Resolved
Granted Condition(s) and Reason(s): 1. The development hereby permitted shall begin before the expiration of three years from the date of this permission. Reason: To comply with the requirements of Section 91 (1) of the Town and Country Planning Act 1990, as amended by Section 51 (1) of the Planning and Compulsory Purchase Act 2004. 2. The materials to be used between the windows must comply with those materials submitted to discharge condition 2 of 20/00089/FUL under 21/00196/DRC. (A covering letter was submitted with the DRC showing the details of the materials to be used between the windows as Vertical Timber Cladding painted Black - a photo showing part of the building constructed with these materials was submitted.) Reason: To ensure satisfactory appearance to the development and to safeguard the visual character of the area in accordance with Policies CS12 and CS27 of the Dacorum Borough Core Strategy (2013). 3. The development hereby permitted shall be constructed in accordance with the materials specified on the application form submitted with application 20/00089/FUL with the exception of those which describe boundary treatment and the materials between the windows - these are to be addressed via other conditions which require details of boundary treatment and materials. Reason: To make sure that the appearance of the building is suitable and that it contributes to the character of the area in accordance with Policies CS12 and CS27 of the Dacorum Borough Core Strategy (2013). 4. As shown on the approved plans the full size windows at ground floor on the eastern elevation must be non – opening to ensure that no permanent access is allowed to this side of the dwelling and thus further enlargement of the curtilage of the dwelling. Reason: To avoid any encroachment into the Green Belt by the construction of a footpath along this side boundary and therefore to comply with the NPPF and CS 5 Green Belt. 5. All remediation or protection measures identified in the Remediation Statement referred to in Condition (4) of planning application 4/01658/16/FUL shall be fully implemented within the timescales and by the deadlines as set out in the Remediation Statement and a Site Completion Report shall be submitted to and approved in writing by the local planning authority prior to the first occupation of any part of the development hereby permitted. For the purposes of this condition a Site Completion Report shall record all the investigation and remedial or protection actions carried out. It shall detail all conclusions and actions taken at each stage of the works including validation work. It shall contain quality assurance and validation results providing evidence that the site has been remediated to a standard suitable for the approved use. Reason: To ensure that the issue of ... view the full minutes text for item 5d