23/4152M - The proposed removal of low points along approximately 480m of the Poynton Pool dam embankment and slightly raising the level of crest to increase the flood resilience of the reservoir.
RefusedPlanning2 papers
AI summaryCheshire East's Strategic Planning Board refused a 480 metre flood resilience scheme at Poynton Pool Reservoir dam, against officer advice, citing loss of trees and insufficient embankment stability evidence.
Written from the decision and the officer reportPDF Pro
OutcomeRefusedContrary to officer recommendation
MoneyNot stated
What happens nextDelegation to Head of PlanningFor wording changes to the decision
Who it affectsPoynton Pool dam embankmentTrees and flood resilience works
What was decided
Application 23/4152M was refused, contrary to the officer recommendation, on two grounds.
Reason 1: the scheme is contrary to Policy ENV6 of the Site Allocation and Development Policy due to loss of trees and absence of replacement on the site.
Reason 2: the scheme is contrary to Policy SE12 of the Cheshire East Local Plan as insufficient evidence was submitted to show that tree removal would not damage embankment stability.
Why
The proposal would remove low points along approximately 480m of the Poynton Pool dam embankment and slightly raise the crest level to increase flood resilience of the reservoir. Report P1
The Board found the loss of trees on the embankment, with no replacement on the site, unacceptable against Policy ENV6.
The Board found the application did not provide enough evidence that the tree removal would not harm embankment stability, contrary to Policy SE12.
What happens next
The Head of Planning has delegated authority, in consultation with the Chair of the Strategic Planning Board, to make changes to the wording of the decision, including conditions, informatives, planning obligations or reasons.
Any such changes must not exceed the substantive nature of the Committee's decision.
Options considered
Rejected: Officer recommendation (implied approval). Board found conflict with Policies ENV6 and SE12
Chosen: Refusal of application 23/4152M. Loss of trees with no on-site replacement and insufficient evidence on embankment stability
Implications
Legal: Decision creates a planning refusal record against the Site Allocation and Development Policy and the Cheshire East Local Plan, which the applicant could test at appeal.
Environment: Trees along the embankment, including those shown in the Arboricultural Assessment on the Landscape Plans, would have been removed under the proposed scheme. Report P959, P1040
Risk: Board flagged that tree removal could affect embankment stability of the reservoir, a key flood risk asset. Report P245
Other: Drawings proposed a 500m kerb line at 91.3mAOD above the existing spillway crest at 90.63mAOD, with a new compacted gravel footpath around 2m wide. Report P287, P294, P289
Who and where
Poynton Pool Reservoir dam embankment and surrounding park Report P1, P245
Trees on the embankment identified in the Arboricultural Assessment Report P959
Properties and areas downstream benefiting from reservoir flood resilience Report P245, P247
Land at Walnut Tree Farm proposed for 0.35 hectares of compensatory woodland planting Report P447, P448
Timeline
2022-10-10: Pre-application revision P01 of the engineering drawings issued Report P297, P351
2023-03-27: For-planning revision P02 of the engineering drawings issued Report P297, P351
2025-11-28 to 2025-12-10: Revisions P03 to P06 issued to reflect updates to the scheme Report P297, P323, P351, P378, P409, P1012, P1101
ENV6: Policy ENV6 of the Site Allocation and Development Policy, cited on trees and replacement planting.
SE12: Policy SE12 of the Cheshire East Local Plan, cited on embankment stability and tree removal.
AOD: Above Ordnance Datum, the height reference used for the dam and proposed kerb levels.
Crest: The top of the dam embankment that the proposal seeks to slightly raise.
BNG: Biodiversity Net Gain, with the papers referencing a 30 year maintenance requirement for new habitats.
What was decided, why, and what happens next
Pro reads every officer report for you and explains each decision in plain English: the money, the options, the risks, the timeline, each with the paragraph it came from.
Written by AI from the council's published papers. AI can get things wrong: the council's own wording below is the record.Report a problem
Item40
Resolved
That the application be REFUSED, contrary to officer recommendation for the following reasons: 1 contrary to Policy ENV6 of the Site Allocation and Development Policy due to loss of trees and absence of replacement on the site. 2 contrary to Policy SE12 of the Cheshire East Local Plan as not sufficient evidence submitted to show that tree removal would not damage the embankment stability. In the event of any changes being needed to the wording of the Board’s decision (such as to delete, vary or add conditions / informatives / planning obligations or reasons for approval / refusal) prior to the decision being issued, the Head of Planning has delegated authority to do so in consultation with the Chair of the Strategic Planning Board, provided that the changes do not exceed the substantive nature of the Committee’s decision.
Word for word from the decision Cheshire East published for this meeting.Source: moderngov.cheshireeast.gov.uk
copyright. Limitation: This drawing has been prepared on behalf of, and for the exclusive use of Jacobs' Client, and is subject EG
AD G RA I N
y to, and issued in accordance with, the provisions of the contract between Jacobs and the Client. Jacobs accepts no liability or
bur TOC
W
AU D responsibility whatsoever for, or in respect of, any use of, or reliance upon, this drawing by any third party.
on G last Notes:
1. All dimensions are in millimetres unless noted otherwise.
Poynton Pool car park. Fence line at Chainage 502m 2.All levels are in metres above Ordnance Datum Proposed location for unless noted otherwise. Contractor compound 3.Do not scale from this drawing.
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
23/4152M: The proposed removal of low points along approximately 480m of the Poynton Pool dam embankment and slightly raising the level of crest to increase the flood resilience of the reservoir. A kerb alongside an enhanced footpath will create the crest level at The Dam Embankment of Poynton PoolMinutes
4023/4152M - The proposed removal of low points along approximately 480m of the Poynton Pool dam embankment and slightly raising the level of crest to increase the flood resilience of the reservoir.This decision
23/4152M - The proposed removal of low points along approximately 480m of the Poynton Pool dam embankment and slightly raising the level of crest to increase the flood resilience of the reservoir.This decision
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.