Resolved
Resolved; Granted Condition(s) and Reason(s): 1. The development hereby permitted shall begin before the expiration of three years from the date of this permission. Reason: To comply with the requirements of Section 91 (1) of the Town and Country Planning Act 1990, as amended by Section 51 (1) of the Planning and Compulsory Purchase Act 2004. 2. No development shall take place until the final design of the drainage scheme is submitted to and approved in writing by the Local Planning Authority, in consultation with the Lead Local Flood Authority. The surface water drainage system will be based on the submitted the Flood Risk Assessment reference M03001-04_FR07 dated December 2020 prepared by McCloy Consulting and Drainage Strategy reference M03001-04_DG03 dated December 2020 prepared by McCloy Consulting. The scheme shall also include: 1. Limiting the surface water run-off rates to a maximum of 2l/s for all rainfall events up to and including the 1 in 100 year + climate change event with discharge into the Thames surface Water sewer. 2. Provide attenuation to ensure no increase in surface water run-off volumes for all rainfall events up to and including the 1 in 100 year + climate change event. 3. Implement drainage strategy to include permeable paving, filter drain and attenuation tank. 4. Where infiltration is proposed infiltration testing in accordance with BRE Digest 365 at the proposed depth and location of the proposed SuDS feature. 5. Detailed engineered drawings of the proposed SuDS features including their location, size, volume, depth and any inlet and outlet features including any connecting pipe runs and all corresponding calculations/modelling to ensure the scheme caters for all rainfall events up to and including the 1 in 100 year + 40% allowance for climate change event, with a supporting contributing area plan. 6. Demonstrate appropriate SuDS management and treatment for the entire site including the access road. To include exploration of source control measures and to include above ground features such as permeable paving. 7. Maintenance and management plan for the SuDS features. The scheme shall be implemented in accordance with the approved details. Reason: To prevent flooding by ensuring the satisfactory storage of and disposal of surface water from the site in accordance with Policy CS31 of the Dacorum Borough Core Strategy (2013) and Paragraphs 163 and 165 of the National Planning Policy Framework (2019). 3. (a) The Local Planning Authority is of the opinion that the Preliminary Investigation Report submitted at the planning application stage (Document Reference: RSK Preliminary Risk Assessment 1921152-06(00) March 2020) indicates a reasonable likelihood of harmful contamination and so no development approved by this permission shall be commenced until a Site Investigation (Phase II environmental risk assessment) report has been submitted to and approved by the Local Planning Authority which includes: (i) A full identification of the ... view the full minutes text for item 5a