Resolved
Resolved That planning permission be GRANTED subject to the following conditions: 1 The development hereby permitted shall be begun before the expiration of three years from the date of this permission. Reason : To comply with the requirements of Section 91 (1) of the Town and Country Planning Act 1990 as amended by Section 51 (1) of the Planning and Compulsory Purchase Act 2004. 2 The development hereby permitted shall be carried out in accordance with the following approved plans/documents: Wren naj 70c 2016 rev B Wrend 70 b 2016 REvA Reason: For the avoidance of doubt and in the interests of proper planning. 3 The materials to be used in the construction of the external surfaces of the dwelling hereby permitted shall match in size, colour and texture those used on the existing building at 52 Ridgeway Reason : To ensure a satisfactory appearance to the development in accordance with Adopted Core Strategy CS12 4 Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) Order 2015 (or any Order amending or re-enacting that Order with or without modification) no development falling within the following classes of the Order shall be carried out without the prior written approval of the local planning authority: Schedule 2 Part 1 Classes A and B Reason : To enable the local planning authority to retain control over the development in the interests of safeguarding the amenity of neighbouring properties in accordance with policies CS12 of the Core Strategy 5 Prior to the first occupation of the development hereby permitted a visibility splay shall be provided in full accordance with the details indicated on the approved plan Wren naj 70c 2016 rev B. The splay shall thereafter be maintained at all times free from any obstruction between 600mm and 2m above the level of the adjacent highway carriageway. Reason: In the interests of highway safety and in accordance with saved policy 58 of the Local Plan (1991) and policy CS12 of the Core Strategy (2013) Informatives AN1) Where works are required within the public highway to facilitate the new or amended vehicular access, the Highway Authority require the construction of such works to be undertaken to their satisfaction and specification, and by a contractor who is authorised to work in the public highway. If any of the works associated with the construction of the access affects or requires the removal and/or the relocation of any equipment, apparatus or structures (e.g. street name plates, bus stop signs or shelters, statutory authority equipment etc.) the applicant will be required to bear the cost of such removal or alteration. Before works commence the applicant will need to ... view the full minutes text for item 163.