Item5b
Resolved
GRANTED 1. The development hereby permitted shall begin before the expiration of three years from the date of this permission. Reason: To comply with the requirements of Section 91 (1) of the Town and Country Planning Act 1990, as amended by Section 51 (1) of the Planning and Compulsory Purchase Act 2004. 2. The development hereby permitted shall be carried out in accordance with the following approved plans/documents: C4T5/FOU/FLA2-P02 Rev. C C4T5/FOU/FLA2-P04 Rev. G C4T5/FOU/FLA4 - S03/1 Rev. N Reason: For the avoidance of doubt and in the interests of proper planning. 3. Prior to the first occupation of the development hereby permitted the proposed access, on-site car parking and turning area shall be laid out, demarcated, surfaced and drained in accordance with the approved plan and retained thereafter available for that specific use. Reason: To ensure construction of a satisfactory development and in the interests of highway safety in accordance with Policy 57 of the Dacorum Borough Local Plan. 4. No development shall commence until a Construction Management Plan has been submitted to and approved in writing by the Local Planning Authority. Thereafter the construction of the development shall only be carried out in accordance with the approved Plan. The Construction Management Plan shall include details of: a. Construction vehicle numbers, type, b. Access arrangements to the site; c. Construction and storage compounds (including areas designated for car parking, loading / unloading and turning areas); d. Siting and details of wheel washing facilities; e. Timing of construction activities (including delivery times and removal of waste) and to avoid school pick up/drop off times; f. where works cannot be contained wholly within the site a plan should be submitted showing the site layout on the highway including extent of hoarding, pedestrian routes and remaining road width for vehicle movements . Reason: In order to protect highway safety and the amenity of other users of the public highway and rights of way in accordance with Policy CS8 of the Dacorum Core Strategy (2013). 5. No development shall take place until full details of the layout and siting of Electric Vehicle Charging Points and any associated infrastructure have been submitted to and approved in writing by the local planning authority. The development shall not be occupied until these measures have been provided and these measures shall thereafter be retained fully in accordance with the approved details. Reason: To enable future occupiers to charge low emission vehicles in a safe and accessible way in accordance with Policy CS8 of the Dacorum Borough Core Strategy (2013), the Dacorum Borough Council Parking Standards Supplementary Planning Document, and Paragraph 110 (e) of the National Planning Policy Framework (2019). 6. No demolition/development shall take place/commence until a Written Scheme of Investigation has been submitted to and approved by the local planning authority ... view the full minutes text for item 5b
Word for word from the decision Dacorum published for this meeting.
Source: democracy.dacorum.gov.uk