AI summaryCheshire East's Northern Planning Committee has approved application 25/1985/FUL for a dwelling at Bryancliffe, Wilmslow Park South, subject to 22 conditions covering materials, trees, biodiversity, and drainage.
Written from the decision and the officer reportPDF Pro
OutcomeApprovedSubject to listed planning conditions
MoneyNot stated
What happens nextSubmit details before work startsDrainage, contamination, landscaping required first
Who it affectsWilmslow Park South areaNeighbours on Park Road and nearby roads
What was decided
The committee approved the application, subject to 22 listed conditions covering time limits, approved plans, materials, construction management, trees, landscaping, biodiversity, drainage, contamination, and obscure glazing.
The Head of Planning was given delegated authority, with the Northern Planning Committee Chair, to make minor changes to the wording of conditions before the decision is issued.
Why
The committee approved the application in line with the supporting officer report.
What happens next
Before work starts, the applicant must submit a Construction Management Plan for highways, a method statement for car park construction protecting trees, and an engineer designed construction specification for trees.
Drainage, contamination risk assessments, material samples, landscaping details, boundary treatment, a Biodiversity Net Gain scheme, and a hedgehog avoidance method statement are also required before or during construction.
Work must begin within three years, otherwise the planning permission expires.
Implications
Other: A TPO Wellingtonia tree and a Root Protection Area of 21.53 Sq.M, 15.73% of the total RPA, are on site, requiring an engineer designed construction method statement and compliance with the submitted arboricultural statement. Report P37, P283
Other: Biodiversity Net Gain, bird nesting season avoidance, and a hedgehog avoidance method statement are required as conditions.
Other: Multiple contamination conditions apply, including risk assessments, verification, soil testing for imported material, and reporting of unexpected contamination.
Other: A drainage scheme must be submitted before construction starts.
Other: External materials include red rustic brick, ashlar stone coping, slate roof, metal gutters, green wall, vertical fluted brickwork, and metal cladded spandrel. Report P49, P61, P74, P86
Climate: The dwelling includes a photovoltaic system on the roof, an air source heat pump, and an electric vehicle charge point. Report P30, P200, P212, P227, P241
Other: Obscure glazing is required on certain windows to protect neighbour privacy. Report P87, P88
Other: A 21 meter overlooking visibility splay is shown on the site plan to safeguard neighbour amenity. Report P22
Who and where
Neighbours in Wilmslow Park South, Wilmslow Park Road, Fulmards Close, and The Chase Report P6, P7, P8, P9, P10, P11, P12, P13, P14
The applicant, Oaklyn Construction Ltd Report P42, P54, P68, P79, P126
Timeline
06.09.2023: Initial issue of proposed site plan Report P39
BNG: Biodiversity Net Gain, a requirement for development to leave biodiversity in a better state than before
RPA: Root Protection Area, the area around a tree where roots are protected during construction
TPO: Tree Preservation Order, a legal protection placed on specific trees
PV: Photovoltaic, solar panels that generate electricity from sunlight
ASHP: Air Source Heat Pump, a renewable heating system that extracts heat from outside air
What was decided, why, and what happens next
Pro reads every officer report for you and explains each decision in plain English: the money, the options, the risks, the timeline, each with the paragraph it came from.
Written by AI from the council's published papers. AI can get things wrong: the council's own wording below is the record.Report a problem
Item61
Resolved
That for the reasons set out in the report the application be APPROVED subject to conditions as detailed below; 1. 3-year Time Limit 2. Development in accord with approved plans 3. Material samples to be submitted 4. Construction Management Plan (highways) to be submitted 5. Method statement required for construction of car park (trees) 6. Submission of existing and proposed levels 7. Bird nesting season avoidance Biodiversity enhancement scheme to be submitted 8. BNG 9. Landscaping scheme to be submitted 10. Landscaping details and maintenance to be submitted 11. Boundary treatment plan to be submitted 12. Drainage scheme to be submitted prior to commencement 13. Contamination risk assessments to be submitted 14. Verification and remediation (contamination) to be submitted 15. Testing of soil to be imported 16. Reporting of unexpected contamination 17. Obscure glazing 18. Development to be carried out in accordance with submitted arboricultural statement 19. Engineer designed construction Specification / Method Statement to be submitted (trees) 20. Landscape management plan to be submitted 21. Landscape maintenance plan for the communal gardens. 22. Hedgehog avoidance method statement to be submitted In the event of any changes being needed to the wording of the Committee’s decision (such as to delete, vary or add conditions / informatives / planning obligations or reasons for approval/refusal) prior to the decision being issued, the Head of Planning has delegated authority to do so in consultation with the Chairman of the Northern Planning Committee, provided that the changes do not exceed the substantive nature of the Committee’s decision.
Word for word from the decision Cheshire East published for this meeting.Source: moderngov.cheshireeast.gov.uk
All drawings should be read in conjunction with the entire PL Series drawings. Full details and specifications will be provided following approval of the planning application and through a formal Building Control submission prior to commencement of site works & construction.
N E
W S
Site Boundary
Existing Pine Lodge Cilgerran Bryancliffe
Downers Grove
Wilmslow Park Road The Chase
Southfields Oakdene
Fulmards Close
Copse Edge
Bollinholme
Holly Bank House
The Bows Windover
P0 Amended to Council Comments 04.12.24 KZ Rev Description Date By Drawing Rev Project Date 04/12/24 618-PKA-XX-PL01 618 Site Location Plan P0 Bryancliffe Scale As @ A3 indicated 0 1 2 3 4 5 10 15 Graphical Scale 1:200
All drawings should be read in conjunction with the entire PL Series drawings. Full details and specifications will be provided following approval of the planning application and through a formal Building Control submission prior to commencement of site works & construction.
N E
W S
Proposal Submitted in 2008
Peak Architects Initial Proposal
Site Boundary
21-meter Overlooking Visibility Splay
Root Protection Area
Existing Tree to be Removed (refer to Landscape Layout)
Existing Tree to be Retained (refer to Landscape Layout)
Existing Grass
5 Proposed Trees (refer to Landscape Layout) 5 5 Proposed Woodland Planting (refer to Landscape Layout)
Parking Parking Proposed Paths and Patios (refer to Landscape Layout) Parking
Proposed Drive (refer to Landscape Layout)
Parking 01 Proposed Bike Storage 02 Proposed Bin Storage 2 03 Proposed PV Panels 04 Proposed Air Source Heat Pump Parking 2 05 Proposed Electric Vehicle Charge Point
4 4 4
Parking
Porch Apartment Entrance Wilmslow Park Road
Parking
Disabled Parking
Adjacent house
RL RL 21.53 Sq.M (15.73% of RPA)
Fulmards Close
P11 Amended to Planner 21.11.25 VR comments P10 Amended to Planner 11.09.25 KZ Comments P9 Amended to Planning 05.09.25 KZ Comments P8 Amended to Daylight 02.05.25 KZ Assessment Feedback P7 Amended to Planner 24.03.25 KZ Bollinholme Comments P6 Revised Building Footprint 05.03.25 KZ P5 Amended to Council 28.02.25 KZ Comments P4 Amended to Council 13.12.24 KZ Comments P3 Updated following planning 28.08.24 WB meeting P2 Levels updated. 09.10.23 BW Proposed Site Plan P1 Drawing updated. 20.09.23 BW P0 Initial Issue 06.09.23 BW 1 : 200 Rev Description Date By
Oaklyn Construction Ltd Drawing 618-PKA-XX-A-PL03 Proposed Site Plan Revision P11 Date Created 04.09.2023 Suitability S3 Scale As indicated @ A1 Drawn By BW Checked By ZW
Planning 0 1 2 3 4m Graphical Scale 1:50
All drawings should be read in conjunction with the entire PL Series drawings. Full details and specifications will be provided following approval of the planning application and through a formal Building Control submission prior to commencement of site works & construction.
Proposal Submitted in 2008
Peak Architects Initial Proposal
03 01
Material Key 01 Proposed Red Rustic Brick Walls 02 Proposed Brick Corbel Detail 03 Proposed Ashlar Stone Wall Coping 04 Proposed Glazed Door and Window 05 Proposed Glass Balusrade 06 Proposed Green Wall 07 Proposed Stone Window Sills, Heads and Jambs 08 Proposed Slate Roof 09 Proposed Ashlar Stone Walls 10 Proposed Metal Gutters and Downpipes 11 Proposed Vertical Fluted Brickwork 12 Proposed Metal Cladded Spandrel 13 Proposed Steel Structure 14 Proposed Plank Door with Glazed Inset 2
4 1 3
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.