That the application be DEFERRED for the following reasons: 1. To consider and update where necessary any inaccuracies in the submitted data to ensure modelling is accurate. 2. To review the current condition and risks associated with the existing dam wall, and the impact caused by removal of trees on the dam. 3. Encourage engagement with third parties to consider / explain alternatives. 4. To instigate a further independent view, if necessary. 5. To review the location of the proposed mitigation and consideration of any alternatives In order to give proper effect to the Board`s/Committee`s intent and without changing the substance of its decision, authority is delegated to the Head of Planning in consultation with the Chair (or in their absence the Vice Chair) to correct any technical slip or omission in the resolution, before issue of the decision notice.
Word for word from the decision Cheshire East published for this meeting.Source: moderngov.cheshireeast.gov.uk
23/4152M THE DAM EMBANKMENT OF POYNTON POOL RESERVOIR, POYNTON PARK, LONDON ROAD NORTH (B5092), POYNTON Notes:
1. All dimensions are in millimetres unless noted otherwise.
2. All chainages are in metres unless noted otherwise.
3. All levels are in metres above Ordnance Datum unless noted otherwise.
4. Do not scale from this drawing.
rth 5. Red line boundary area = 7682m²
No ad Key
Ro Red line boundary
don Poynton Park - In the
Lon Ownership of Cheshire An East Council gle se yD riv e - P02- WALTONB1 \\europe.jacobs.com\dc4\MFS\Projects\Rivers Active\Projects\BRJ10627 PoyntonFloodStudy\04 Technical\04 DWGs\BRJ10627-JAC-XX-XX-DR-CI-1001.dwg
Poynton Pool - 17/05/2023 09:50:24
Ang lese yD rive For Planning P02 2023-03-27 BW CG AB BM For Pre-Application P01 2022-10-10 GDM CG AB BM
Rev Rev. Date Purpose of revision Orig Check'd Rev'd Apprv'd
y copyright. Limitation: This drawing has been prepared on behalf of, and for the exclusive use of Jacobs' Client, and is subject
bur AD G RA I N
to, and issued in accordance with, the provisions of the contract between Jacobs and the Client. Jacobs accepts no liability or TOC
W
ston AU D responsibility whatsoever for, or in respect of, any use of, or reliance upon, this drawing by any third party.
Gla Notes:
1. All dimensions are in millimetres unless noted otherwise.
Poynton Pool car park. Fence line at Chainage 502m 2.All levels are in metres above Ordnance Datum Proposed location for unless noted otherwise. Contractor compound 3.Do not scale from this drawing.
For detailed Plan refer to Drg.No 4.For drawings showing the required tree and vegetation removal see drawings 40m long area of full tree BRJ10627-JAC-XX-XX-DR-CI-1006 BRJ10627-JAC-XX-XX-DR-EN-0009 and BRJ10627-JAC-XX-XX-DR-EN-00010. clearance across full crest to spread out overflow in 5. For plan showing full extents of services see extreme events for dam drawing BRJ10627-JAC-XX-XX-DR-CI-1012. An gle safety requirements. See note se yD riv e 4. 500m long kerb line set at Key 91.3mAOD to spread out overflow in extreme events Proposed side slope (1 in 4 for dam safety requirements steepest)
Proposed (approximately 2m wide)
orth compacted gravel footpath
dN Roa don Proposed Kerb
Lon For detailed Plan refer to Drg.No Proposed grass verge BRJ10627-JAC-XX-XX-DR-CI-1005 Area of tree clearance across full crest - P02- WALTONB1 \\europe.jacobs.com\dc4\MFS\Projects\Rivers Active\Projects\BRJ10627 PoyntonFloodStudy\04 Technical\04 DWGs\BRJ10627-JAC-XX-XX-DR-CI-1002.dwg
Existing Overflow Spillway Pipe Existing Spillway Overflow Pipe located at Chainage 332m. Spillway Crest at 90.63m AOD - 28/04/2023 11:46:34
Existing Public Poynton Pool
An Footpath
g les ey Dr ive For detailed Plan refer to Drg.No BRJ10627-JAC-XX-XX-DR-CI-1004
For Planning P02 2023-03-27 BW CG AB BM For Pre-Application P01 2022-10-10 GDM CG AB BM
Rev Rev. Date Purpose of revision Orig Check'd Rev'd Apprv'd
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.