That, for the reasons set out in the report, the application be REFUSED for the following reasons: The proposal is considered to represent inappropriate development in the Green Belt, which reduces openness and conflicts with the purposes of the Green Belt through encroachment into the countryside. Permanent and temporary uses are not distinguished in the exceptions to inappropriate development in the Green Belt, in national or local planning policy. No Very Special Circumstances have been advanced that outweigh the identified harm to the Green Belt. The development is therefore not considered to represent sustainable development and is contrary to policies MP1 and PG3 of the CELPS, and PG10 of the SADPD and paragraphs 137, 138, 147 – 150 of the NPPF. In the event of any changes being needed to the wording of the Committee’s decision (such as to delete, vary or add Conditions and/or Informatives or reasons for approval prior to the decision being issued, the Head of Planning has delegated authority to do so in consultation with the Chairman of the Northern Planning Committee, provided that the changes do not exceed the substantive nature of the Committee’s decision.
Word for word from the decision Cheshire East published for this meeting.Source: moderngov.cheshireeast.gov.uk
The proposed development description is ‘Addition of 2 bedroom modular lodge’.
The proposals would see the erection of a two-bedroom lodge of C3 use class within the Green Belt, not within an infill village. Whilst proposed on a temporary basis to facilitate extensions and alterations to Longshott Farm dwelling located to the east within land in the same ownership, the proposals do not comply with exceptional forms of development within a Green Belt location and as No Very Special Circumstances are presented it is considered that the proposals are contrary to Green Belt policies, the principle of development is therefore not accepted.
No issues are raised as to the design, siting and scale of the development with regards to relevant design, heritage, amenity, pollution, water management, highways safety and parking.
It is therefore recommended that the application is refused approval.
Summary Recommendation
Refuse approval
REASON FOR REPORT
This application has been called-in to Committee by Councillor Asquith for the following reasons. “The development is in the Green Belt without any exceptional circumstances.”
DESCRIPTION OF SITE AND CONTEXT
The site is located within the Green Belt. The site is presently an undeveloped field. There is a line of trees/hedgerows to both Pepper Street which screens the site from public view rather effectively and the eastern boundary of the site shared with a neighbour. Elsewhere within the site edged blue is the associated dwelling at Longshott Farm, which is a detached, two storey farmhouse located to the rear of Snelson Methodist Church off Pepper Street. The farmhouse is whitewashed with black detailing and slate roof and white framed fenestration. There is also a two-storey detached barn on site finished in the same architectural style.
DETAILS OF PROPOSAL
The proposed development description is ‘Addition of 2-bedroom modular lodge’. The proposed lodge will be detached and single storey and will have 2no. bedrooms, shower room and open plan kitchen/diner/lounge. It is proposed that the lodge will be erected on a temporary basis, indicated within submission documents for a period of 1-2 years, for use by the applicant and their family to live in whilst renovation work to the dwelling at Longshott Farm is undertaken. It is stated that once the renovation work has been undertaken and the lodge is redundant it will be removed from the site and the land returned to its former state. It is proposed that an extended area of hardstanding around the lodge will be erected into the field leading on from the existing driveway. It is proposed that the lodge will be positioned on concrete block footings with the hardstanding proposed extending underneath that. The building is proposed in black timber cladding to external walls with single ply membrane roof. There are 2no. proposed parking spaces and a bin storage area. It is proposed that the site surface water will be handled by soakaway and that foul drainage will be handled by a feed into the existing septic tank highlighted on drawings to the east of the site, which is said to feed into existing land drains to the south of the site.
RELEVANT PLANNING HISTORY
22/1165M – Certificate of proposed lawfulness for a single storey side extension and a two- storey rear extension – positive certificate – 28th June 2022
21/4094M – Proposed outbuilding – approved with conditions – 3rd March 2022
21/4107M - Conversion of disused barn within curtilage to create a three-bedroom dwelling – awaiting determination
21/4100M - Proposed two storey rear extension and single storey side extension, with refurbishment of existing outbuilding, roof to be raised. – withdrawn – 25th August 2022
RELEVANT POLICIES/LEGISLATION
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.