Joint Transportation Board, Tuesday 17 March 2009 at 7.00pm

A28/A2 On-Slip Road, Canterbury

Noted Committee 2 papers

Joint Transportation Board noted this item on Tuesday 17 March 2009. Below is the council's own wording, with the papers it was decided on.

Item78

Resolved

RESOLVED – The report be noted.
Word for word from the decision Canterbury published for this meeting. Source: democracy.canterbury.gov.uk

Follow this further

Built from Canterbury's papers

What the report saysPro

Report to Joint Transportation Board

Background

1. Improvement to the three A2 junctions close to Canterbury is part of a package of sustainable transport measures that are set out in the Canterbury Transport Action Plan (approved by Kent County Council in 2004 following extensive local consultation with the public and stakeholders), and supported by the Local Transport Plan for Kent 2006-11.

2. A report was presented the Highways Advisory Board on 14 November 2006. The report set out the background for the overall proposals and was approved by the Cabinet Member for Regeneration and Supporting Independence for the purpose of consulting, seeking the necessary consents and arranging for the making of all necessary Orders to construct the On-Slip at Thanington, Canterbury.

3. The above report noted that, until ministerial approval had been obtained to the overall project, any work carried out on this scheme is at the County Council’s risk. A subsequent letter to Julian Brazier MP from the Parliamentary Under Secretary of State, dated 18 December 2007, confirmed that the Wincheap on slip proposals could go ahead. However, this is subject to the scheme being technically sound and there being no financial support required from the Highways Agency

Scheme Progress

4. Surveys to assist with the detailed design and scheme mitigation measures e.g. topographical, ecological, geotechnical, drainage and traffic surveys have been completed. An archaeological scoping survey has also been carried out. 5. The surveys help to determine a realistic programme for the scheme, especially where mitigation measures are necessary. For example there will be a requirement to capture and relocate reptiles to another safe site nearby, and this work is seasonal.

6. The design work for the scheme is well advanced and this is outlined in Figure 1 attached, and shown on drawing number B0409100 / 018 on display 7. An important part of the scheme involves consultation with various bodies as well as the general public. There has already been significant discussion with Canterbury City Council, InterRoute and the Highways Agency, and this is ongoing. Additionally there are ongoing discussions with many more stakeholders such as the public utility and bus companies.

8. It is now an appropriate time to discuss the proposals with the general public, and a public exhibition is to be held at the Thanington Neighbourhood Resource Centre on Saturday 14 March, between 10 am and 1 pm, and on Tuesday 17 March between 6:30 pm and 8:30 pm. Representatives of Kent Highway Services will be available to explain the proposals and answer questions.

9. One area of concern will undoubtedly be the removal of some on-street parking. This has been unavoidable and measures have been taken as part of the scheme design to mitigate some of the loss by providing some new parking, even though there is no obligation on the Highway Authority to provide parking.

10. The proposed scheme requires planning permission and work is well underway to prepare an Environmental Statement. If necessary, issues raised as part of the public consultation exercise may be considered and fed into the planning proposals as appropriate. It is hoped that a planning application will be submitted in mid-April 2009.

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
A28/A2 On-Slip Road, CanterburyReport 81 KB DownloadRead as text
PDF
CJTB 17 Mar 09 FIG 1Report 431 KB Download

More from Canterbury Joint Transportation Board

All decisions
MeetingDecisionOutcome
24 Mar 2026 Highway Works ProgrammeIt was agreed an update would be provided at the next meeting. The white lining in the report only referred to major ... Agreed Open
24 Mar 2026 Update on Richmond Street and Dolphin Street One WayIt was agreed that the Chair and Vice Chair would write to the KCC Cabinet member for transport to conduct a full rev... Agreed Open
21 Oct 2025 Highway Works ProgrammeIt was agreed that this would be raised with KCC colleagues to add to the list of works. Some of the street lighting ... Agreed Open
18 Jun 2024 Active Travel UpdateIt was agreed to include this in AOB (JTB10) to be picked up by relevant officers. The report was NOTED. Agreed Open
19 Mar 2024 Annual Parking ReviewAGREED by general assent. RECOMMENDED (to the KCC Cabinet Member for Highways and Transport): a. To action the follow... Agreed Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies