NORMAN PARK ATHLETICS TRACK - FUTURE PROPOSALS

Decided Scrutiny 4 papers

Renewal, Recreation and Housing Policy Development and Scrutiny Committee decided this item on Thursday 26 January 2017. Below is the council's own wording, with the papers it was decided on.

Item54

Resolved

RESOLVED that Members’ comments on the proposals submitted by Blackheath and Bromley Harriers Athletic Club be presented to the meeting of the Executive to be held on 8 February 2017.
Word for word from the decision Bromley published for this meeting. Source: cds.bromley.gov.uk

Follow this further

Built from Bromley's papers

What the report saysPro

Report to Renewal, Recreation and Housing Policy Development and Scrutiny Committee, 1 pages

Do Not Scale Print

5M Run-Off 40M Sprint Track Existing Light Column to be relocated 1.7M Start Area Existing Tree Shown Existing Tree Shown 4 Dotted to be Removed Dotted to be Removed

Pedestrian Gravel or Hogging Pedestrian Gravel or Hogging

Plant Room Existing Sheds Areas =8M2 Sprint Track Internal Area = M2 Strength & Conditioning Weight Training Existing Green Area = 102.8M2 Allow 3000mm Floor to Ceiling at Ground Floor Level Elec. Stair & Lift Lobby Areas = 30.5M2 Room Allow 4000mm Floor to Ceiling for Sprint Track Room Areas = 4.5M2 3000mm Floor To Ceiling Within This Zone

Existing Sheds Existing Pavilion Corridor Lobby

Existing Green Area = 22M2 Areas = 23 M2 Store Areas Store Areas Allow 3000mm Floor to Ceiling

Existing Pavillion at Ground Floor Level

= 11M2 = 11.2M2 Outdoor Track Storage Indoor TRACK Corridor & Lobby Female Changing Room to be Main Entrance Access. Track Storage to be Demolished Area = 53.3M2 & Showers Female Toilet &

Gross Area Removed Allow 3000mm Floor to Ceiling at Ground Floor Level Toilets Change

Pedestrian Area = 24.8 M2 Area =5.5M2 Area = 13M2

Gross Area Potential Secure

= 431.0M2 Outdoor Creche Sliding Folding Doors

D-WC Play Space

= 26.5M2 Main Entrance Flexible Community

Severy Hatch with Roller Shutter Flexibile Usage & Club Multi Purpose Areas = 158M2

Pedestrian Area = 73.8M2

2M Wide x 1.5M High Allow 3000mm Floor to Ceiling at Ground Floor Level Male Changing Manager Office & Showers Areas =12.4M2 = 5.5 M2 Area = 33M2 Allow 3000mm Floor to Ceiling Male Area = 21M2 at Ground Floor Level Toilets

Pedestrian Access High Level Windows High Level Windows High Level Windows

ESCAPE

Pedestrian Gravel or Hogging Approach from Pedestrian Gravel or Hogging CLUB HOUSE Pedestrian Gravel or Hogging Pedestrian Gravel or Hogging Existing Car Park Gross Area Existing Metal Railing to Remain = 498.0M2 Existing Metal Railing to Remain EXISTING CAR PARKING FACILITIES

L Col L Col

EXISTING CAR PARKING FACILITIES

L Col L Col

NORTH L Col

0 10 20 30 40 50 60 70 80 90 100 M Playground

SCALE BAR

Revision Date Scheme FOUR -Proposal for PLANNING Project

Norman Park Athletics Track New Athletics Training & Club House Facilities for - COPYRIGHT C 20016The HOCA Practice - C The COPYRIGHT of this drawing will at all times remain with the Architect The HOCA Practice Ltd. C

Ground Floor Layout Plan Drawing All rights reserved. The copyright of the contents of this drawing including all design content of this drawing and all other architect's drawings and documents read in conjunction with this drawing shall at all times remain with the architect.

Blackheath & Bromley Harriers Athletics Clubs No part of this drawing or any other drawing or documents read in conjunction with this architect's drawing may be reproduced or transmitted in any form or by any means, electronic, mechanical or photographic, by recording or any information storage retrieval Scale: Drawing No: Revision: Drawing Date: system or method now known or to be invented or adapted without the expressed permission obtained in writing from the Architect, The HOCA Practice 1:500@ A2 252.15.G- 203 25-03-2016

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
Enc. 1 for NORMAN PARK ATHLETICS TRACK: FUTURE PROPOSALSReport 1 pages DownloadRead as text
PDF
Enc. 2 for NORMAN PARK ATHLETICS TRACK: FUTURE PROPOSALSReport 1 pages Download
PDF
Enc. 3 for NORMAN PARK ATHLETICS TRACK: FUTURE PROPOSALSReport 4 pages Download
PDF
NORMAN PARK ATHLETICS TRACK: FUTURE PROPOSALSReport 8 pages Download

At this meeting

Whole meeting

On this subject at Bromley

Search all
  1. NORMAN PARK ATHLETICS TRACK - FUTURE PROPOSALSThis decision
  2. Norman parkApproved
  3. Norman parkApproved
  4. Norman Park UpdateNoted

More from Bromley Renewal, Recreation and Housing Policy Development and Scrutiny Committee

All decisions
MeetingDecisionOutcome
1 Sep 2026 Minutes of the renewal, recreation and housing pds committee meeting held on 9 june 2026That the minutes of the meeting held on 9 June 2026 be agreed and signed as a correct record. Agreed Open
1 Sep 2026 Matters outstanding and forward work programmethat the report be noted. Noted Open
1 Sep 2026 Housing, planning and regeneration portfolio plan update 2026/27 q1 updateThat progress on the actions associated with the Housing, Planning and Regeneration Portfolio Plan for Quarter 1 of t... Noted Open
1 Sep 2026 Budget monitoring reportThat the recommendations in the report be supported. Decided Open
1 Sep 2026 Capital programme monitoring - quarter 1 2026/27That the recommendations in the report be supported. Decided Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies