Item5h
Resolved
GRANTED 1. The development hereby permitted shall begin before the expiration of three years from the date of this permission. Reason: To comply with the requirements of Section 91 (1) of the Town and Country Planning Act 1990, as amended by Section 51 (1) of the Planning and Compulsory Purchase Act 2004. 2. Prior to first use of the development hereby permitted, parking spaces and the vehicular accesses shall be provided and thereafter retained at the position shown on the approved plan drawing number 04H. Prior to the first use of the development hereby permitted arrangement shall be made for surface water to be intercepted and disposed of separately so that it does not discharge onto the highway carriageway. Reason: To ensure satisfactory parking, access into the site and avoid the carriage of extraneous material or surface water onto the highway , in accordance Policy CS8 of the Dacorum Borough Core Strategy (2013), Policy 5 of Hertfordshire's Local Transport Plan (2018), the National Planning Policy Framework (2019), and the Car Parking Standards SPD (November 2020) 3. Notwithstanding the submitted plans, full details of the layout and siting of proposed Electric Vehicle Charging Points and any associated infrastructure for the development shall be submitted to and approved in writing by the Local Planning Authority and thereafter implemented prior to first occupation in accordance with the agreed details. Reason: to enable future occupiers to charge low emission vehicles in a safe and accessible way in accordance with Poicy CS8 of the Dacorum Borough Core Strategy (2013), the Dacorum Borough Council Parking Standards Supplementary Planning Document (November 2020), and Paragraph 110 (e) of the National Planning Policy Framework (2019). The SPD identifies three accessibility zones and varies the parking requirement accordingly. The application site is located within Zone 3 wherein a three bedroom dwellings are expected to provide 1.8 spaces per dwelling where the spaces are unallocated, and 2.25 spaces where allocated. The plans shows allocated spaces hence 2.25 spaces. 4. No construction of the superstructure shall take place until full details of both hard and soft landscape works has been submitted to and approved in writing by the Local Planning Authority. These details shall include: o all external hard surfaces within the site; o other surfacing materials; o means of enclosure; o soft landscape works including a planting scheme with the number, size, species and position of trees, plants and shrubs; o minor artefacts and structures (e.g. furniture, play equipment, signs, refuse or other storage units, etc.); and o trees to be retained and measures for their protection during construction works o cycle storage The planting must be carried out within one planting season of completing the development. Any tree or shrub which forms part of the approved landscaping scheme which within a period of 2 years ... view the full minutes text for item 5h
Word for word from the decision Dacorum published for this meeting.
Source: democracy.dacorum.gov.uk