Resolved
RESOLVED – The report be noted.
Joint Transportation Board noted this item on Tuesday 17 March 2009. Below is the council's own wording, with the papers it was decided on.
Resolved
RESOLVED – The report be noted.
CANTERBURY JOINT TRANSPORTATION BOARD 17 MARCH 2009
Subject: Integrated Transport Programme 2009/10
Director/Head of Service: KCC Head of Transport and Development
Decision Issues: These matters are within the authority of the Kent County Council
Decision: Non - key
CCC Ward/KCC Division: All
Summary: This report introduces the Integrated Transport programme for 2009/10 for the Canterbury District
To Note: This report is for Members’ information
Classification: THIS REPORT IS OPEN TO THE PUBLIC
SUPPORTING INFORMATION Introduction
1. The report detailing the county wide Integrated Transport programme for 2009/10, which was presented to the Highways Advisory Board on 3 March 2009, is attached as Appendix A. The programme for the Canterbury district is shown in Appendix 1 of that Report. Any changes that the Highways Advisory Board recommends that are different to the report will be reported verbally to this Board on the night.
Contact Officer: Ruth Goudie 08458 247 800
Attachments:
Appendix A APPENDIX A
Item XX/ Decision No (as appropriate) ___________________________________________________________________________
By: Head of Transport & Development Planning
To: Highways Advisory Board - 3 March 2009
Subject: The Transportation and Safety Package Programme 2009/10
Classification: Unrestricted
___________________________________________________________________________
Summary: This report is to inform members of the proposed Transportation and Safety Package Programme for 2009/10 to be recommended for approval by the Cabinet Member for Environment, Highways and Waste. ___________________________________________________________________________
1. Introduction and Policy Framework
(1). Kent County Council’s (KCC) local transport funding for 2009/10 was determined by the Department for Transport (DfT) in November 2007 as part of its assessment and settlement announcement regarding Kent’s transport strategy, the Local Transport Plan (LTP). This funding has been provided to support local transport schemes that deliver the LTP, which itself sets out the County Council’s approach to achieving a number of key transport objectives, including:
• Improve access to key services by sustainable modes of transport; • Tackle the occurrence of peak hour congestion, particularly in larger urban areas; • Improve road safety by reducing the number of people killed or seriously injured on Kent’s roads; • Improve local air quality, particularly in designated Air Quality Management Areas (AQMAs).
(2). Kent’s LTP funding for 2009/10 includes a capital allocation of £14.752M, which consists of borrowing approvals and grant and is specifically for the implementation of Integrated Transport (IT) schemes. Of the £14.752M, £2.600M will be used to fund detailed design and supervision of construction of 2009/10 schemes as well as forward design of 2010/11 schemes, and £2.200M is required to complete the 2008/09 programme. These include schemes which have been deferred in order to provide additional funding for maintenance in 2008/09. This results in a budget of £9.952M for implementation of new schemes. The allocation for new schemes in 2008/09 was £9.65M. APPENDIX A
(3). This report provides details of the 69 schemes that make up the proposed Transportation and Safety Package Programme for 2009/10 together with a brief summary of key elements of the programme. The schemes proposed for 2009/10 are shown at Appendix 1.
2. Scheme Prioritisation
(1). The proposed Transportation and Safety Package Programme for 2009/10 has been devised using Kent’s Scheme Prioritisation Methodology, PIPKIN. A report outlining the principles and a proposal to implement PIPKIN was presented to the (HAB) in July 2006, and was approved by the Cabinet Member for Environment, Highways and Waste on the strength of the recommendations of this Board.
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
PDF |
Integrated Transport Programme 2009/10Report | 147 KB | DownloadRead as text |
Follow Joint Transportation Board at Canterbury and we tell you when its next papers are published, before the meeting rather than after it.
| Meeting | Decision | Outcome | |
|---|---|---|---|
| 24 Mar 2026 | Highway Works ProgrammeIt was agreed an update would be provided at the next meeting. The white lining in the report only referred to major ... | Agreed | Open |
| 24 Mar 2026 | Update on Richmond Street and Dolphin Street One WayIt was agreed that the Chair and Vice Chair would write to the KCC Cabinet member for transport to conduct a full rev... | Agreed | Open |
| 21 Oct 2025 | Highway Works ProgrammeIt was agreed that this would be raised with KCC colleagues to add to the list of works. Some of the street lighting ... | Agreed | Open |
| 18 Jun 2024 | Active Travel UpdateIt was agreed to include this in AOB (JTB10) to be picked up by relevant officers. The report was NOTED. | Agreed | Open |
| 19 Mar 2024 | Annual Parking ReviewAGREED by general assent. RECOMMENDED (to the KCC Cabinet Member for Highways and Transport): a. To action the follow... | Agreed | Open |
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Keeps you signed in and runs your free-paper allowance. Always on.
Counts visits and which pages are used. First-party only, no advertising, never shared.