Resolved
For the reasons set out in the report, the application be APPROVED as recommended, subject to the following conditions: 1. 3 year time limit 2. Development in accordance with the approved plans 3. Details of proposed materials 4. Surface water drainage design 5. Electric Vehicle Charging provision 6. Landscaping scheme submission to include more species diversity in the tree planting scheme 7. Landscaping implementation 8. Hours of operation of driving range and flood lights 9. Angling/cowling of flood lights 10. Detailed specification, including depths, contours and side gradients of the proposed pond 11. Implementation of reasonable avoidance measures detailed within Appendix 7 of the Ecological Impact Assessment (eyebright ecology, October 2022) 12. A habitat creation method statement and a 30 year habitat management plan for the newly created habitats on site 13. Breeding birds to restrict development during nesting periods 14. Prior to development above foundation level, details of the proposed lighting scheme shall be submitted to and approved in writing by the Local Planning Authority. The scheme should consider both illuminance (lux) and luminance (candelas/m²). It should include dark areas and avoid light spill upon bat roost features, bat commuting and foraging habitat (boundary hedgerows, trees, watercourses etc.) aiming for a maximum of 1lux light spill on those features. The scheme should also include a modelled lux plan, and details of: a. Proposed lighting regime; b. Number and location of proposed luminaires; c. Luminaire light distribution type; d. Lamp type, lamp wattage and spectral distribution; e. Mounting height, orientation direction and beam angle; f. Type of control gear. Any lighting shall only be installed in accordance with the agreed details/specification. Any change to the lighting specification shall be agreed in writing with the Local Planning Authority prior to any changes being made. 15. Contaminated land – Risk Assessment 16. Contaminated land – Verification Report 17. Contaminated land – Soil Importation 18. Contaminated land – Unexpected Contamination In order to give proper effect to the Board`s/Committee`s intent and without changing the substance of its decision, authority is delegated to the Head of Planning in consultation with the Chair (or in their absence the Vice Chair) to correct any technical slip or omission in the resolution, before issue of the decision notice.