What was decided
The Council delegated authority to the Head of Planning and Economic Development to grant planning permission, subject to the report conditions. The application covers three buildings with nine employment starter units at Land Off Giltway, Giltbrook. [D][P1] Report P1
No part of the development may start until a detailed surface water drainage scheme has been submitted and approved in writing. [P12][P13] Report P12, P13
A Biodiversity Gain Plan must be submitted and approved before development begins. [P23][P24][P27] Report P23, P24, P27
Why
The drainage condition is intended to ensure sufficient surface water management under the Local Plan, Aligned Core Strategy and National Planning Policy Framework. [P20] Report P20
Biodiversity Net Gain of 10% is mandatory in England, with a plan required before development begins. [P22][P23][P24] Report P22, P23, P24
The other conditions protect nearby occupants, visual amenity and highway safety. [P34][P36][P38][P43][P47][P54] Report P34, P36, P38, P43, P47, P54
What happens next
The Head of Planning and Economic Development is to grant planning permission under the delegation, subject to all conditions. [D]
Before development begins, submit and obtain written approval of the surface water drainage scheme and Biodiversity Gain Plan. Foundation design, floodlighting, wheel washing and construction method details also require approval before commencement. [P12][P23][P24][P27][P33][P35][P37][P39][P40] Report P12, P23, P24, P27, P33, P35, P37, P39, P40
Before work above slab level, approve the landscaping and footpath details. Complete the biodiversity enhancements and provide the footpath and bound parking, turning and servicing areas before first occupation. [P44][P48][P49][P51][P53] Report P44, P48, P49, P51, P53
Options considered
- Chosen: Grant planning permission subject to the appendix conditions. This was the officer recommendation. [P1] Report P1
Implications
- Legal: The permission is not unconditional. All listed conditions must be complied with. [D][P1] Report P1
- Climate: For most rainfall events, runoff from the first 5mm of rainfall must not enter surface waters or piped drainage. [P14] Report P14
- Risk: The drainage design must limit all rainfall events up to the 100 year plus 40% critical storm to the discharge rates allowed for the developable area. [P17] Report P17
- Risk: Water from events exceeding the design standard must remain within the site boundary without flooding properties in the 100 year plus 40% storm. [P19] Report P19
- Other: A plan delivering 10% Biodiversity Net Gain must be approved before development begins. The gains must be secured for at least 30 years. [P22][P24][P30] Report P22, P24, P30
- Risk: Foundation design must include measures to minimise noise and vibration affecting surrounding occupiers. [P33] Report P33
- Legal: Construction is limited to 08:00 to 18:00 Monday to Friday and 08:00 to 13:00 on Saturdays, with no work on Sundays or Bank Holidays. Commercial use and deliveries are limited to 07.30 to 21.00 Monday to Saturday, with no activity on Sundays, Bank Holidays or other public holidays without written agreement. [P55][P64][P66] Report P55, P64, P66
- Other: The new footpath must be provided to the approved design before any commercial unit is occupied. [P48][P49] Report P48, P49
Who and where
- Nearby residents and occupiers Report P33, P34, P36
- Site users and commercial users Report P64, P66
- People using the new footpath Report P48, P49
- Surface waters and groundwater Report P14
- Local biodiversity and onsite habitats Report P29, P30
- Public road users Report P37, P38
- Construction workers and visitors Report P41
- Neighbouring premises affected by plant noise Report P60, P61
Timeline
- 24/09/26, 09/10/26 and 13/10/26: The location, unit, site plan, section, path level and elevation drawings were received. Report P6, P8, P10
- Before commencement: Drainage, foundation, floodlighting, wheel washing and construction method approvals are required. Report P12, P33, P35, P37, P39
- No development above slab level; prior to any construction above foundations level: Landscaping and biodiversity enhancement schemes must be approved. Report P44, P51
- Prior to the first occupation: Biodiversity enhancements must be completed, and the footpath and bound parking, turning and servicing areas provided. Report P49, P51, P53
- 1st March and 31st August inclusive: Shrub and scrub removal is restricted unless a nesting bird survey and protection scheme are approved. Report P57, P58
- 28 October 2026: The Planning Committee delegated authority to grant planning permission.
- Before the expiration of three years beginning with the date of this permission: Development must be commenced. Report P2
- No earlier than the day after planning permission has been granted: The Biodiversity Gain Plan may be submitted in writing. Report P27
Plain English for the jargon
- Sustainable Drainage Systems (SuDS): A drainage approach that slows and holds back runoff, protects water quality, and adds amenity and biodiversity value. [P14]
- Biodiversity Net Gain (BNG): A mandatory 10% gain in biodiversity value for development in England. [P22]
- Flood Risk Assessment (FRA): The approved assessment that must underpin the detailed surface water drainage scheme. [P12]
- Lead Local Flood Authority (LLFA): The authority that must be consulted when the drainage scheme is approved. [P12]
- Construction Method Statement and Construction Environmental Management plan: A construction plan covering access, parking, loading, storage, waste, dust and noise controls. [P39][P41]
- Employment starter units: The nine units proposed within three buildings under Use Class E(g)(iii). [D]