Cambridge City Council

09/0272/FUL Land at Clay Farm

Agreed Planning

Joint Development Control Committee - Cambridge Fringes agreed this item on Wednesday 14 July 2010. Below is the council's own wording, with the papers it was decided on.

Item10/35/JDC

Resolved

Agreed by 6 votes to 0 to: Approve in accordance with the following terms: · the revised Appendix F planning conditions as attached as appendix 1 but not including condition 5. · the prior approval of outline permission 07/0620/OUT · that additional planting be provided around the access road for properties 81 - 87 Long Road to mitigate against the development. If this has not be resolved prior to issuing the decision then a condition should be attached. · The approved plans and documents being amended to replace SK45 PL5 and CL100 PL5 with SK45 PL6 and CL100 PL6. Appendix 1: Amended Appendix F – Conditions (09/0272/FUL) 1. Time Limit The development hereby permitted shall be begun three years before the expiration date of this notice. Reason: In accordance with the requirements of section 51 of the Planning and Compulsory Purchase Act 2004. 2. Long Road Access No dwellings which form part of application 07/0620/OUT and are to be served from the Long Road access shall be occupied until the access has been fully laid out and implemented in accordance with the detailed plans that form this application. Reason: In order to safeguard highway safety and network capacity and to secure an appropriate means of access for users of the development (Cambridge Local Plan 2006 policies 3/7, 8/2 and 8/11). 3. Phasing Prior to commencement of development, apart from agreed enabling works previously approved in writing by the Local Planning Authority, a phasing plan which covers the spine road and balancing ponds, including timing of works to plantations, all structural/planting provisions and the provision of strategic foul and surface water features shall be submitted and approved in writing by the Local Planning Authority. The development shall thereafter be carried out in accordance with the approved plan. Reason: To clarify how the site is to be phased to ensure that major environmental mitigation can be provided at appropriate times and to ensure appropriate phasing of the plantation works. Highways 4. Tactile Paving Prior to commencement of construction of the spine road a scheme to show details of tactile paving provision along the Spine Road shall be submitted and approved in writing by the Local Planning Authority. The scheme shall meet with the current requirements for adoption. The scheme shall be carried out in accordance with the approved details. Reason: To ensure that there are certain key design principles which, when applied, make it easier and safer for visually impaired pedestrians to move around, therefore making the development accessible and safe for all. 5. AAR roundabout revised cycleway details Prior to the commencement of development a revised drawing of Plan SK45 PL5 shall be submitted showing an amendment to the proposed materials on the cycleway on the north western edge. Where the cycleway joins the raised table the use of keyblok should continue across to the edge of the footway. The development shall thereafter be carried out in accordance with the approved plan. Reason: In the interest of highway safety and to ensure that cyclists can join the highway without conflict with motor vehicles already on the carriageway. 6. Lighting Details Notwithstanding the lighting details submitted prior to the construction of any phase(s) a detailed lighting layout for that phase(s) shall be submitted to and approved in writing by the local planning authority. The strategy shall include the location and detail of the lighting columns and their cowling, including the cowling for the traffic lights on the Long Road junction and should be in accordance with the design code for the site. The scheme shall be implemented in accordance with approved details. Reason: In the interests of visual amenity and to ensure that the development is acceptable in terms of highway safety. (Cambridge Local Plan 2006 policies 3/11, 4/13 and 4/15). 7. Cycleway/footways not part of approval. Notwithstanding the details submitted and for clarification the following details are indicative only and do not form part of the application. The detailed construction drawing CA_112 PL4 and the compacted gravel cycleway/footway details on drawings SK 36 PL4, SK 38 PL4, SK41 PL4 and SK42 PL4. Reason: To ensure that the approval does not constrain or prevent the future adoption of the road and that the cycleway/footways comply with the details in the design code as required by the outline permission 07/0620/FUL. 8. Footway details Prior to the commencement of development, apart from agreed enabling works previously approved in writing by the Local Planning Authority, notwithstanding the information submitted, details of the footway materials shall be submitted and approved in writing by the Local Planning Authority. The development shall thereafter be carried out in accordance with the approved details. Reason: To ensure an acceptable visual appearance for the scheme and to maintain consistency with the design code as required by the outline permission 07/0620/FUL. 9. Cycle rack provision Prior to the opening of each phase of the spine road details of the location and style of cycle racks shall be submitted and approved in writing by the Local Planning Authority. The provision of cycle stands shall be in accordance with Cambridge City Councils Cycle Parking Guide for New Residential Developments and any approved design code for the site. The development shall be carried out in accordance with the approved scheme. Reason: To ensure the appropriate strategic provision for cyclists is made within the development in locations that are most likely to generate the need for cycle parking. Appropriately designed cycle parking allows for maximum use in terms of capacity and ease of use, therefore it needs to be appropriately provided for within a development where the ability to cycle has been a priority within the design of the development. 10. CGB Prior to the commencement of any development apart from the balancing ponds, full details of the design and construction methodology, in particular concerning the interface with the CGB junction, shall be submitted to and approved in writing by the Local Planning Authority in conjunction with the CGB Team at the County Council and thereafter implemented in accordance with such details as are so approved. Such approval will be in accordance with the reasonable requirements of CGB, whose agreement in writing shall be obtained by the applicant.” This agreement should be in accordance with the Code of Construction Practice for the particular development” Reason: CGB detailed designs in this location have not yet been produced. Any development adjacent to the Guided Busway needs to be conduced in accordance with the CGBs document entitled ‘Guidance for Developers’ Landscaping 11. Tree Pit Details Notwithstanding the submitted tree pit details, prior to the construction of the Spine Road a tree pit scheme including details for all street trees that are adjacent to or which abut the highway, shall be submitted to and approved in writing by the Local Planning Authority. The scheme shall show how a variety of tree pits shall be provided depending on the level of fill and also the potential for any trenches. The proposed development shall be carried out in accordance with the approved scheme. Reason: To ensure that such trees prosper and that the highway is not damaged during their growth ( Cambridge Local Plan policies 3/7, 3/11, 4/4). 12. Compliance with management plans The development hereby permitted shall be strictly in accordance with the site wide ecological conservation management plan submitted in relation to application 07/0620/OUT and the Primary Route Application – Ecological Conservation Management Plan March 2009 and the Primary Route Application – Ecological Conservation Management Plan Addendum November 2009 unless minor amendments are otherwise agreed in writing by the Local Planning Authority. Reason: To ensure the ecological mitigation measures proposed which make the development acceptable are secured. 13. Compliance with management plans The development hereby permitted shall be strictly in accordance with the Primary Route Application – Landscape Maintenance and Management Specification March 2009 unless minor amendments are otherwise agreed in writing by the Local Planning Authority. Reason: To ensure appropriate management of the landscaping features along the spine road. 14. Compliance with Management Plans The development hereby permitted shall be strictly in accordance with the Primary Route Application – Plantation Management and Landscaping Proposals March 2009 and the Addendum to Plantation Management and Landscaping Proposals November 2009 unless minor amendments are otherwise agreed in writing by the Local Planning Authority. Reason: To ensure appropriate management of the plantations. 15. Landscaping Replacement Any trees or plants provided as part of the landscaping scheme which, within a period of 5 years of planting date, die, are removed or become seriously damaged or diseased, shall be replaced in the next planting season with others of similar size and species as those originally planted, unless the Local Planning Authority gives written consent to any variation. Reason: In the interests of the amenity of future residents of Clay Farm and other likely users of the green corridor and open landscaped spaces and to safeguard the setting and special character of Cambridge, the retained Green belt and surrounding open countryside (Cambridge Local Plan 2006 policies 3/2, 3/7, 3/11, 3/12, 4/3, 4/4, 9/3 and 9/5). 16. Protective Fencing No development within each phase of the site shall take place until such time as fencing for the protection of any retained tree within, adjacent to, or which overhangs the development site, has been fully erected in accordance with the approved plans and particulars. The fencing shall be retained intact for the full duration of the development until all equipment, materials and surplus materials have been removed from the site. Nothing shall be stored or placed in any fenced area in accordance with this condition and the ground levels within those areas shall not be altered, nor shall any excavations be made without the written consent of the Local Planning Authority. Reason: In the interests of visual amenity and safeguarding trees that are worthy of retention (Cambridge Local Plan 2006 policies 4/3 and 4/4). 17. Excavation Trenches No development within each phase of the spine road shall take place until such time as full details of the position and proposed depth of excavation trenches for all services (including cables, pipes, surface water drains, foul water drains and public utilities) and their means of installation which pass underneath the canopy of any retained tree within, adjacent to, or which overhangs the development site, have been submitted to and approved in writing by the Local Planning Authority. Development shall be carried out in accordance with the approved details. Reason: In the interests of visual amenity and safeguarding trees that are worthy of retention (Cambridge Local Plan 2006 policies 4/3 and 4/4). 18. Permitted Development Restrictions Notwithstanding the provisions of Schedule 2, Part 2, Class A of the Town and Country Planning (General Permitted Development) Order 1995 (or any Order revoking and re-enacting that order with or without modification) the erection, construction or alteration of a gate, fence, wall or other means of enclosure shall not be allowed within the red line area around the balancing ponds as shown on the site location plan . Reason: To safeguard visual amenity (Cambridge Local Plan 2006 policies 3/4, 3/11 and 3/14). 19. SCEMP Prior to the commencement of development, a Strategic Construction Environmental Management Plan (SCEMP) shall be submitted to and approved in writing by the Local Planning Authority. The SCEMP shall accord with and give effect to the principles for such a Statement proposed in the Environmental Statement submitted with the outline application 07/0620/OUT and shall include the consideration of the following aspects of construction: a) Indicative site wide construction and phasing programme. b) Construction hours and delivery times for construction purposes. c) Outline Waste Management Plan (OWMP), providing a statement of site specific reuse and recycling objectives with appropriate targets, compliance training for sub-contractors, construction code of conduct together with regular auditing and reporting on target achievements and quantities disposed, ensuring that such materials are only consigned to authorised treatment/recovery or disposal facilities, including consideration of participation in a Materials Re-use and Recycling Forum covering the Cambridge Southern Fringe sites. d) Noise method, monitoring and recording statements in accordance with the provisions of BS 5228 (1997). e) Maximum noise mitigation levels for construction equipment, plant and vehicles. f) Vibration method, monitoring and recording statements in accordance with the provisions of BS 5228 (1997). g) Maximum vibration levels. h) Procedures for interference with public highways, including permanent and temporary realignment, diversions and road closures. i) Membership of the Considerate Contractors Scheme. Reason: To ensure the environmental impact of the construction of the development is adequately mitigated and in the interests of the amenity of nearby residents/occupiers (Cambridge Local Plan 2006 policy 4/13). 20. DCMS Prior to commencement of development of this application, a Detailed Construction Method Statement (DCMS) shall be submitted to and approved in writing by the Local Planning Authority. The DCMS shall demonstrate how the construction of the application accords with the details of the SCEMP submitted in relation to condition 19, except criteria E, and shall include the consideration of the following aspects of construction: a) Location of contractor offices and parking arrangements, site storage areas/compounds for building materials, plant and equipment. b) Screening and hoarding details. c) Contractor access arrangements for vehicles, plant and personnel including the location of construction traffic routes to, from and within the site, details of their signing, monitoring and enforcement measures. d) Soil management and storage details. e) Dust management and wheel washing measures. f) Site lighting. g) Drainage control measures including the use of settling tanks, oil interceptors and bunds. h) Access and protection arrangements around the site for pedestrians, cyclists and other road users, including external safety and information signing and notices. i) Liaison, consultation and publicity arrangements including dedicated points of contact and complaints procedures. j) Consideration of sensitive receptors. k) Prior notice and agreement procedures for works outside agreed limits. Thereafter the development shall be undertaken in accordance with the agreed details. Reason: To ensure the environmental impact of the construction of the development is adequately mitigated and in the interests of the amenity (Cambridge Local Plan 2006 policy 4/13). 21. Archaeology No development shall commence in the areas identified for mitigation in the Archaeological Specification for Excavation at Clay Farm (Scott Wilson 2008) submitted in relation to 07/0620/OUT as Sites 1, 2, 3 & 4 until fieldwork has been completed in those areas in accordance with the Project Design (Oxford Archaeology 2008). Reason: To ensure that an appropriate archaeological investigation of the site has been implemented and recorded (Cambridge Local Plan 2006 policy 4/9). 22. Ground Water Prior to the commencement of development, apart from enabling works agreed in writing by the Local Planning Authority, a hydrological/hydrogeological report shall be submitted to and approved in writing by the Local Planning Authority. The report shall provide advice as to whether the development of the site will have any impact upon the ground water spring flow of Nine Wells Local Nature Reserve. Should the report demonstrate any significant detrimental impact on the spring flow, it shall also propose appropriate mitigation to be carried out in accordance with a proposed phased programme of implementation. Any mitigation shall be carried out in accordance with the approved report and details of timing. Reason: To safeguard the ground water spring flow of Nine Wells Local Nature Reserve (Cambridge Local Plan 2006 policy 4/6). 23. Surface Water Drainage The surface water disposal for the Spine Road and associated areas shall be constructed in line with drawing no. CL-18 Rev PL1 Overall Surface Water Plan and the Surface Water Drainage Strategy dated March 2009 unless otherwise agreed in writing by the Local Planning Authority. Reason: To ensure a satisfactory method of surface water drainage and to prevent the increased risk of flooding to third parties.
Word for word from the decision Cambridge published for this meeting. Source: democracy.cambridge.gov.uk

Follow this further

Built from Cambridge's papers

Papers for this item

Kept in our archive, download once signed in

No papers were published with this item. The decision above is the council's full record of it.

At this meeting

Whole meeting

Who was there

14 of 16 attended
IN
Councillor Ian Nimmo-SmithChair, present
CC
County Councillor Tony OrgeeVice-Chair, apologies
ML
Councillor Mrs Liz HeazellCommittee Member, present
CN
Councillor Charles NightingaleCommittee Member, present
CB
Councillor Clare BlairCommittee Member, present
RD
Councillor Robert DrydenCommittee Member, present
CS
Councillor Catherine SmartCommittee Member, present
TW
Councillor Tim WardCommittee Member, present
CC
County Councillor Nichola HarrisonCommittee Member, present
CC
County Councillor Gail KenneyCommittee Member, present
DD
Councillor Dr David BardCommittee Member, present
MW
Councillor Margaret WrightCommittee Member, present

All 16 on the meeting page

On this subject at Cambridge

Search all
  1. 09/0272/FUL Land at Clay FarmThis decision
  2. 25/02831/FUL Land at Bateman StreetDecided
  3. 25/02831/FUL Land at Bateman Street, CambridgeDeferred
  4. 25/03078/FUL Land Adjacent to 49 New SquareApproved
  5. 25/03078/FUL Land Adjacent to 49 New SquareDeferred
  6. 23/04380/FUL Land At Ditton WalkRefused

More from Cambridge Joint Development Control Committee - Cambridge Fringes

All decisions
MeetingDecisionOutcome
27 May 2020 Virtual Council Meetings(i) To adopt the conventions for virtual meetings as adopted and used by Cambridge City Council the administering aut... Approved Open
27 May 2020 18/0481/OUT & S/1231/18/OL - Land north of Cherry HintonAgreed careful consideration was required when looking at the detailed design to ensure that play spaces were usable ... Agreed Open
20 Nov 2019 Planning Application 19/1134/FUL - 9 Whitelocks DriveResolved (by 9 votes to 0) to grant the application for planning permission in accordance with the Officer recommenda... Decided Open
20 Nov 2019 18/0181/OUT - Land North of Cherry Hinton, Coldhams Lane (Transport)Agreed that cycle routes in the Coldham’s Lane area were currently problematic due to the railway bridges and stated ... Agreed Open
18 Sep 2019 S/0064/19/CC and S/0064/19/CM - Land north of Newmarket Road, CambridgeResolved (by 11 votes to 1) to refuse the application contrary to the officer recommendations for the following reaso... Refused Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies