CANTERBURY JOINT TRANSPORTATION BOARD 17 MARCH 2009
Subject: Highway Works Programme 2008/09
Director/Head of Service: Director of Kent Highway Services
Decision Issues: These matters are within the authority of the Board
Decision: Non-key
Ward/Division: All
Summary: This report updates Members on the identified schemes approved for construction in 2008/09.
To Recommend: This report is for Members’ information.
Classification: THIS REPORT IS OPEN TO THE PUBLIC Introduction
1. This report gives members the current position on the identified schemes that were approved for construction in 2008/09.
Road Surface Treatments
High Friction Surfacing - see Appendix A1
Highway Maintenance Schemes
Footway Schemes - see Appendix B1 Drainage/Other Schemes - see Appendix B2 Street Lighting Schemes - see Appendix B3
Local Transport Plan Budget 2008/09
Local Transport Plan Funded Schemes - see Appendix C1 Public Rights of Way (LTP Funded) – see Appendix C2
Other Works
Bridge Works - see Appendix D1 Developer Funded Works - see Appendix D2 Major Capital Projects - see Appendix D3
Option available
3. This report is for Members’ information.
Conclusion
4. This report is for Members’ information. Contact Officers: Carol Valentine KHS 0845 8247800 Gary Peak KHS 0845 8247800 Toby Howe KHS 0845 8247800 Richard Moore CCC 01227 862419
Appendices A to D – Progress Reports APPENDIX A
APPENDIX A – ROAD SURFACE TREATMENTS
APPENDIX A1 – HIGH FRICTION SURFACING
Location Description Status Radfall Road Chestfield Bend to Gypsy Corner Programmed March 09 J/W Milstrood Road. Thanet Way Whitstable Northbound approach to Programmed March 09 Roundabout (inc HFS) APPENDIX B
APPENDIX B – HIGHWAY MAINTENANCE SCHEMES
APPENDIX B1 – FOOTWAY SCHEMES
Location Description Budget Status Sturry Road – Reed Avenue Canterbury £70,590 Deferred 2009/10 Tennyson Avenue Castle Street Canterbury Rosemary Lane – Watling £25,000 Programmed March (Towards 2010 funding) Street Nelson Road Whitstable ( Full Length £35,280 Programmed March Towards 2010 funding) Northgate Canterbury 2010 Duck Lane - Sainsburys £89,000 Programmed March St. George’s Place Canterbury (Towards 2010 Subway – Traffic Signals £52,000 Programmed March funding) St. Margaret’s Street High Street – Watling Canterbury ( Towards 2010 £41,250 Programmed March Street funding)
APPENDIX B2 – DRAINAGE SCHEMES
Location Description Budget Status Currently dealing with reactive drainage issues.
APPENDIX B3 – STREET LIGHTING SCHEMES
All of the street lighting column replacement schemes that were reported to the November meeting of the Board have been completed but are still awaiting edf connections. APPENDIX C
APPENDIX C – TRANSPORTATION, PROW & SAFETY SCHEMES
APPENDIX C1 – LOCAL TRANSPORT PLAN SCHEMES
Location Description Budget Status B2205 High Street/ Beach Extend footway to remove £13,200 Work commenced but Street, Herne Bay parking and rationalise shallow gas mains found. signs Scheme redesign in progress. Bridge Hill, Bridge Programmed to commence Interactive speed sign £5,000 December 08 Real Time Passenger Detailed design work in Information on Canterbury £80,000 progress. Triangle route Variable Message Signs Canterbury Urban Traffic and Urban Traffic Control £400,000 Design work in progress Management coordination Design work complete. Shalloak Road, Broad Oak CRM lining and road studs £10,000 Awaiting programme start date Herne Bay Road,Swalecliffe Pelican Crossing £97,000 Works to be programmed - adjacent Kemp Road Various locations in Sites being identified and Cycle Parking £5,000 Canterbury city centre consulted upon.
APPENDIX C2 –PUBLIC RIGHTS OF WAY (LTP Funded)
Location Description Budget Status CW52, (adjacent to railway Work programmed March line north of Joy Lane) Surface Improvements £29,000 09, subject to no objections Whitstable to TRO order APPENDIX D
APPENDIX D – OTHER SCHEMES
APPENDIX D1 – BRIDGE WORKS
Location Description Status Strengthen or reconstruct due to failed The Street, Barham Deferred to 2009/10 assessment.
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
PDF |
Works Progress Update 2008/9Report | 98 KB | DownloadRead as text |
Follow Joint Transportation Board at Canterbury and we tell you when its next papers are published, before the meeting rather than after it.
| Meeting | Decision | Outcome | |
|---|---|---|---|
| 24 Mar 2026 | Highway Works ProgrammeIt was agreed an update would be provided at the next meeting. The white lining in the report only referred to major ... | Agreed | Open |
| 24 Mar 2026 | Update on Richmond Street and Dolphin Street One WayIt was agreed that the Chair and Vice Chair would write to the KCC Cabinet member for transport to conduct a full rev... | Agreed | Open |
| 21 Oct 2025 | Highway Works ProgrammeIt was agreed that this would be raised with KCC colleagues to add to the list of works. Some of the street lighting ... | Agreed | Open |
| 18 Jun 2024 | Active Travel UpdateIt was agreed to include this in AOB (JTB10) to be picked up by relevant officers. The report was NOTED. | Agreed | Open |
| 19 Mar 2024 | Annual Parking ReviewAGREED by general assent. RECOMMENDED (to the KCC Cabinet Member for Highways and Transport): a. To action the follow... | Agreed | Open |
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Keeps you signed in and runs your free-paper allowance. Always on.
Counts visits and which pages are used. First-party only, no advertising, never shared.