13/3455M-

Approved Planning 1 paper

Strategic Planning Board approved this item on Tuesday 18 March 2014. Below is the council's own wording, with the papers it was decided on.

Item188

Resolved

RESOLVED That for the reasons set out in the report and in the oral update to Board the application referred to the Secretary of State for approval subject to the following the conditions:- Plans, materials and commencement 1. Development to commence within 3 years. 2. Development to be in accordance with the approved plans and documents 3. Development in accordance with Environmental Statement. 4. Details of materials for structures, lighting columns and fencing. 5. Further details of bridges, structures, underpasses, bridge wing walls, abutments and crossings. 6. Full construction details of proposed pedestrian and cycleway, footpaths and bridleways. 7. Phasing plan for the construction of the development to be submitted and agreed. Mitigation (highways and air quality) 8.Prior to the new sections of the scheme hereby approved being brought into use a scheme detailing a package of mitigation measures (intended to restrain, alleviate and manage traffic flow increases at locations identified and to levels indicated through enhanced mitigation as shown in figures 9.6 and 9.7 in the submitted Transport Assessment) has been submitted to and agreed in writing with the Local Planning Authority. Such scheme shall include details of and a methodology and timetable for delivery of the measures, a programme for review, surveys and monitoring of the impact of the measures and if required reappraisal of an addition to the agreed package of measures. The new sections of road shall not be brought into use until the measures have been implemented in accordance with the approved details unless the prior written consent of the Local Planning Authority has been obtained. ( note : this includes mitigation measures for, but not limited to, Disley Village Centre, the A6 corridor, Clifford Road in Poynton and B5358 Station Road / Dean Road Handforth . Where this condition requires approval or consent by the Local Planning Authority those matters shall be referred to the Council’s Strategic Planning Board ) corridor , and B5358 Station Road / Dean Road Handforth ) 9.Prior to commencement of development details of a scheme to assess and mitigate the impacts of the development on the northbound merge to the A34 from Long Marl Drive shall be submitted to the LPA for approval. 10 .Within 18 months of the new sections of road hereby approved being brought into use a package of complimentary measures shall have been implemented in a scheme which has previously been submitted ... view the full minutes text for item 188.
Word for word from the decision Cheshire East published for this meeting. Source: moderngov.cheshireeast.gov.uk

Follow this further

Built from Cheshire East's papers

What the report saysPro

Report to Strategic Planning Board

Application No: 13/3455M

Location: Land to the south of Stockport, adjacent to and between the A6 (Buxton Road) and land to the east of the Styal railway line, north of Styal Golf Course.

Proposal: Construction of the A6 to Manchester Airport Relief Road (whole route), incorporating: • Seven new road junctions; • Modification to four existing road junctions; • Four new rail bridge crossings; • Three new public rights of way/accommodation bridges; • Four new road bridges; • A pedestrian & cycle route; • Six balancing ponds; and • Associated landscaping, lighting and infrastructure works.

Within Cheshire East: • modifications to one existing road junction; • two new public rights of way/accommodation bridges; • one new road bridge; • a pedestrian and cycle route for the whole length of the relief road, including retrofitting it to the existing section of the A555; • one balancing pond for drainage purposes; and • associated landscaping, lighting, engineering and infrastructure works.

Applicant: Stockport Metropolitan Borough Council, Cheshire East Borough Council & Manchester City Council

Expiry Date: 24/02/2014 EXECUTIVE SUMMARY

Planning permission is sought to construct a new dual carriageway from the A6 near to Hazel Grove (south east Stockport) to Manchester Airport and the link road to the M56. The application spans three Authority boundaries, namely Stockport MBC, Cheshire East Council and Manchester City Council, and as such, a detailed planning application has been submitted to the three authorities for determination of the scheme which falls within each of the Authority boundaries.

This report covers in detail the proposed scheme which falls within Cheshire East. It is considered important that all decision makers are fully furnished with the whole proposed scheme and relevant facts pertaining to it, the report therefore also covers details outside of the Cheshire East boundary. Each local planning authority is responsible for the recommendation and determination of the scheme within their Authorities jurisdiction.

The report sets out that the proposal is inappropriate development in the Green Belt, for which there is a presumption against. It is also concluded that additional harm will result from the proposal in terms of landscape and visual impact, noise, localised air quality and traffic congestion, ecology and loss of agricultural land.

However, subject to an enhanced package of mitigation and conditions set out in the report, the harmful impacts of the development can be reduced to acceptable levels.

The report concludes that the proposal will result in significant benefits through the provision of much needed strategic transport infrastructure. The improved connectivity and reduction in traffic congestion will bring significant sub-regional economic, social and environmental advantages. Overall it is concluded that very special circumstances exist to allow the development and that the proposal is in general conformity with Development Plan policy and the National Planning Policy Framework.

It is recommended that planning permission is granted subject to conditions.

REASON FOR REPORT

The application is to be determined by Strategic Planning Board as set out in the Council’s constitution and Scheme of Delegation. The proposal is also a departure from the Development Plan.

Members are advised that following the recommendation of the Strategic Planning Board the scheme will need to be referred to the Secretary of State under The Town and Country Planning (Consultation) (England) Direction 2009. DETAILS OF THE PROPOSAL

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
13/3455M- Construction of the A6 to Manchester Airport Relief Road (whole route), incorporating: " Seven new road junctions; " Modification to four existing road junctions; " Four new rail bridge crossings; " Three new public rights of way/accommodation bridges; " Four new road bridges; " A pedestriMinutes 890 KB DownloadRead as text

At this meeting

Whole meeting

More from Cheshire East Strategic Planning Board

All decisions
MeetingDecisionOutcome
16 Sep 2026 Minutes of the Previous MeetingThat the minutes of the meeting held on 22 July 2026 be approved as a correct record and signed by the Chair. Approved Open
16 Sep 2026 25/1573/FUL - Full planning application for a residential development including associated access, infrastructure and landscaping. Land off Cumber Lane, WilmslowThat application 25/1573/FUL be APPROVED subject to the following conditions and S106 Agreement; Conditions 3-year ti... Approved Open
16 Sep 2026 25/2071/FUL - Full planning application for a residential development and the provision of associated access and infrastructure works including roads, drainage infrastructure, car parking, public open space and landscaping. Land at Dean Row Road, WilmslowThat application 25/2071/FUL be APPROVED subject to the following conditions and S106 Agreement; Conditions 2-year ti... Approved Open
16 Sep 2026 National Scheme of DelegationThat the Strategic Planning Board Noted the changes introduced by the for Planning Functions that will be implemented... Noted Open
22 Jul 2026 Minutes of the Previous MeetingThat the minutes of the meetings held on 27 May 2026 and 9 June 2026 be approved as correct records. Approved Open