Resolved
Resolved That planning permission be GRANTED subject to the following conditions: 1 The development hereby permitted shall be begun before the expiration of three years from the date of this permission. Reason : To comply with the requirements of Section 91 (1) of the Town and Country Planning Act 1990 as amended by Section 51 (1) of the Planning and Compulsory Purchase Act 2004. 2 The development hereby permitted shall be constructed in accordance with the materials specified on the approved drawings. Reason : For the avoidance of doubt and to ensure a satisfactory appearance to the development in accordance with Policy CS12 of the Dacorum Core Strategy September 2013 and saved Appendix 7 of the Dacorum Borough local Plan 1991-2011. 3 The proposed timber screen shown on Drg. No. 197 pa2.04 shall be a minimum of 1.7 metres in height above the floor of the roof terrace and the balustrade shall be set back as shown on Drg No. 197 pa2.03/A. Both shall be erected prior to the first use of the terrace and shall thereafter be retained in position. Reason : For the avoidance of doubt and to preserve the amenities of the adjacent residential property in accordance with Policy CS12 of the Dacorum Core Strategy September 2013. 4 The development hereby permitted shall be carried out in accordance with the following approved plans: 197 SUL.01 197 PA2.01 197 PA2.02 197 PA2.03/A 197 PA2.04 197 PA2.05/A Reason: For the avoidance of doubt and in the interests of proper planning. Article 35 Statement Planning permission has been granted for this proposal. The Council acted pro-actively through positive engagement with the applicant during the determination process which led to improvements to the scheme. The Council has therefore acted pro-actively in line with the requirements of the Framework (paragraphs 186 and 187) and in accordance with the Town and Country Planning (Development Management Procedure) (England) (Amendment No. 2) Order 2015.