Resolved
That planning permission be GRANTED subject to the following conditions; No Condition 1 The development hereby permitted shall be begun before the expiration of three years from the date of this permission. Reason: To comply with the requirements of Section 91 (1) of the Town and Country Planning Act 1990 as amended by Section 51 (1) of the Planning and Compulsory Purchase Act 2004. 2 Vehicular visibility splays of 2.4m x 43m shall be provided, and thereafter maintained, in both directions from the access, within which there shall be no obstruction to visibility between a height of 0.6m and 2m above the carriageway. Reason: In the interest of highway safety, in accordance with Core Strategy (2013) Policy CS8. 3 Pedestrian visibility splays of 2m x 2m shall be provided, and thereafter maintained, on both sides of the new vehicle crossovers, which will be restricted to a double width, ie as per Roads in Herts - Highway Design Guide 3rd ed guidance, within which there shall be no obstruction to visibility between 0.6m and 2m above the carriageway. Reason: In the interest of highway safety, in accordance with Core Strategy (2013) Policy CS8. 4 Before the replacement dwelling approved under application reference 4/00489/18/FUL is occupied all on site vehicular areas shall be surfaced in a manner to the Local Planning Authority's approval so as to ensure satisfactory parking of vehicles outside highway limits. Arrangements shall be made for surface water from the site to be intercepted and disposed of separately so that it does not discharge into the highway. Reason: In order to minimise danger, obstruction, and inconvenience to users of the highway and of the premises, in accordance with Core Strategy (2013) Policy CS8. 5 The development hereby permitted shall be carried out in accordance with the following approved plans/documents: 17 515 PL30 17 515 PL31 Reason: For the avoidance of doubt and in the interests of proper planning, in accordance with Core Strategy (2013) Policy CS12. Article 35 Planning permission has been granted for this proposal. Discussion with the applicant to seek an acceptable solution was not necessary in this instance. The Council has therefore acted pro-actively in line with the requirements of the Framework (paragraph 38) and in accordance with the Town and Country Planning (Development Management Procedure) (England) Order 2015. INFORMATIVES 1. Construction Hours of Working - (Plant & Machinery). In accordance with the councils adopted criteria, all noisy works associated with site demolition, site preparation and construction works shall be limited to the following hours: 0730hrs to 1830hrs on Monday to Saturdays, no works are permitted at any time on Sundays or bank holidays. 2. The Highway Authority requires the alterations to or ... view the full minutes text for item 107.