.33.0 1.0 4.5 1.8 3.3 (Proposed) Key to symbols

Cambridge Kerb Transition Kerb Flush Kerb 0-6mm flush kerb Cycle Track/Lane 1.7 2.7 6.6 1.8 3.1 Shared Use (Existing) Section J-J Carriageway

Bus Lane Highway Boundary Traffic Sign

Gullies to be relocated

Existing parking Proposed Gullies converted to loading bay Existing gullies/change in gully levels

Existing access Existing feature to be relocated Existing parking provision retained Existing feature/change in levels provision retained NLC Non-LED Lighting Column LC LED Lighting Column Existing parking SP Sign Post provision retained TS Traffic Signal BO Bollard Existing signal controllled P Pole 4.5

1.7

NLC J crossing upgraded Existing two lane arrangement Reference drawings to Toucan Crossing reduced to single lane on approach to Argyle Road 6 NCN20 559

NCN20 NCN20

NCN20

NCN20 NCN20

NLC NCN20

NCN20

J 1

NLC 3

1.5For Continuation See Sheet 13

Existing bus stop relocated to facilitate new highway layout 1.5 Shared use provsion to enable safe Existing access movements of pedestrians and cyclists provision retained through junction layout

New bi-directional separated cycle track Existing parking provision retained Existing tree retained resulting in localised reduction in cycle lane widths Existing parking provision to be removed Existing side road Existing signal controlled arrangement reconfigured to crossing retained provide cycle infrastructure Mott MacDonald House 8-10 Sydenham Road Croydon, CR0 2EE United Kingdom

T +44 (0)20 8774 2000 F +44 (0)20 8681 5706 W mottmac.com

Client

Title A23 Active Travel Scheme Preliminary Design General Arrangement Sheet 14 of 14

Designed Eng check .. Drawn Coordination ..

Dwg check Approved Scale at A1 Status Rev Security

1:500 PRE Rep STD © Mott MacDonald Drawing Number This document is issued for the party which commissioned it and for specific purposes connected with the captioned project only. It should not be relied upon by any other party or used for any other purpose. We accept no responsibility for the consequences of this document being relied upon by any other party, or being used for any other purpose, or containing any error or omission which is due to an error or omission in data supplied to us by other parties.

C:\Users\emi94013\Mott MacDonald\BHCC Design and Transport Fram - Do\Projects\04 A23 EATF Cycle Scheme Design\Technical Work\Acad\DR\Survey of existing info\Work in progress\103332-MMD-DD-XX-DR-HW-0014 P6 sheet 14 of 14.dwg Feb 17, 2022 - 8:25PM EMI94013 Notes

1. Preliminary design has been developed using topographical survey information but presented with OS mapping background to provide further context. As such minor discrepancies between proposals and mapping background may be present.

Key to symbols

Cambridge Kerb Transition Kerb Flush Kerb 0-6mm flush kerb Cycle Track/Lane

Shared Use

Carriageway

Bus Lane Highway Boundary Traffic Sign

Gullies to be relocated

Proposed Gullies

Existing gullies/change in gully levels

Existing feature to be relocated Existing crossing Existing feature/change in levels arrangement reconfigured to suit revised highway layout NLC Non-LED Lighting Column Opportunity for SuDS LC LED Lighting Column

3 SP Sign Post Existing 30mph speed limit TS Traffic Signal 3 changed to 20mph up to junction

1.5BO Bollard with Stanford Avenue

3 Pole

1 P 2

3 NLC Reference drawings

6 7.4

4.5NCN20

3 LOOK RIGHT

NCN20 NCN20 NCN20

NCN20

NCN20 NCN20

NCN20 NCN20 560

NLC

1.52 NLC

NLC

2 3 2

New stepped cycle track Relocated bus For Continuation See Sheet 12

border hybrid stop

For Continuation See Sheet 14 New bi-directional separated cycle track

Existing forecourt to be accessed via Dyke Road Drive

Existing side road arrangement reconfigured to provide cycle priority Mott MacDonald House 8-10 Sydenham Road Croydon, CR0 2EE United Kingdom

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
A23 Active Travel Scheme: Phase 1 APX. n 1Report 2.6 MB DownloadRead as text
PDF
A23 Active Travel Scheme: Phase 1 APX. n 2Report 442 KB Download
PDF
A23 Active Travel Scheme: Phase 1 APX. n 3Report 1.1 MB Download
PDF
A23 Active Travel Scheme: Phase 1 APX. n 4Report 598 KB Download
PDF
A23 Active Travel Scheme: Phase 1Report 289 KB Download
PDF
View as HTML (89./2) 261 KBReport 261 KB Copy on its way
PDF
View as HTML (89./3) 150 KBReport 150 KB Copy on its way
PDF
View as HTML (89./4) 92 KBReport 92 KB Copy on its way
PDF
View item 89. as HTML 87 KBReport 87 KB Copy on its way

At this meeting

Whole meeting

On this subject at Brighton and Hove

Search all
  1. A23 Active Travel Scheme - Phase 1This decision
  2. A259 Hove to Portslade Active Travel Scheme ConsultationDecided
  3. A23 Phase 1 Active Travel Scheme - TRODecided
  4. A259 Active Travel Improvement Scheme Fourth Avenue - Wharf RoadDecided
  5. Madeira Drive Active Travel Fund ETRO-10-2021Decided
  6. Active Travel Fund - A259Decided

More from Brighton and Hove Environment, Transport & Sustainability Committee

All decisions
MeetingDecisionOutcome
14 Mar 2023 Official Feed and Food Controls Service Delivery Plan 1 April 2023 - 31 March 2024View the decision text for item 86. Decided Open
14 Mar 2023 Public Toilet UpdateView the decision text for item 87. Decided Open
14 Mar 2023 City Environment Improvement Programme UpdateView the decision text for item 88. Decided Open
14 Mar 2023 Local Transport Plan 2023/24 Capital ProgrammeView the decision text for item 89. Decided Open
14 Mar 2023 Mini Holland feasibility study - Wish & WestbourneView the decision text for item 90. Decided Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies