CouncilMonitor
194 principal councils 228,996 meetings since 2000 2.8 million official papers archived Straight from each council's own publication system
London Borough of Bromley
Plans Sub-Committee No. 3, Thursday 17 March 2011 at 7.00pm

(11/00140/VAR) - Bournewood Sand & Gravel, Swanley Bypass, Swanley.

Decided Committee 1 paper

Plans Sub-Committee No. 3 decided this item on Thursday 17 March 2011. Below is the council's own wording, with the papers it was decided on.

Item33.14

Resolved

WITHDRAWN BY CHIEF PLANNER
Word for word from the decision Bromley published for this meeting. Source: cds.bromley.gov.uk

Follow this further

Built from Bromley's papers

What the report saysPro

Report to Plans Sub-Committee No. 3

SECTION ‘2’ – Applications meriting special consideration

Application No : 11/00140/VAR Ward: Cray Valley East

Address : Bournewood Sand And Gravel Swanley Bypass Swanley BR8 7QH

OS Grid Ref: E: 550231 N: 168274

Applicant : Bournewood Sand And Gravel Ltd Objections : YES

Description of Development:

Variation of conditions 1,12,13 and 16 of 00/02071 and condition 1 of 08/03444 to allow infilling only of existing quarry with inert waste and restoration with associated access, buildings and structures to continue/ remain until 14 January 2018

Proposal

This application in simple terms seeks an extension of time within which to complete the infilling only at this site, the permission for which expired on 14th January 2011.

In procedural terms this involves the variation of three conditions from a permission granted in 2000 for the works, and one condition from a permission granted in 2008 for buildings at the site in connection with the works, all of which impose a time limit on aspects of the development:

Condition 01 of 00/02071 requires that “The use hereby permitted shall cease on or before the 14th January 2011. The repair shed, security compound comprising 3m high palisade fence around perimeter of the compound, caravan for overnight accommodation for security guard, storage container, mess hut, two storey office/inspection and 3 metre high palisade fence along the northern boundary of the site facility and any associated structures or materials shall be removed from the site on or before the 14th January 2011.”;

Condition 12 of 00/02071 requires that “The use of the means of access to the A20(T) included in the development hereby permitted shall be discontinued, the works and structures removed and the site restored on or before the 14th January 2011.”;

Condition 13 of 00/02071 requires that “The signs approved under reference 99/02071, and more specifically shown on drawing No. 98023/4 shall be maintained as such to the satisfaction of the Traffic Director for London for the duration of the development and removed on or before the 14th January 2011.; and

Condition 01 of 08/03444 requires that all of the buildings and structures hereby permitted shall be completely removed from the land on or before 14th January 2011.

• The period requested for the extension of time is 7 years to 14th January 2018 • The application supporting documents explain that it is submitted on the basis that it is now not possible to adhere to the original timescale due to progress on site, in particular in order to restore the land within the current timescale would involve sourcing material from a wide area and excessive vehicle trips. • It is stated that the current economic conditions mean that the amount of material available for infilling has been much reduced. • It is further stated that delays in achieving the required licence from the Environment Agency effectively meant that the infilling was delayed by approximately 7 years, only commencing in December 2007.

Location

The site is located to the eastern edge of the Borough, between the A20 and railway line on the east and south sides and open land to the north and west. The site is already a working quarry with vehicular access directly onto the A20.

Comments from Local Residents

A number of concerns have been raised by local residents regarding the site and proposal, and additionally activities on land adjacent to the site. Amongst the concerns raised are:

• the application is for the same timescale as the previous proposal but without any further extraction and therefore the time calculations do not seem to be correct • vehicular access to and from the site is being achieved via a public footpath • materials are being dumped on adjacent land from the quarry. • the site has scarred the local landscape • noise and dust have affected local residents • use is un-neighbourly and has spoilt the countryside including the springs and streams through Bourne Wood the land should be restored as soon as possible

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
(11/00140/VAR): Bournewood Sand & Gravel, Swanley Bypass, Swanley.Plan 61 KB DownloadRead as text

At this meeting

Whole meeting
30APOLOGIES FOR ABSENCE AND NOTIFICATION OF ALTERNATE MEMBERSDecided 31DECLARATIONS OF INTERESTDecided 32CONFIRMATION OF MINUTES OF MEETING HELD ON 20 JANUARY 2011Decided 33.1(10/02841/FULL6) - 83 Whitecroft Way, Beckenham.Decided 33.2(10/03005/VAR) - The Spinney, 31 Park Avenue,Refused 33.3(10/03044/FULL1) - 8 Beech Dell, Keston.Refused 33.4(10/03047/CAC) - 8 Beech Dell, Keston.Decided 33.5(10/03086/FULL1) - Invicta Works, Chalk Pit Avenue, Orpington.Deferred 33.6(10/03418/FULL1) - Land Opposite Trunks House, Trunks Alley, Swanley.Decided 33.7(10/03498/FULL1) - Blandings, Sundridge Avenue, Bromley.Decided 33.8(10/03627/FULL6) - 9 Forest Drive, Keston.Decided 33.9(10/03639/FULL6) - 2 The Drive, Beckenham.Decided 33.10(10/03693/FULL1) - World of Golf, Sidcup By Pass Road, Chislehurst.Decided 33.11(11/00026/CAC) - 3 Meadow Way, Orpington.Refused 33.12(11/00027/FULL1) - 3 Meadow Way, Orpington.Refused 33.13(11/00047/FULL1) - 66 Park Road, Beckenham.Decided
33.14(11/00140/VAR) - Bournewood Sand & Gravel, Swanley Bypass, Swanley.This decision
33.15(11/00164/FULL1) - 305 Main Road, Biggin Hill.Decided 33.16(11/00193/FULL1) - Johnson Court, 143A Chislehurst Road, Orpington.Decided 33.17(10/01589/FULL6) - 23 Treewall Gardens, Bromley.Decided 33.18(10/02752/FULL2) - Lower Hockenden Farm, Hockenden Lane, Swanley.Decided 33.19(10/03392/FULL6) - 43 Balmoral Avenue, Beckenham.Decided 33.20(10/03671/FULL6) - 70 Elwill Way, Beckenham.Refused 33.21(11/00087/PLUD) - 31 Malmains Way, Beckenham.Decided 34.1(DRR/11/025) Ongoing excavation at Bournewood Quarry, Swanley By-Pass.Deferred 35.1Objections to Tree Preservation Order 2389 at 6 Glendale Mews, Beckenham.Decided 35.2Objections to Tree Preservation Order 2386 at 57 Yester Road, Chislehurst.Decided

On this subject at Bromley

Search all
  1. (11/00140/VAR) - Bournewood Sand & Gravel, Swanley Bypass, Swanley.This decision
  2. (11/00140/VAR) - Bournewood Sand & Gravel, Swanley Bypass, Swanley.Approved
  3. (10/00657/VAR) - Bournewood Sand and Gravel, Swanley Bypass, Swanley.Refused

More from Bromley Plans Sub-Committee No. 3

All decisions
MeetingDecisionOutcome
22 Feb 2024 Apologies for absence and notification of substitute membersNone received Decided Open
22 Feb 2024 Declarations of interestNone received Decided Open
22 Feb 2024 Confirmation of minutes of meeting held on 21st december 2023Confirmed Decided Open
22 Feb 2024 (22/04947/ELUD) - 243 Court Road, Orpington, BR6 9BYREFUSED Kelsey & Eden Park Refused Open
22 Feb 2024 (23/04018/ADV) - Bandstand, Croydon Road Recreation Ground, Beckenham, BR3 3PRADVERTISEMENT CONSENT GRANTED West Wickham Decided Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies